Formal submission to discharge Requirement 5(2)(b) (Biodiversity Mitigation Strategy Addendum for Stage 9 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).

Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.

DecidedReference: 22/P/2358/DCMNorth Somerset Council

Last published check: 22 Sept 2026, 05:59. Check the council record for more recent changes.

Application location

Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Development Consent Order - Major
Received
29 Sept 2022
Validated
29 Sept 2022
Determination deadline
24 Nov 2022
Local authority
North Somerset Council

Application overview

Formal submission to discharge Requirement 5(2)(b) (Biodiversity Mitigation Strategy Addendum for Stage 9 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).

Proposal details

Reference
22/P/2358/DCM
Parish
Unparished
Agent
Arup

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 13 of 13

DocumentPublishedAction
DECISION (DCM) APPROVEDecision Notice · PDF24 Nov 2022View
NORTH SOMERSET OFFICER REPORTDelegated Report · PDF24 Nov 2022View
DELEGATED REPORT DCO/DMODelegated Report · PDF22 Nov 2022View
APPLICATIONFORMREDACTEDApplication Form · PDF29 Sept 2022View
HCP_9 5_B D - BIODIVERSITY MITIGATION STRATEGY ADDENDUMReport · PDF29 Sept 2022View
APPENDIX A TEP 2018 GREAT CRESTED NEWT REPORTReport · PDF29 Sept 2022View
APPENDIX B TEP 2018 WV OTTER REPORTReport · PDF29 Sept 2022View
APPENDIX C STAGE 4 2019 WV OTTER REPORTReport · PDF29 Sept 2022View
APPENDIX D TEP WATER VOLE METHOD STATEMENTReport · PDF29 Sept 2022View
APPENDIX E STAGE 9 2020 WATER VOLE SURVEY RESULTS AND MITIGATION STRATEGYReport · PDF29 Sept 2022View
APPENDIX F STAGE 4 FIG 8 INVASIVE SPECIES MAPReport · PDF29 Sept 2022View
APPENDIX G EXTRACT FROM GCN LICENCEReport · PDF29 Sept 2022View
APPENDIX H LETTER TO NE AUG 22Report · PDF29 Sept 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
  4. Decision Made Date

    Published milestoneCouncil source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve
DECISION (DCM) APPROVE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.