Council planning record

T2 Oak - removeT3 Oak - removeThe tree works are proposed to stop the influence of the tree(s) on the soil below building foundation level and provide long term stability.Estimated costs of repair to the building are ?120,000.00 if the influence of the tree(s) remain and ?14,180.00 if the proposed tree works are allowed to proceed. Granting permission will limit these costs. In the event of a refusal we, or our clients, will seek to secure compensation for the additional costs incurred through Section 202(e).Should the tree/s remain the total cost of repairs will be the Superstructural repairs + Alternative method of repairs = ?134,180.00It is the expert opinion of both the case engineer and arboriculturalist that on the balance of probabilities the supporting information demonstrates the influence of the tree(s).Note: Further monitoring results may be submitted if these become available during the course of this application.

42 Lambourne Drive Nottingham Nottingham City NG8 1GR

DecidedReference: 24/00161/PTPONottingham City Council

Last published check: 9 Oct 2026, 07:30. Check the council record for more recent changes.

Application location

42 Lambourne Drive Nottingham Nottingham City NG8 1GR

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Works to trees protected by TPO
Received
31 Jan 2024
Validated
31 Jan 2024
Determination deadline
27 Mar 2024
Local authority
Nottingham City Council

Application overview

T2 Oak - removeT3 Oak - removeThe tree works are proposed to stop the influence of the tree(s) on the soil below building foundation level and provide long term stability.Estimated costs of repair to the building are ?120,000.00 if the influence of the tree(s) remain and ?14,180.00 if the proposed tree works are allowed to proceed. Granting permission will limit these costs. In the event of a refusal we, or our clients, will seek to secure compensation for the additional costs incurred through Section 202(e).Should the tree/s remain the total cost of repairs will be the Superstructural repairs + Alternative method of repairs = ?134,180.00It is the expert opinion of both the case engineer and arboriculturalist that on the balance of probabilities the supporting information demonstrates the influence of the tree(s).Note: Further monitoring results may be submitted if these become available during the course of this application.

Proposal details

Reference
24/00161/PTPO
Alternative references
PP-12769366
Ward
Wollaton West (May 2019)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 5 of 5

DocumentPublishedAction
PTPO Grant Consent - DecisionDecision Notice · PDF7 May 2024View
TREE REPORT REDACTEDReports · PDF5 Feb 2024View
ADDENDUM REPORTReports · PDF31 Jan 2024View
SKETCH PLANLayout Plans & Elevations31 Jan 2024View
LEVEL MONITORING REPORTReports · PDF31 Jan 2024View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Issued Date

    Published milestoneCouncil source

Decision & conditions

Grant conditional consent
PTPO Grant Consent - Decision
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.