Council planning record

Listed building consent for the construction of a first floor dormer to the existing 1970s wing; new rooflights; erection of a ground floor timber canopy; erection of a first floor balcony with garden access; installation of new windows; replacement of modern single glazing new slimline double glazed units; lowering of cills to some existing windows and infilling with double glazed metal framed windows; new oak panelled front door with timber lintel; associated internal and external alterations

3 Church Lane Long Ashton BS41 9LU

DecidedReference: 22/P/2225/LBCNorth Somerset Council

Last published check: 22 Sept 2026, 05:01. Check the council record for more recent changes.

Application location

3 Church Lane Long Ashton BS41 9LU

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Listed Building Consent
Received
14 Sept 2022
Validated
5 Oct 2022
Determination deadline
30 Nov 2022
Local authority
North Somerset Council

Application overview

Listed building consent for the construction of a first floor dormer to the existing 1970s wing; new rooflights; erection of a ground floor timber canopy; erection of a first floor balcony with garden access; installation of new windows; replacement of modern single glazing new slimline double glazed units; lowering of cills to some existing windows and infilling with double glazed metal framed windows; new oak panelled front door with timber lintel; associated internal and external alterations

Proposal details

Reference
22/P/2225/LBC
Ward
Long Ashton
Parish
Long Ashton
Agent
Tonic Architecture Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 33 of 33

DocumentPublishedAction
DECISION (LBC) APPROVEDecision Notice · PDF5 Dec 2022View
NORTH SOMERSET OFFICER REPORTDelegated Report · PDF5 Dec 2022View
AMENDED PROPOSED ELEVATIONS (NORTH)Amended Plan · PDF1 Dec 2022View
HISTORIC ENGLAND ADVICE 21.10Consultation Reply22 Oct 2022View
26.10.22 NORTH SOMERSET TIMESPress Advert22 Oct 2022View
DRAINAGE LAYOUTPlan · PDF18 Oct 2022View
SUPERSEDED PROPOSED ELEVATIONS (NORTH)Superseded plans · PDF5 Oct 2022View
PROPOSED ELEVATIONS (WEST)Plan · PDF5 Oct 2022View
PROPOSED ELEVATIONS (SOUTH)Plan · PDF5 Oct 2022View
EXISTING GROUND FLOOR PLANPlan · PDF5 Oct 2022View
EXISTING FIRST FLOOR PLANPlan · PDF5 Oct 2022View
EXISTING ROOF PLANPlan · PDF5 Oct 2022View
EXISTING ELEVATIONS (NORTH)Plan · PDF5 Oct 2022View
EXISTING ELEVATIONS (WEST)Plan · PDF5 Oct 2022View
EXISTING ELEVATIONS (SOUTH)Plan · PDF5 Oct 2022View
PROPOSED FIRST FLOOR DRAINAGE PLANPlan · PDF5 Oct 2022View
PROPOSED GROUND FLOOR SMALL POWER LAYOUTPlan · PDF5 Oct 2022View
PROPOSED FIRST FLOOR SMALL POWER PLANPlan · PDF5 Oct 2022View
PROPOSED WINDOW DETAILSPlan · PDF5 Oct 2022View
WINDOW REPLACEMENT DETAILSPlan · PDF5 Oct 2022View
APPLICATIONFORMREDACTEDApplication Form · PDF14 Sept 2022View
BAT & BIRD ASSESSMENTEcological report · PDF14 Sept 2022View
DESIGN AND ACCESS STATEMENTDesign and access statement · PDF14 Sept 2022View
HERITAGE STATEMENTHeritage statement · PDF14 Sept 2022View
COVERING LETTER FROM AGENTLetter from Agent · PDF14 Sept 2022View
EXISTING SITE PLANPlan · PDF14 Sept 2022View
PROPOSED SITE PLANPlan · PDF14 Sept 2022View
PROPOSED GROUND FLOOR PLANPlan · PDF14 Sept 2022View
PROPOSED FIRST FLOOR PLANPlan · PDF14 Sept 2022View
PROPOSED ROOF PLANPlan · PDF14 Sept 2022View
SITE LOCATION PLANOS Extract · PDF14 Sept 2022View
CIL FORM 1- ADDITIONAL INFORMATIONCIL Notices · PDF14 Sept 2022View
ARBORICULTURAL REPORTArboricultural statement · PDF14 Sept 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Consultation Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Made Date

    Published milestoneCouncil source
  6. Decision Issued Date

    Published milestoneCouncil source
  7. Extended Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve
DECISION (LBC) APPROVE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.