Council planning record

T1: Large Ash - Reduction by a maximum of 3m of x2 branches growing in an eastern direction 5m above ground level; Reduction by a maximum of 3m of one branch growing in a western direction 4m above ground level; Reduction by amaximum of 3m of one branch growing in a south western direction 3m above ground level. Crown thin of 10%. Removal of deadwood with a crown clean. Arang, Seaton burn, Tree Preservation Order, 1995 (description amended 26.07.2022)

Brookside East Blagdon Terrace Seaton Burn NEWCASTLE UPON TYNE NE13 6EY

DecidedReference: 22/00796/TPONorth Tyneside Council

Application location

Brookside East Blagdon Terrace Seaton Burn NEWCASTLE UPON TYNE NE13 6EY

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
tree preservation order tree works
Received
16 May 2022
Validated
16 May 2022
Determination deadline
11 Jul 2022
Local authority
North Tyneside Council

Application overview

T1: Large Ash - Reduction by a maximum of 3m of x2 branches growing in an eastern direction 5m above ground level; Reduction by a maximum of 3m of one branch growing in a western direction 4m above ground level; Reduction by amaximum of 3m of one branch growing in a south western direction 3m above ground level. Crown thin of 10%. Removal of deadwood with a crown clean. Arang, Seaton burn, Tree Preservation Order, 1995 (description amended 26.07.2022)

Proposal details

Reference
22/00796/TPO
Alternative references
PP-11259552
Ward
Weetslade
Parish
North West
Agent
Wholetree

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 5 of 5

DocumentPublishedAction
DecisionDecision · PDF4 Aug 2022View
Officer Recommendation ReportOfficer Recommendation Report · PDF2 Aug 2022View
TPOBackGround Papers · PDF2 Aug 2022View
SITE PLANDrawing15 May 2022View
PHOTOOther15 May 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Made Date

    Published milestoneCouncil source
  7. Decision Issued Date

    Published milestoneCouncil source
  8. Permission Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Application Permitted
Decision
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.