Council planning record

The approval of details reserved by conditions 9 (Coal), 12 (Drainage), 13 (Watercourse Crossngs), 15 (Land Contamination), 16 (Land Contamination), 17 (Land Contamination), 19 (Ecology), 25 (Structural Landscaping), 26 (Tree Protection) and 29 (Construction Vehicle Management Plan) relating to planning permission ref: 22/00526/VCUM

Money Hill Site North Of Nottingham Road And South Of A511 Ashby De La Zouch Leicestershire LE65 2UG

DecidedReference: 22/00986/DISNorth West Leicestershire District Council

Application location

Money Hill Site North Of Nottingham Road And South Of A511 Ashby De La Zouch Leicestershire LE65 2UG

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Discharge of Condition
Received
16 Jun 2022
Validated
23 Jun 2022
Determination deadline
18 Aug 2022
Local authority
North West Leicestershire District Council

Application overview

The approval of details reserved by conditions 9 (Coal), 12 (Drainage), 13 (Watercourse Crossngs), 15 (Land Contamination), 16 (Land Contamination), 17 (Land Contamination), 19 (Ecology), 25 (Structural Landscaping), 26 (Tree Protection) and 29 (Construction Vehicle Management Plan) relating to planning permission ref: 22/00526/VCUM

Proposal details

Reference
22/00986/DIS
Alternative references
PP-11330047
Ward
Ashby Money Hill
Parish
Ashby-de-la-Zouch
Agent
Chave Planning

