Replace boiler in same location (utility room next to gas supply & water) with horizontal flue out the front of the building. The new flue would need to be drilled through the thick wall, but would only be 100mm in diameter and the terminal would be located at cellar level close to a group of downpipes. It can be black to match those.
Replace boiler in same location (utility room next to gas supply & water) with horizontal flue out the front of the building. The new flue would need to be drilled through the thick wall, but would only be 100mm in diameter and the terminal would be located at cellar level close to a group of downpipes. It can be black to match those.
Reference
25/01142/L
Alternative references
PP-14419581
Ward
Thorpe Hamlet
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.