Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
The Spinney Hugglescote Coalville Leicestershire LE67 2GS
Last published check: 9 Oct 2026, 10:39. Check the council record for more recent changes.
The Spinney Hugglescote Coalville Leicestershire LE67 2GS
This record has no verified map location.
View council mapT1 Ash 175-Remove deadwood / crown lift to 5meters over road and path. T2 Ash 170- Fell / remove to ground level or leave main stem at 4 meters for ecology. If felled, tree must be replaced. T3 Ash 260- Crown reduce by 30% / remove deadwood. T4 Ash 60- Crown lift to 3m over pathway. T5 Ash 70- Remove deadwood. T6 Ash 70- Remove deadwood. T7 Ash 180- Crown lift to 5 meters over roadway. T8 Ash 240-Monitor fungal growth / remove deadwood. T9 Ash 260- Remove elongated branch on West side of tree towards No.4 The Spinney. T10 Ash 320 multistem 19 Fair Remove deadwood / Reduce main stem on South side of the tree( with damage near the base) by 4-5 meters to a suitable growth point to reduce the weight. (2022/TPO/0135/LCC)
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| COUNTY DECISIONDecision | 21 Nov 2022 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.