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 114 of 114

DocumentPublishedAction
NEW PERMITTED DISDecision · PDF26 Jul 2023View
LLFA CONSULTATION RESPONSEConsultation Response · PDF21 Jul 2023View
LLFAConsultation Response · PDF5 May 2023View
LLFA CONSULTATION RESPONSEConsultation Response · PDF27 Mar 2023View
ADDITIONAL DRAINAGE AREA PLAN [PARCEL R1 215C]Drawing · PDF22 Mar 2023View
ADDITIONAL DRAINAGE AREA PLAN [PARCEL R1 216C]Drawing · PDF22 Mar 2023View
ADDITIONAL DESIGN DRAWING [PARCEL R3 - 20199 S108 SHE-0191-2190-2100-2190]Drawing · PDF22 Mar 2023View
ADDITIONAL HYDRAULIC CHARACTERISTICS [PARCEL R3 - 20199 S108 SHE-0191-2190-2100-Drawing · PDF22 Mar 2023View
ADDITIONAL HYDRAULIC CHARACTERISTICS [SHARED INFRA - 18052 S31 SHE-0224-2880-165Drawing · PDF22 Mar 2023View
ADDITIONAL FLOW CONTROL CHAMBER CONSTRUCTION DETAIL S40 [221 PARCEL R4]Drawing · PDF22 Mar 2023View
ADDITIONAL CONTROL CHAMBER [20199 322 PARCEL R3 S108]Drawing · PDF22 Mar 2023View
ADDITIONAL CONTROL CHAMBER DETAIL S31 [18052 321A]Drawing · PDF22 Mar 2023View
ADDITIONAL CONTROL CHAMBER DETAIL S59 [18052 322A]Drawing · PDF22 Mar 2023View
ADDITIONAL HEADWALL CONSTRUCTION DETAILS S30 [18052 312A]Drawing · PDF22 Mar 2023View
ADDITIONAL HEADWALL DETAILS [20199 319 R3 S194]Drawing · PDF22 Mar 2023View
ADDITIONAL DRAINAGE AREA PLAN SHEET [20199 170 R2 S104]Drawing · PDF22 Mar 2023View
ADDITIONAL DRAINAGE AREA PLAN SHEET 1 OF 3 [18052 170B]Drawing · PDF22 Mar 2023View
ADDITIONAL DESIGN DRAWING [SHARED INFRA - 18052 S31 SHE-0224-2880-1650-2880]Drawing · PDF22 Mar 2023View
ADDITIONAL DESIGN DRAWING [SHARED INFRA - 18052 S59 SHE-0172-1620-1600-1620]Drawing · PDF22 Mar 2023View
ADDITIONAL HYDRAULIC CHARACTERISTICS [SHARED INFRA - 18052 S59 SHE-0172-1620-160Drawing · PDF22 Mar 2023View
ADDITIONAL POND HEADWALL DETAILS [222 PARCEL R4]Drawing · PDF22 Mar 2023View
ADDITIONAL OUTFALL HEADWALL DETAILS [223 PARCEL R4 HW3]Drawing · PDF22 Mar 2023View
ADDITIONAL HEADWALL CONSTRUCTION DETAILS S32 [18052 313A]Drawing · PDF22 Mar 2023View
ADDITIONAL HEADWALL CONSTRUCTION DETAILS S57 [18052 314A]Drawing · PDF22 Mar 2023View
ADDITIONAL HEADWALL CONSTRUCTION DETAILS S58 [18052 315A]Drawing · PDF22 Mar 2023View
ADDITIONAL HEADWALL DETAILS [20199 313 R3 S106]Drawing · PDF22 Mar 2023View
ADDITIONAL HEADWALL DETAILS [20199 314 R3 S109]Drawing · PDF22 Mar 2023View
ADDITIONAL HEADWALL DETAILS [20199 320 R3 S196]Drawing · PDF22 Mar 2023View
ADDITIONAL SECTION 104 DRAINAGE CONSTRUCTION DETAILS [18052 325A]Drawing · PDF22 Mar 2023View
AMENDED REVISED BASIN SECTION SHEET 1 OF 2 [18052 185]Drawing · PDF22 Mar 2023View
AMENDED REVISED BASIN SECTION SHEET 2 OF 2 [18052 186]Drawing · PDF22 Mar 2023View
ADDITIONAL BASIN SECTIONS [20199 185 R5]Drawing · PDF22 Mar 2023View
ADDITIONAL BASIN SECTIONS [20199 186 R3]Drawing · PDF22 Mar 2023View
ADDITIONAL PARCEL R4 POND SECTIONS PLAN [224]Drawing · PDF22 Mar 2023View
ADDITIONAL DRAINAGE AREA PLAN [PARCEL R1 217D]Drawing · PDF22 Mar 2023View
ADDITIONAL DRAINAGE AREA PLAN SHEET [20199 172 R5 S104]Drawing · PDF22 Mar 2023View
ADDITIONAL DRAINAGE AREA PLAN SHEET [20199 171 R3 S104]Drawing · PDF22 Mar 2023View
