Council planning record

Temporary access to the river/channel will be provided, including vegetation clearance where required. The working area around Bridge Pier 3 will be dewatered using temporary works, including a temporary watercourse diversion via upstream and downstream bagwork cofferdams and a PVC pipe (or suitable alternative) to maintain flows. Riverbed and bank materials will be excavated to formation level, followed by installation of a geotextile layer and rip-rap protection around Pier 3. The rip-rap will be backfilled and tied into upstream and downstream bed levels using reinstated site-won material, with bed levels reprofiled to provide a smooth transition over 2m. Excavated riverbanks will be reinstated using site-won material at slopes up to 1:2, covered with topsoil and biodegradable geotextile, and grass seeded to promote vegetation establishment.

Street Record Carham Berwick Borough Footpath 011 Carham Northumberland

RegisteredReference: 26/03194/FULNorthumberland County Council

Last published check: 16 Sept 2026, 05:12. Check the council record for more recent changes.

Application location

Street Record Carham Berwick Borough Footpath 011 Carham Northumberland

This record has no verified map location.

View council map

Application summary

Status
Registered
Application type
Full Application
Received
9 Sept 2026
Validated
15 Sept 2026
Determination deadline
13 Oct 2026
Local authority
Northumberland County Council

Application overview

Temporary access to the river/channel will be provided, including vegetation clearance where required. The working area around Bridge Pier 3 will be dewatered using temporary works, including a temporary watercourse diversion via upstream and downstream bagwork cofferdams and a PVC pipe (or suitable alternative) to maintain flows. Riverbed and bank materials will be excavated to formation level, followed by installation of a geotextile layer and rip-rap protection around Pier 3. The rip-rap will be backfilled and tied into upstream and downstream bed levels using reinstated site-won material, with bed levels reprofiled to provide a smooth transition over 2m. Excavated riverbanks will be reinstated using site-won material at slopes up to 1:2, covered with topsoil and biodegradable geotextile, and grass seeded to promote vegetation establishment.

Proposal details

Reference
26/03194/FUL
Alternative references
PP-15198401
Ward
Wooler
Parish
Carham
Agent
Balfour Beatty

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 16 of 16

DocumentPublishedAction
PROPOSED SITE PLANPlan · PDF15 Sept 2026View
PROPOSED WORKSPlan · PDF10 Sept 2026View
REDACTEDApplication Form · PDF9 Sept 2026View
Location PlanLocation Plan · PDF9 Sept 2026View
PROPOSED WORKSSuperseded · PDF9 Sept 2026View
PHOTOGRAPHSPhoto · PDF9 Sept 2026View
HERITAGE STATEMENTReport/ Statement · PDF9 Sept 2026View
DESIGN AND ACCESS STATEMENTReport/ Statement · PDF9 Sept 2026View
EXISTING ELEVATIONPlan · PDF9 Sept 2026View
LOCATION AND EXISTING SITE PLANLocation Plan · PDF9 Sept 2026View
WATERCOURSE DIVERSION CHECKReport/ Statement · PDF9 Sept 2026View
PROPOSED SITE WATERCOURSE DIVERSIONSuperseded · PDF9 Sept 2026View
ECOLOGY SURVEYReport/ Statement · PDF9 Sept 2026View
ORDINARY WATERCOURSE LAND DRAINAGE CONSENTReport/ Statement · PDF9 Sept 2026View
ADDITIONAL ECOLOGICAL INFORMATIONReport/ Statement · PDF9 Sept 2026View
SUSTAINABILITY PLANReport/ Statement · PDF9 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Standard Consultation Date

    Published milestoneCouncil source
  3. Application Validated Date

    Published milestoneCouncil source
  4. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Determination Deadline

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.