Council planning record

A previous tree Survey was carried out in October 2023, I am applying for the works that have been shown in this survey with some minor additions.I am also applying for works requested by the Park estate management to help keep Park Valley road clear for vehicle.Works Referred/Recommended within tree survey:G001: Remove dead central Leylandii stem.G004: Remove 4 self set Sycamores to prevent future problems with park valley road.T014: Elms has large amount of epicormic at base which appears to of been maintained previously and is due a manageable retrim as it is starting to interfere with others trees.T015: Korean pine dead to be removed.T018: Sycamore canopy raise up to 5.2 meters clear highway for vehicle access.T020: Robinia canopy raise up to 5.2 meters clear highway for vehicle access.T022: Remove Ash tree diagnosed with die back, I have re-assessed and can confirm it has further deteriorated. T028: Clear lower epicormic growth up to 3 meters only on main stem.Other works not mentioned in report:Major Deadwood Oak and 3 lime trees identified to have large deadwood in canopy.Remove 3 large clumps of Ivy within garden not visible to public, to prevent too much spread of Ivy.Sever Ivy at base of all larger trees.Remove 1 stem of twin stemmed holly which is leaning significantly into highway.Trim back overhanging shrubbery (this is the regular trimmed mixed hedge) back to boundary up to 5.2 meters along Park valley road.I have been unable to attach the full report as it is over the 10mb threshold, I have taken what I believe to bee the relevant parts of the survey.if you require the Full report, please don't hesitate to contact myself or the property owner.

Tree Tops Clare Valley Nottingham Nottingham City NG7 1BU

DecidedReference: 24/01928/PTPONottingham City Council

Last published check: 30 Sept 2026, 04:35. Check the council record for more recent changes.

Application location

Tree Tops Clare Valley Nottingham Nottingham City NG7 1BU

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Works to trees protected by TPO
Received
4 Nov 2024
Validated
4 Nov 2024
Determination deadline
30 Dec 2024
Local authority
Nottingham City Council

Application overview

A previous tree Survey was carried out in October 2023, I am applying for the works that have been shown in this survey with some minor additions.I am also applying for works requested by the Park estate management to help keep Park Valley road clear for vehicle.Works Referred/Recommended within tree survey:G001: Remove dead central Leylandii stem.G004: Remove 4 self set Sycamores to prevent future problems with park valley road.T014: Elms has large amount of epicormic at base which appears to of been maintained previously and is due a manageable retrim as it is starting to interfere with others trees.T015: Korean pine dead to be removed.T018: Sycamore canopy raise up to 5.2 meters clear highway for vehicle access.T020: Robinia canopy raise up to 5.2 meters clear highway for vehicle access.T022: Remove Ash tree diagnosed with die back, I have re-assessed and can confirm it has further deteriorated. T028: Clear lower epicormic growth up to 3 meters only on main stem.Other works not mentioned in report:Major Deadwood Oak and 3 lime trees identified to have large deadwood in canopy.Remove 3 large clumps of Ivy within garden not visible to public, to prevent too much spread of Ivy.Sever Ivy at base of all larger trees.Remove 1 stem of twin stemmed holly which is leaning significantly into highway.Trim back overhanging shrubbery (this is the regular trimmed mixed hedge) back to boundary up to 5.2 meters along Park valley road.I have been unable to attach the full report as it is over the 10mb threshold, I have taken what I believe to bee the relevant parts of the survey.if you require the Full report, please don't hesitate to contact myself or the property owner.

Proposal details

Reference
24/01928/PTPO
Alternative references
PP-13530573
Ward
Castle (May 2019)
Agent
Commando Climbers Tree Specialists

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 11 of 11

DocumentPublishedAction
TPO Tree Works ExemptDecision Notice · PDF5 Nov 2024View
PHOTO 1Layout Plans & Elevations4 Nov 2024View
PHOTO 2Layout Plans & Elevations4 Nov 2024View
PHOTO 3Layout Plans & Elevations4 Nov 2024View
PHOTO 4Layout Plans & Elevations4 Nov 2024View
TREE SURVEYReports · PDF4 Nov 2024View
SKETCH PLAN 1Layout Plans & Elevations4 Nov 2024View
SKETCH PLAN 3Layout Plans & Elevations4 Nov 2024View
SKETCH PLAN 2Layout Plans & Elevations4 Nov 2024View
EXISTING SITE PLANSite Location Plan4 Nov 2024View
EXISTING ELEVATIONS - SOUTHLayout Plans & Elevations4 Nov 2024View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

TPO Works Exempt
TPO Tree Works Exempt
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.