ADDITIONAL DRAINAGE AREA PLAN SHEET 2 OF 3 [18052 171B]Drawing · PDF22 Mar 2023View
ADDITIONAL DRAINAGE AREA PLAN SHEET 3 OF 3 [18052 172B]Drawing · PDF22 Mar 2023View
ADDITIONAL DESIGN DRAWING [PARCEL R4 - S40 SHE-0151-1110-1100-1110]Drawing · PDF22 Mar 2023View
ADDITIONAL HYDRAULIC CHARACTERISTICS [PARCEL R4 - S40 SHE-0151-1110-1100-1110]Drawing · PDF22 Mar 2023View
ADDITIONAL DESIGN DRAWING [PARCEL R5 - 20199 S195 SHE-0201-2240-1525-2240]Drawing · PDF22 Mar 2023View
ADDITIONAL HYDRAULIC CHARACTERISTICS [PARCEL R5 - 20199 S195 SHE-0201-2240-1525-Drawing · PDF22 Mar 2023View
ADDITIONAL CONTROL CHAMBER [20199 321 PARCEL R5 S195]Drawing · PDF22 Mar 2023View
ADDITIONAL HEADWALL CONSTRUCTION DETAILS S29 [18052 311A]Drawing · PDF22 Mar 2023View
ADDITIONAL HEADWALL CONSTRUCTION DETAILS S60 [18052 316A]Drawing · PDF22 Mar 2023View
ADDITIONAL HEADWALL DETAILS [20199 311 R3 S107]Drawing · PDF22 Mar 2023View
ADDITIONAL HEADWALL DETAILS [20199 315 R3 S98]Drawing · PDF22 Mar 2023View
ADDITIONAL HEADWALL DETAILS [20199 317 R3 S193]Drawing · PDF22 Mar 2023View
ADDITIONAL HEADWALL DETAILS [20199 318 R3 S177]Drawing · PDF22 Mar 2023View
ADDITIONAL FLOOD COMPENSATION SECTIONS SHEET 1 OF 2 [18052 187]Drawing · PDF22 Mar 2023View
ADDITIONAL FLOOD COMPENSATION SECTIONS SHEET 2 OF 2 [18052 188]Drawing · PDF22 Mar 2023View
ADDITIONAL CULVERT DITCH CROSSING [18052 120 REV G]Drawing · PDF14 Mar 2023View
ADDITIONAL WATERCOURSE CROSSINGS LONGSECTIONS [18052 125]Drawing · PDF14 Mar 2023View
ADDITIONAL NOTTINGHAM ROAD, ASHBY LCC CONSENT CERTIFICATE OF AUTHORISATION (23/0Report · PDF14 Mar 2023View
ADDITIONAL WATERCOURSE CROSSINGS [18052 119 REV B]Drawing · PDF14 Mar 2023View
ADDITIONAL WATERCOURSE CROSSINGS CROSS SECTIONS [18052 126]Drawing · PDF14 Mar 2023View
LLFA CONSULTATION RESPONSEConsultation Response · PDF17 Feb 2023View
SUDS MAINTENANCE PLANReport · PDF2 Feb 2023View
SW NETWORK 2Report · PDF2 Feb 2023View
SW NETWORK 3Report · PDF2 Feb 2023View
SW NETWORK 4Report · PDF2 Feb 2023View
PROPOSED DRAINAGE STRATEGY SHEET 1 OF 4Drawing · PDF2 Feb 2023View
SUPERSEDED BASIN SECTIONS SHEET 1 OF 2Drawing · PDF2 Feb 2023View
SUPERSEDED BASIN SECTIONS SHEET 2 OF 2Drawing · PDF2 Feb 2023View
FLOOD COMPENSTATION SECTIONS SHEET 1 OF 2Drawing · PDF2 Feb 2023View
PROPOSED DRAINAGE STRATEGY SHEET 2 OF 4Drawing · PDF2 Feb 2023View
FLOOD COMPENSATION SECTIONS SHEET 2 OF 2Drawing · PDF2 Feb 2023View
SW NETWORK 5Report · PDF2 Feb 2023View
SW NETWORK 1Report · PDF2 Feb 2023View
PROPOSED DRAINAGE STRATEGY SHEET 3 OF 4Drawing · PDF2 Feb 2023View
PROPOSED DRAINAGE STRATEGY SHEET 4 OF 4Drawing · PDF2 Feb 2023View
LLFA CONSULTATION RESPONSEConsultation Response · PDF21 Sept 2022View
LCC HIGHWAYSConsultation Response · PDF16 Sept 2022View
ADDITIONAL WATERCOURSE CROSSINGS [18052 119]Drawing · PDF6 Sept 2022View
ADDITIONAL HEADWALL + 3 SIDED KEE KLAMP [H10CB]Drawing · PDF6 Sept 2022View
ADDITIONAL PHOTO EXAMPLE OF SOFT-ENGINEERED HEADWALLPhoto6 Sept 2022View
AMENDED CEMP [10023_16_REV B]Drawing · PDF5 Sept 2022View
AMENDED CONSTRUCTION MANAGEMENT PLAN 1 [MI120-SL-101 REV D]Drawing · PDF5 Sept 2022View
