Council planning record

Oak (T84): Removal of 1no south facing forked branch at 4.0m above ground level back to main scaffold limb that is 7.0m above ground level. Crown raise by removing vertical hanging branches to a height of 4.0m above ground level from south and south east canopy of the tree. Great Lime Road, Gosforth TPO 1973 (description amended 10.06.2022)

7 The Chase West Moor NEWCASTLE UPON TYNE NE12 7EW

DecidedReference: 22/00815/TPONorth Tyneside Council

Application location

7 The Chase West Moor NEWCASTLE UPON TYNE NE12 7EW

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
tree preservation order tree works
Received
16 May 2022
Validated
16 May 2022
Determination deadline
11 Jul 2022
Local authority
North Tyneside Council

Application overview

Oak (T84): Removal of 1no south facing forked branch at 4.0m above ground level back to main scaffold limb that is 7.0m above ground level. Crown raise by removing vertical hanging branches to a height of 4.0m above ground level from south and south east canopy of the tree. Great Lime Road, Gosforth TPO 1973 (description amended 10.06.2022)

Proposal details

Reference
22/00815/TPO
Alternative references
Paper
Ward
Longbenton
Parish
North West

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 3 of 3

DocumentPublishedAction
CONSENT NOTICEDecision · PDF13 Jul 2022View
Officer Recommendation ReportOfficer Recommendation Report · PDF7 Jul 2022View
TREE PRESERVATION ORDEROther · PDF17 May 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Made Date

    Published milestoneCouncil source
  6. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Decision Issued Date

    Published milestoneCouncil source
  8. Permission Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Application Permitted
CONSENT NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.