Council planning record

Part full / part outline planning application for the development of land, including the demolition of all existing on-site buildings and structures and levelling and re-grading of the site. Full consent sought for the construction of a Distribution Campus (Use Class B8), with ancillary offices (Use Class B1a), associated gatehouse and other ancillary uses, new electricity sub-station and new pumping station, creation of new accesses from the B5493, internal roadways, cycleways and footpaths, yard space, car parking and circulation, associated lighting and security measures, surface water attenuation and landscaping. Outline consent (with all matters reserved except vehicular access from the B5493 and re-grading of site) sought for additional Use Class B1c, B2 and B8 employment, with ancillary offices (Use Class B1a) and associated commercial and amenity uses approved under planning permission ref. 19/02017/VCUM without complying with Condition nos. 1 and 8 so as to allow for provision of storage mezzanine to Unit 2

Mercia Park Burton Road Stretton En Le Field Derby

DecidedReference: 22/01232/VCIMNorth West Leicestershire District Council

Application location

Mercia Park Burton Road Stretton En Le Field Derby

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Retain Dev without complying with cond.
Received
28 Jul 2022
Validated
8 Aug 2022
Determination deadline
7 Nov 2022
Local authority
North West Leicestershire District Council

Application overview

Part full / part outline planning application for the development of land, including the demolition of all existing on-site buildings and structures and levelling and re-grading of the site. Full consent sought for the construction of a Distribution Campus (Use Class B8), with ancillary offices (Use Class B1a), associated gatehouse and other ancillary uses, new electricity sub-station and new pumping station, creation of new accesses from the B5493, internal roadways, cycleways and footpaths, yard space, car parking and circulation, associated lighting and security measures, surface water attenuation and landscaping. Outline consent (with all matters reserved except vehicular access from the B5493 and re-grading of site) sought for additional Use Class B1c, B2 and B8 employment, with ancillary offices (Use Class B1a) and associated commercial and amenity uses approved under planning permission ref. 19/02017/VCUM without complying with Condition nos. 1 and 8 so as to allow for provision of storage mezzanine to Unit 2

Proposal details

Reference
22/01232/VCIM
Alternative references
PP-11430227
Ward
Appleby
Parish
Stretton-en-le-Field
Agent
JLL