AMENDED CONSTRUCTION MANAGEMENT PLAN 1 [MI120-SL-102 REV D]Drawing · PDF5 Sept 2022View
LCC ECOLOGYConsultation Response · PDF16 Aug 2022View
.JUNE BADGER SURVEYReport · PDF1 Aug 2022View
TIMETABLE OF WORKS BADGER LICENCEReport · PDF1 Aug 2022View
COAL AUTHORITY CONSULTATION RESPONSEConsultation Response15 Jul 2022View
LCC ECOLOGY CONSULTATION RESPONSEConsultation Response · PDF15 Jul 2022View
LCC HIGHWAYS CONSULTATION RESPONSEConsultation Response · PDF15 Jul 2022View
LLFA RESPONSEConsultation Response · PDF13 Jul 2022View
NATIONAL FOREST COMPANYConsultation Response · PDF6 Jul 2022View
TREE OFFICERConsultation Response · PDF6 Jul 2022View
GEODYNE REPORT OF COMBINED PHASE I DESK STUDY & PHASE II EXPLORATORY INVESTIGATIReport · PDF23 Jun 2022View
PROPOSED DRAINAGE STRATEGY SHEET 1 OF 4 [18052 100 REV E]Drawing · PDF23 Jun 2022View
PROPOSED DRAINAGE STRATEGY SHEET 2 OF 4 [18052 101 REV L]Drawing · PDF23 Jun 2022View
SUPPLEMENTARY GROUND GAS REPORT (31ST JANUARY 2022) [D38067/SS]Report · PDF23 Jun 2022View
SUPPLEMENTARY SOIL SAMPLING WORKS (14TH DECEMBER 2021) [D38067/SS]Report · PDF23 Jun 2022View
ECOLOGY SOLUTIONS BRIEFING NOTE: DISCHARGE OF CONDITIONS 19 AND 21 OF 15/00512/OReport · PDF23 Jun 2022View
ECOLOGY SOLUTIONS BRIEFING NOTE: UPDATED BADGER SURVEYReport · PDF23 Jun 2022View
A511 PLANTING PROPOSALS SHEET 1 OF 3 [9491-L-05 REV D]Drawing · PDF23 Jun 2022View
A511 PLANTING PROPOSALS SHEET 2 OF 3 [9491-L-06 REV C]Drawing · PDF23 Jun 2022View
A511 PLANTING PROPOSALS SHEET 3 OF 3 [9491-L-07 REV C]Drawing · PDF23 Jun 2022View
SUPERSEDED CONSTRUCTION MANAGEMENT PLAN 2 [MI120-SL-0102B]Drawing · PDF23 Jun 2022View
SUPERSEDED CONSTRUCTION MANAGEMENT PLAN 1 [MI120-SL-0101B]Drawing · PDF23 Jun 2022View
CULVERT DITCH CROSSING DRAWING NO. 18052-120 REV GDrawing · PDF23 Jun 2022View
SUPERSEDED CEMP [10023_16 REV A]Drawing · PDF23 Jun 2022View
SUPPLEMENTARY OPENCAST DEEP MADE GROUND INVESTIGATION (17TH DECEMBER 2021) [D380Report · PDF23 Jun 2022View
COVERING LETTERCorrespondence · PDF23 Jun 2022View
APPLICATION FORM - WITHOUT PERSONAL DATAApplication Form · PDF23 Jun 2022View
SUPERSEDED ECOLOGY SOLUTIONS LETTER [4654/JG/001.LET.BADGER]Correspondence · PDF23 Jun 2022View
PROPOSED DRAINAGE STRATEGY SHEET 3 OF 4 [18052 102 REV L]Drawing · PDF23 Jun 2022View
PROPOSED DRAINAGE STRATEGY SHEET 4 OF 4 [18052 103 REV M]Drawing · PDF23 Jun 2022View
SITE SECTION SHEET 1 OF 4 [18052 110 REV G]Drawing · PDF23 Jun 2022View
SITE SECTION SHEET 2 OF 4 [18052 111 REV F]Drawing · PDF23 Jun 2022View
SITE SECTION SHEET 3 OF 4 [18052 112 REV F]Drawing · PDF23 Jun 2022View
SITE SECTION SHEET 4 OF 4 [18052 113 REV D]Drawing · PDF23 Jun 2022View
ARBORICULTURAL ASSESSMENT (JUNE 2022) REVISION DReport · PDF23 Jun 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Standard Consultation Date

    Published milestoneCouncil source
  5. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Issued Date

    Published milestoneCouncil source
  7. Decision Made Date

    Published milestoneCouncil source
  8. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Application Permitted
NEW PERMITTED DIS

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.