Status on council recordCouncil status: Decided

Prior Approval of the demolition of the main Ratcliffe-on-Soar Power Station buildings and structures comprising, Control Building, Turbine Hall, Bunker Bay, Boiler House, Open Cycle Gas Turbines, SCR Plant, Electrostatic Precipitators Structure, Main Boiler Chimney, Gas Turbines Chimney, Silo Buildings, Cooling Towers, FGD Plant and associated conveyor belt systems including limestone and gypsum handling plant, Coal Stock Areaand associated conveyer belt systems and towers, including the coal handling plant, Power plant office buildings, Warehousing used to stockpile materials for Power Station operations, Ratcliffe Winking Hill Disposal Site - Depot, Water Storage Tank, Weighbridge and HGV Wheel Wash. (25/01303/DEMOL)

Uniper UK Ratcliffe On Soar Power Station Green Street Ratcliffe On Soar Nottinghamshire NG11 0EE

North West Leicestershire District CouncilReference 25/01037/NACConsultation by Neighbouring Authority

Last published check: 27 Oct 2026, 20:49. Check the council record for more recent changes.

Status and dates

Last published check: 27 Oct 2026, 20:49 (UK)

  1. DoneReceived23 Jul 2025
  2. DoneValidated23 Jul 2025
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date6 Aug 2025
  5. DecidedNo objection30 Jul 2025

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (8)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
  4. Decision Made Date

    Published milestoneCouncil source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Consultation by Neighbouring Authority
Documents
6 published

Proposal

Prior Approval of the demolition of the main Ratcliffe-on-Soar Power Station buildings and structures comprising, Control Building, Turbine Hall, Bunker Bay, Boiler House, Open Cycle Gas Turbines, SCR Plant, Electrostatic Precipitators Structure, Main Boiler Chimney, Gas Turbines Chimney, Silo Buildings, Cooling Towers, FGD Plant and associated conveyor belt systems including limestone and gypsum handling plant, Coal Stock Areaand associated conveyer belt systems and towers, including the coal handling plant, Power plant office buildings, Warehousing used to stockpile materials for Power Station operations, Ratcliffe Winking Hill Disposal Site - Depot, Water Storage Tank, Weighbridge and HGV Wheel Wash. (25/01303/DEMOL)

Reference
25/01037/NAC

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • NEW NO OBJECTION NACDecision30 Jul 2025View
  • OFFICERS REPORTReport30 Jul 2025View
  • CONSULTEE NOTIFICATIONCorrespondence23 Jul 2025View
  • APPLICATION FORMApplication Form23 Jul 2025View
  • LOCATION PLANDrawing23 Jul 2025View
  • LOCATION PLANDrawing23 Jul 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

No objection
NEW NO OBJECTION NAC
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.