Council planning record

Proposed Alterations to Property roofing including, Raising of ridge height, creation of 1 No. Gable, 1 No. Large Dormer with 4 No. Skylights and internal alterations.

18 Rayens Cross Road Long Ashton BS41 9DZ

DecidedReference: 22/P/2320/FUHNorth Somerset Council

Last published check: 22 Sept 2026, 06:49. Check the council record for more recent changes.

Application location

18 Rayens Cross Road Long Ashton BS41 9DZ

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Full permission - Householders
Received
26 Sept 2022
Validated
26 Sept 2022
Determination deadline
21 Nov 2022
Local authority
North Somerset Council

Application overview

Proposed Alterations to Property roofing including, Raising of ridge height, creation of 1 No. Gable, 1 No. Large Dormer with 4 No. Skylights and internal alterations.

Proposal details

Reference
22/P/2320/FUH
Ward
Long Ashton
Parish
Long Ashton
Agent
Clifton Design (Bristol) Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 22 of 22

DocumentPublishedAction
DECISION (FUH) APPROVEDecision Notice · PDF16 Dec 2022View
NORTH SOMERSET OFFICER REPORTDelegated Report · PDF16 Dec 2022View
18 RAYENS CROSS ROADSite Notice17 Nov 2022View
APPLICATIONFORMREDACTEDApplication Form · PDF26 Sept 2022View
SITE LOCATION PLANOS Extract · PDF26 Sept 2022View
EXISTING FF PLANPlan · PDF26 Sept 2022View
PROPOSED FF PLANPlan · PDF26 Sept 2022View
EXISTING LOFT PLANPlan · PDF26 Sept 2022View
PROPOSED LOFT PLANPlan · PDF26 Sept 2022View
EXISTING ROOF PLANPlan · PDF26 Sept 2022View
PROPOSED ROOF PLANPlan · PDF26 Sept 2022View
EXISTING SECTIONSPlan · PDF26 Sept 2022View
PROPOSED SECTIONSPlan · PDF26 Sept 2022View
PROPOSED SECTIONSPlan · PDF26 Sept 2022View
EXISTING FRONT ELEVATIONPlan · PDF26 Sept 2022View
PROPOSED FRONT ELEVATIONPlan · PDF26 Sept 2022View
EXISTING REAR ELEVATIONPlan · PDF26 Sept 2022View
PROPOSED REAR ELEVATIONPlan · PDF26 Sept 2022View
EXISTING SIDE ELEVATIONPlan · PDF26 Sept 2022View
PROPOSED SIDE ELEVATIONPlan · PDF26 Sept 2022View
EXISTING BLOCK PLANPlan · PDF26 Sept 2022View
PROPOSED BLOCK PLANPlan · PDF26 Sept 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Consultation Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Made Date

    Published milestoneCouncil source
  6. Decision Issued Date

    Published milestoneCouncil source
  7. Extended Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve
DECISION (FUH) APPROVE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.