Variation of Condition 1 (approved details) of 22/01053/FUL / 23/01635/FUL and conditions 14 (surfacing materials) and no.28 (landscaping scheme) of 23/01635/FUL) in order to make the following revisions: Substitution of section of metal mesh fence with acoustic timber fence, in order to reduce the impact of the noise from the MUGA pitch on the neighbouring dwellings facing St. Peter's Road, change to the surfacing materials of the footpath around the northern part of building and a revision the approved landscape scheme to include increased scrub planting, a greater proportion of native evergreen plants within the planting to the east of the proposed acoustic fence and the development of mounds up to 1.5m in height.
Football Pitches West Of St Peters Road Wallsend Tyne And Wear
Variation of Condition 1 (approved details) of 22/01053/FUL / 23/01635/FUL and conditions 14 (surfacing materials) and no.28 (landscaping scheme) of 23/01635/FUL) in order to make the following revisions: Substitution of section of metal mesh fence with acoustic timber fence, in order to reduce the impact of the noise from the MUGA pitch on the neighbouring dwellings facing St. Peter's Road, change to the surfacing materials of the footpath around the northern part of building and a revision the approved landscape scheme to include increased scrub planting, a greater proportion of native evergreen plants within the planting to the east of the proposed acoustic fence and the development of mounds up to 1.5m in height.
Reference
24/01030/FUL
Alternative references
PP-13331709
Ward
Wallsend Central
Parish
Wallsend
Agent
North Tyneside Council
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.