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 83 of 83

DocumentPublishedAction
CORRESPONDENCE WITH NATIONAL PLANNING CASEWORK UNITCorrespondence · PDF23 Mar 2023View
NEW PERMITTED VCIDecision · PDF17 Mar 2023View
AMENDED DRAWING SCHEDULEOther14 Mar 2023View
GLOVERPublic Comment21 Sept 2022View
GLOVERPublic Comment · PDF21 Sept 2022View
GLOVERPublic Comment21 Sept 2022View
GLOVERPublic Comment21 Sept 2022View
GLOVERPublic Comment21 Sept 2022View
GLOVERPublic Comment21 Sept 2022View
NATIONAL HIGHWAYS CONSULTATION RESPONSEConsultation Response · PDF8 Sept 2022View
GLOVERPublic Comment · PDF7 Sept 2022View
LCC HIGHWAYSConsultation Response · PDF5 Sept 2022View
DEPARTMENT FOR LEVELLING UP, HOUSING AND COMMUNITIESConsultation Response · PDF15 Aug 2022View
CORRESPONDENCE WITH NATIONAL PLANNING CASEWORK UNITCorrespondence · PDF15 Aug 2022View
FIG 6.1-6.3Report · PDF8 Aug 2022View
FIG 4.1Report · PDF8 Aug 2022View
FIG 1.2Report · PDF8 Aug 2022View
GLOSSARYReport · PDF8 Aug 2022View
VOLUME 2 CONTENTSReport · PDF8 Aug 2022View
APP 9.3_ RT-MME-122760-04 REV A (GCN)Report · PDF8 Aug 2022View
APP 9.1_ RT-MME-122760-01 REV A (PEA)Report · PDF8 Aug 2022View
APP 9.13_ RT-MME-127098-05 (LEMP)Report · PDF8 Aug 2022View
APP 9.12_ RT-MME-127098-03 (FEMS) REV AReport · PDF8 Aug 2022View
APP 8.3 DETAILED LIGHTING REPORTReport · PDF8 Aug 2022View
APP 8.1 VIEWPOINT LOCATIONSReport · PDF8 Aug 2022View
APP 7.1_ TREE SURVEY_1735-ECH-TS001Report · PDF8 Aug 2022View
APP 2.3_REVA_INFRAROUTESReport · PDF8 Aug 2022View
APP 2.2 SCOPING OPINIONReport · PDF8 Aug 2022View
APP 2.1 SCOPING REPORTReport · PDF8 Aug 2022View
APP 15.1-15.4 NOISE APPReport · PDF8 Aug 2022View
APP 13.1_ 117508_FRA_R2.2Report · PDF8 Aug 2022View
APP 11.1 DESK BASED ASSESSMENTReport · PDF8 Aug 2022View
APP 10.1 FINAL HERITAGE STATEMENTReport · PDF8 Aug 2022View
APPENDIX 2.2 CONSULTEE RESPONSESReport · PDF8 Aug 2022View
APPENDIX 2.2 CONSULTEE RESPONSESReport · PDF8 Aug 2022View
P17-3026_00_ESNTS_02082018_REVAReport · PDF8 Aug 2022View
P17-3026_18_SUMMARY_ADD_261018Report · PDF8 Aug 2022View
P17-3026_17_CLIMATE_ADD_REVB_251018Report · PDF8 Aug 2022View
P17-3026_09_ECOLOGY_ADD_REVA_251018Report · PDF8 Aug 2022View
P17-3026_00 ESNTS_ADD_31102018Report · PDF8 Aug 2022View
APP 9.14_RT-MME-129555-REV A (HRA STAGE 2 - APPROPRIATE ASSESSMENT)Report · PDF8 Aug 2022View
APP 11.2_PMSW-REPORT-V4[S]Report · PDF8 Aug 2022View
APPENDIX 13.1A AMENDED DRAINAGE LAYOUTReport · PDF8 Aug 2022View
APPENDIX 13.1A AMENDED DRAINAGE LAYOUTReport · PDF8 Aug 2022View
APPENDIX 13.1A AMENDED DRAINAGE LAYOUTReport · PDF8 Aug 2022View
APPENDIX 13.1A AMENDED DRAINAGE LAYOUTReport · PDF8 Aug 2022View
APPENDIX 13.2 WESTERN OUTFALLReport · PDF8 Aug 2022View
APPENDIX 13.3 DRAINAGE CALCULATIONSReport · PDF8 Aug 2022View
APPENDIX 13.3 DRAINAGE CALCULATIONSReport · PDF8 Aug 2022View
APPENDIX 13.3 DRAINAGE CALCULATIONSReport · PDF8 Aug 2022View
P17-3026 STATEMENT OF COMPETENCEReport · PDF8 Aug 2022View
FIG 9.1-9.3Report · PDF8 Aug 2022View
FIG 7.1-7.24Report · PDF8 Aug 2022View
FIG 16.1-16.3Report · PDF8 Aug 2022View
FIG 14.1Report · PDF8 Aug 2022View
FIG 12.1Report · PDF8 Aug 2022View
FIG 1.2Report · PDF8 Aug 2022View
ASSESSMENT SCOPE AND METHODOLOGYReport · PDF8 Aug 2022View
APP 9.11_ RT-MME-127098-02 (HRA) REV AReport · PDF8 Aug 2022View
APP 8.2 ILP LIGHTING SPECIFICATIONSReport · PDF8 Aug 2022View
P17-3026_13_FLOOD DRAINAGE_ADD_REVA_261018Report · PDF8 Aug 2022View
P17-3026_11_ARCH_ADD_REVB_261018Report · PDF8 Aug 2022View
P17-3026_00_PREAMBLE_ADD_REVB_301018Report · PDF8 Aug 2022View
P17-3026_00_CONTENTS_ADD_301018Report · PDF8 Aug 2022View
FRONT COVERReport · PDF8 Aug 2022View
APP 9.13_RT-MME-127098-05 (LEMP) REV AReport · PDF8 Aug 2022View
APP 9.12_RT-MME-127098-03 (FEMS) REV BReport · PDF8 Aug 2022View
APPENDIX A1 HERITAGE CONSULTATIONReport · PDF8 Aug 2022View
P17_3026_ES COMPLIANCESTATEMENTPHASE 3 RM_REVE_100122Report · PDF8 Aug 2022View
P17-3026_S96A_EIA NOTE_REVB_090420Report · PDF8 Aug 2022View
APPENDIX 3 - ENVIRONMENTAL STATEMENT - TECHNICAL NOTEReport8 Aug 2022View
VOLUME 1 CONTENTSReport · PDF8 Aug 2022View
APPENDIX 13.3 DRAINAGE CALCULATIONSReport · PDF8 Aug 2022View
APPENDIX 13.3 DRAINAGE CALCULATIONSReport · PDF8 Aug 2022View
APPENDIX 13.3 DRAINAGE CALCULATIONSReport · PDF8 Aug 2022View
P17_3026_ES COMPLIANCESTATEMENT_REVB_041119Report8 Aug 2022View
APPLICATION FORM - WITHOUT PERSONAL DATAApplication Form · PDF8 Aug 2022View
UNIT 2 WAREHOUSE PLANDrawing · PDF8 Aug 2022View
COVERING LETTERReport8 Aug 2022View
22/00960/NMA PLANS AND DRAWINGS ? NMA TO 19/02017/VCUMDrawing8 Aug 2022View
EIA COMPLIANCE STATEMENT S73Report · PDF8 Aug 2022View
TRANSPORT ASSESSMENTReport · PDF8 Aug 2022View
PROPOSED SITE PLANDrawing · PDF8 Aug 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Last Site Notice Posted Date

    Published milestoneCouncil source
  5. Last Advertised In Press Date

    Published milestoneCouncil source
  6. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Decision Issued Date

    Published milestoneCouncil source
  11. Decision Made Date

    Published milestoneCouncil source
  12. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  13. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Application Permitted
NEW PERMITTED VCI

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.