Council planning record

Remove the previously coppiced trees between Antler Tattoo and the wall gate to stump / ground level. There is an additional large Sycamore and Hawthorn on this same span, just before the gate. To remove both to ground / stump level.Crown raise the other trees overhanging the highway for the full length of this boundary of Thoresby Court to provide a minimum of 5.2 meters of clearance over the road carriageway and 2.4 meters of clearance over the pedestrian footpath.

Thoresby Court Nottingham

DecidedReference: 23/01694/PWCNottingham City Council

We couldn’t update every section. Some information is from an earlier collection.

Application location

Thoresby Court Nottingham

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Works to trees in Conservation Areas
Received
22 Sept 2023
Validated
23 Oct 2023
Determination deadline
4 Dec 2023
Local authority
Nottingham City Council

Application overview

Remove the previously coppiced trees between Antler Tattoo and the wall gate to stump / ground level. There is an additional large Sycamore and Hawthorn on this same span, just before the gate. To remove both to ground / stump level.Crown raise the other trees overhanging the highway for the full length of this boundary of Thoresby Court to provide a minimum of 5.2 meters of clearance over the road carriageway and 2.4 meters of clearance over the pedestrian footpath.

Proposal details

Reference
23/01694/PWC
Ward
Mapperley (May 2019)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 0 of 0

The document list could not be fully refreshed. View the council record for the complete list.

Document details are unavailable.

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

No objection
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.