Awaiting decisionCouncil status: Registered

Listed Building Consent for temporary access to the river/channel will be provided, including vegetation clearance where required. The working area around Bridge Pier 3 will be dewatered using temporary works, including a temporary watercourse diversion via upstream and downstream bagwork cofferdams and a PVC pipe (or suitable alternative) to maintain flows. Riverbed and bank materials will be excavated to formation level, followed by installation of a geotextile layer and rip-rap protection around Pier 3. The rip-rap will be backfilled and tied into upstream and downstream bed levels using reinstated site-won material, with bed levels reprofiled to provide a smooth transition over 2m. Excavated riverbanks will be reinstated using site-won material at slopes up to 1:2, covered with topsoil and biodegradable geotextile, and grass seeded to promote vegetation establishment.

Street Record Carham Berwick Borough Footpath 011 Carham Northumberland

Northumberland County CouncilReference 26/03195/LBCListed Building Consent

Last published check: 16 Sept 2026, 05:48. Check the council record for more recent changes.

Open council website

Status and dates

Last published check: 16 Sept 2026, 05:48 (UK)

43days past target decision date13 Oct 2026 · decision not yet published

  1. DoneReceived10 Sept 2026
  2. DoneValidated15 Sept 2026
  3. ClosedConsultationEnded 6 Oct 2026
  4. Overdue · 43 daysTarget decision date13 Oct 2026
  5. Not yet publishedDecisionNo decision on council record

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (7)
  1. Application Received Date

    Published milestoneCouncil source
  2. Standard Consultation Date

    Published milestoneCouncil source
  3. Application Validated Date

    Published milestoneCouncil source
  4. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Listed Building Consent
Ward
Wooler
Parish
Carham
Documents
16 published

Proposal

Listed Building Consent for temporary access to the river/channel will be provided, including vegetation clearance where required. The working area around Bridge Pier 3 will be dewatered using temporary works, including a temporary watercourse diversion via upstream and downstream bagwork cofferdams and a PVC pipe (or suitable alternative) to maintain flows. Riverbed and bank materials will be excavated to formation level, followed by installation of a geotextile layer and rip-rap protection around Pier 3. The rip-rap will be backfilled and tied into upstream and downstream bed levels using reinstated site-won material, with bed levels reprofiled to provide a smooth transition over 2m. Excavated riverbanks will be reinstated using site-won material at slopes up to 1:2, covered with topsoil and biodegradable geotextile, and grass seeded to promote vegetation establishment.

Reference
26/03195/LBC
Alternative references
PP-15198401
Ward
Wooler
Parish
Carham
Agent
Balfour Beatty

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • PROPOSED SITE PLANPlan15 Sept 2026View
  • PROPOSED WORKSPlan10 Sept 2026View
  • REDACTEDApplication Form9 Sept 2026View
  • Location PlanLocation Plan9 Sept 2026View
  • PROPOSED WORKSSuperseded9 Sept 2026View
  • PHOTOGRAPHSPhoto9 Sept 2026View
  • HERITAGE STATEMENTReport/ Statement9 Sept 2026View
  • DESIGN AND ACCESS STATEMENTReport/ Statement9 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Decision not yet published

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.