Council planning record

Formal submission to discharge Requirement 5(2)(b) (Biodiversity Mitigation Strategy Addendum for Stage 10.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).

Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.

DecidedReference: 24/P/2360/DCMNorth Somerset Council

Last published check: 3 Oct 2026, 12:06. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Issued Date

    Published milestoneCouncil source
  5. Decision Made Date

    Published milestoneCouncil source
  6. Extended Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided
Application type
Development Consent Order - Major
Received
6 Nov 2024
Validated
19 Nov 2024
Determination deadline
14 Jan 2025
Local authority
North Somerset Council

Application overview

Formal submission to discharge Requirement 5(2)(b) (Biodiversity Mitigation Strategy Addendum for Stage 10.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).

Proposal details

Reference
24/P/2360/DCM
Parish
Unparished
Agent
ARUP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.

This record has no verified map location.

View council map

Documents 30 of 30

DocumentPublishedAction
DECISION (DCM) APPROVEDecision Notice · PDF16 Apr 2025View
NORTH SOMERSET OFFICER REPORTDelegated Report · PDF16 Apr 2025View
DELEGATED REPORT DCO/DMODelegated Report · PDF15 Apr 2025View
HPCC - 10.1 5B 1 - REQ 5 2 B - BMS ADDENDUM REV EReport · PDF19 Nov 2024View
APPENDIX I - GREAT CRESTED NEWT LICENCE MODIFICATION (132 KV DISMANTLING)Report · PDF19 Nov 2024View
HPCC - SW 4 G - REQ 4 - APP B - COMBINED PLAN OF STAGES - SHEET 1 OF 11Report · PDF19 Nov 2024View
HPCC - SW 4 G - REQ 4 - APP B - COMBINED PLAN OF STAGES - SHEET 2 OF 11Report · PDF19 Nov 2024View
HPCC - SW 4 G - REQ 4 - APP B - COMBINED PLAN OF STAGES - SHEET 3 OF 11Report · PDF19 Nov 2024View
HPCC - SW 4 G - REQ 4 - APP B - COMBINED PLAN OF STAGES - SHEET 4 OF 11Report · PDF19 Nov 2024View
HPCC - SW 4 G - REQ 4 - APP B - COMBINED PLAN OF STAGES - SHEET 5 OF 11Report · PDF19 Nov 2024View
APPENDIX I- MODIFICATION TO LICENCE REV A 22-11-17Report · PDF19 Nov 2024View
APPENDIX I- MODIFICATION TO LICENCE REV A 22-11-17Report · PDF19 Nov 2024View
APPLICATIONFORMREDACTEDApplication Form · PDF6 Nov 2024View
APPENDIX A WATER VOLE LICENSE - SURVEY RESULTSReport · PDF6 Nov 2024View
APPENDIX A WATER VOLE LICENCE - LOCATION MAPReport · PDF6 Nov 2024View
APPENDIX A WATER VOLE LICENCE - IMPACTSReport · PDF6 Nov 2024View
APPENDIX A WATER VOLE MITIGATION STRATEGYReport · PDF6 Nov 2024View
APPENDIX C - GREAT CRESTED NEWT SURVEY REPORTReport · PDF6 Nov 2024View
APPENDIX B DORMOUSE MITIGATION STRATEGYReport · PDF6 Nov 2024View
APPENDIX E - BAT MITIGATION STRATEGYReport · PDF6 Nov 2024View
APPENDIX E - BAT SURVEY RESULTSReport · PDF6 Nov 2024View
APPENDIX E - BAT LICENCE - D IMPACTS PLANReport · PDF6 Nov 2024View
APPENDIX E - BAT LICENCE - C6B SURVEY RESULTSReport · PDF6 Nov 2024View
APPENDIX E - BAT LICENCE - C6A SURVEY RESULTS CONFIRMED ROOSTSReport · PDF6 Nov 2024View
APPENDIX E - BAT LICENCE - C5A LOCATION MAPReport · PDF6 Nov 2024View
APPENDIX H MITIGATION STRATEGY (132KV DISMANTLING)Report · PDF6 Nov 2024View
APPENDIX G WATER VOLE AND OTTER SURVEY (132KV DISMANTLING)Report · PDF6 Nov 2024View
APPENDIX M - CROOKS MARSH DELAYED START AREAReport · PDF6 Nov 2024View
APPENDIX K BAT SURVEY REPORT (132KV DISMANTLING)Report · PDF6 Nov 2024View
APPENDIX J BADGER SURVEY REPORT 2022 (132KV DISMANTLING)Report · PDF6 Nov 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approve
DECISION (DCM) APPROVE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.