Council planning record

Request to discharge condition numbers 7 (Phasing), 10 (Construction Management), 14 (Construction Water Run Off), 15 (Foul Water Drainage), 22 (Landscaping), 24 (Landscape management plan), 25 (Tree Protection design), 28 (Biodiversity), 29 (Dark Vegetated Corridor Scheme), 30 (External Lighting), 31 (Biodiveristy and Nature Conservation Management Plan), 34 (Fencing), 37 (Nature and Contamination Assessment), 46 (Street Lighting), 48 (Finished Levels), 49 (Material Samples), 50 (Surface Materials Samples), 54 (Boundary Enclosures) and 57 (Waste Control )on application 12/P/1266/OT2

Phase 4A Parklands Weston-super-Mare

DecidedReference: 24/P/0561/AOCNorth Somerset Council

Last published check: 8 Oct 2026, 11:30. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Extended Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source

Application summary

Status
Decided
Application type
Approval of Condition
Received
15 Mar 2024
Validated
15 Mar 2024
Determination deadline
10 May 2024
Local authority
North Somerset Council

Application overview

Request to discharge condition numbers 7 (Phasing), 10 (Construction Management), 14 (Construction Water Run Off), 15 (Foul Water Drainage), 22 (Landscaping), 24 (Landscape management plan), 25 (Tree Protection design), 28 (Biodiversity), 29 (Dark Vegetated Corridor Scheme), 30 (External Lighting), 31 (Biodiveristy and Nature Conservation Management Plan), 34 (Fencing), 37 (Nature and Contamination Assessment), 46 (Street Lighting), 48 (Finished Levels), 49 (Material Samples), 50 (Surface Materials Samples), 54 (Boundary Enclosures) and 57 (Waste Control )on application 12/P/1266/OT2

Proposal details

Reference
24/P/0561/AOC
Ward
Banwell And Winscombe
Parish
Banwell
Agent
Wain Homes (Severn Valley)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Phase 4A Parklands Weston-super-Mare

This record has no verified map location.

View council map

Documents 29 of 29

DocumentPublishedAction
DECISION (AOC) APPROVEDischarge of Conditions · PDF19 Jun 2024View
CONSTRUCTION MANAGEMENT PLAN VERSION 2Amended Plan · PDF11 Jun 2024View
COMMENT ON CONDITION 7Consultation Reply10 Jun 2024View
SITE EXECUTION PLAN VERSION 5Amended Plan · PDF6 Jun 2024View
LANDSCAPE PROPOSALSAmended Plan · PDF22 May 2024View
LANDSCAPE MANAGEMENT PLAN PHASE 4 - REVISEDApplication Support Info · PDF22 May 2024View
FLOOD RISK MANAGEMENT TEAM COMMENTConsultation Reply · PDF10 May 2024View
ENIVRONMENT AGENCY COMMENTSConsultation Reply · PDF8 May 2024View
INTERNAL DRAINAGE BOARD COMMENTSConsultation Reply · PDF3 May 2024View
COVER LETTERApplication Letter · PDF11 Apr 2024View
CONSTRUCTION ECOLOGICAL MANAGEMENT PLANApplication Support Info · PDF11 Apr 2024View
CONSTRUCTION MANAGEMENT PLANApplication Support Info · PDF11 Apr 2024View
DRAINAGE STRATEGY FOR PLANNINGPlan · PDF11 Apr 2024View
PLOT AREAS IMPERMEABLE AREAS - REV Q 2023-06-23Application Support Info · PDF11 Apr 2024View
FLOOD EXCEEDANCE ROUTINGPlan · PDF11 Apr 2024View
ENGINEERING TECHNICAL NOTE JUNE 2023Application Support Info · PDF11 Apr 2024View
CATCHMENT PLANPlan · PDF11 Apr 2024View
IMPERMEABLE AREASPlan · PDF11 Apr 2024View
LANDSCAPE PROPOSALSPlan · PDF11 Apr 2024View
ECOLOGICAL VERIFICATION REPORTApplication Support Info · PDF11 Apr 2024View
HIGHWAYS STREET LIGHTING DESIGN REV 1Plan · PDF11 Apr 2024View
BIODIVERSITY AND NATURE CONSERVATION MANAGEMENT PLANApplication Support Info · PDF11 Apr 2024View
INTERPRETIVE GROUND INVESTIGATION REPORTApplication Support Info · PDF11 Apr 2024View
EXISTING AND PROPOSED LEVELS PLANNINGPlan · PDF11 Apr 2024View
MATERIALS PLANPlan · PDF11 Apr 2024View
EXTERNAL WORKS PLANPlan · PDF11 Apr 2024View
ENCLOSURE PLANPlan · PDF11 Apr 2024View
REFUSE STRATEGY PLANPlan · PDF11 Apr 2024View
APPLICATIONFORMREDACTEDApplication Form · PDF15 Mar 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approve (discharge condition)(RDC)
DECISION (AOC) APPROVE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.