Council planning record

Formal Submission to discharge of Requirement 20 (Removal of temporary bridges and culverts for Stage 2.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016

Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth

DecidedReference: 22/P/2194/DCONorth Somerset Council

Last published check: 28 Sept 2026, 13:14. Check the council record for more recent changes.

Application location

Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Development Consent Order - Minor
Received
9 Sept 2022
Validated
9 Sept 2022
Determination deadline
14 Oct 2022
Local authority
North Somerset Council

Application overview

Formal Submission to discharge of Requirement 20 (Removal of temporary bridges and culverts for Stage 2.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016

Proposal details

Reference
22/P/2194/DCO
Parish
Unparished
Agent
ARUP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 17 of 17

DocumentPublishedAction
DECISION (DCO) APPROVEDecision Notice · PDF15 Mar 2023View
DELEGATED REPORTDelegated Report15 Mar 2023View
DELEGATED REPORT DCO/DMODelegated Report · PDF14 Mar 2023View
HCP 2.1 20 C - WATERCOURSE PROTECTION PLANReport · PDF20 Feb 2023View
HCP 2.1 20 C - APPENDIX A - LAND DRAINAGE CONSENT REGISTERReport · PDF20 Feb 2023View
HCP 2.1 20 C - APPENDIX B (1 OF 2)- CROSSING REINSTATEMENT WPP FINALReport · PDF20 Feb 2023View
HCP 2.1 20 C - APPENDIX B (2 OF 2)- CROSSING REINSTATEMENT RAMSReport · PDF20 Feb 2023View
HCP 2.1 20 C - APPENDIX C - WATERCOURSE CROSSING LOCATIONSReport · PDF20 Feb 2023View
HCP 2.1 20 C - APPENDIX D - REINSTATEMENT STANDARD DETAILSReport · PDF20 Feb 2023View
APPLICATIONFORMREDACTEDApplication Form · PDF9 Sept 2022View
APPENDIX A - LAND DRAINAGE CONSENT REGISTERReport · PDF9 Sept 2022View
APPENDIX B (1 OF 2)- CROSSING REINSTATEMENT WPPReport · PDF9 Sept 2022View
APPENDIX B (2 OF 2)- CROSSING REINSTATEMENT RAMSReport · PDF9 Sept 2022View
APPENDIX C - WATERCOURSE CROSSING LOCATIONSReport · PDF9 Sept 2022View
APPENDIX D - REINSTATEMENT STANDARD DETAILSReport · PDF9 Sept 2022View
HCP 2.1 20 A - WATERCOURSE PROTECTION PLANReport · PDF9 Sept 2022View
HCP - 2.1 20 A - COVER LETTER NSCLetter from Applicant · PDF9 Sept 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Issued Date

    Published milestoneCouncil source
  5. Decision Made Date

    Published milestoneCouncil source
  6. Extended Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve
DECISION (DCO) APPROVE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.