Black Locust (T1): current height 14m and spread 10m. Reduce canopy by up to 2.5m and lateral growth by up to 3.5m to suitable growth points;Western Red Cedar (G1): trim upper canopy;Leylandii (G2): trim garden side and top;Magnolia (T2): reduce height from current 6m by up to 2m and lateral spread from current 3m by up to 1.5m;Viburnum (G3): current height 4m, reduce canopy by up to 1.5m;Variegated Holly (T3): reduce crown height from curreny 4.5m by 2m;Goat Willow (T4): current height 5m and spread 3.5m, reduce lateral spread to suitable pollard points at 1.5m;Leylandii (G4): trim up height and form;Strawberry Tree (T5): reduce crown from current height 7m and spread 3.5m by 1.5m to suitable growth points;New Zealand Privet (G6): reduce back by 1m around lamp post;Cherry Laurel (G7): trim up and tidy.
Black Locust (T1): current height 14m and spread 10m. Reduce canopy by up to 2.5m and lateral growth by up to 3.5m to suitable growth points;Western Red Cedar (G1): trim upper canopy;Leylandii (G2): trim garden side and top;Magnolia (T2): reduce height from current 6m by up to 2m and lateral spread from current 3m by up to 1.5m;Viburnum (G3): current height 4m, reduce canopy by up to 1.5m;Variegated Holly (T3): reduce crown height from curreny 4.5m by 2m;Goat Willow (T4): current height 5m and spread 3.5m, reduce lateral spread to suitable pollard points at 1.5m;Leylandii (G4): trim up height and form;Strawberry Tree (T5): reduce crown from current height 7m and spread 3.5m by 1.5m to suitable growth points;New Zealand Privet (G6): reduce back by 1m around lamp post;Cherry Laurel (G7): trim up and tidy.
Reference
25/01068/TCA
Alternative references
PP-14350297
Ward
Eaton
Agent
Dr Stump Ltd
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.