(a) Improvements to above and below ground surface water penetration by the installation cavity drain membrane system. (b) (a) Improvements to above and below ground surface water penetration by the installation cavity drain membrane system. (b) Replacement of the internally applied cementitious render with a system to the internal walls (c) Replacement of the defective external cementitious render to the exterior plinth, either by using a lime render or repointing the brickwork (d) Replacement of existing plastic rainwater goods to the rear south elevation
(a) Improvements to above and below ground surface water penetration by the installation cavity drain membrane system. (b) (a) Improvements to above and below ground surface water penetration by the installation cavity drain membrane system. (b) Replacement of the internally applied cementitious render with a system to the internal walls (c) Replacement of the defective external cementitious render to the exterior plinth, either by using a lime render or repointing the brickwork (d) Replacement of existing plastic rainwater goods to the rear south elevation
Reference
24/01381/LBC
Alternative references
PP-13483302
Ward
Tynemouth
Parish
North Shields
Agent
RNJ Partnership LLP
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.