Council planning record

Construction of a 3.3km single carriageway road from the A371 Summer Lane to A368 Towerhead Road, including a 3m shared use path to Sandford, one bridge, ten culverts, associated infrastructure, and landscaping. Construction of a 0.63km (including junction link to Banwell Bypass) single carriageway Southern Link Road, including associated infrastructure and landscaping. Mitigation and enhancement measures, which consist of environmental mitigation and enhancement measures in connection with the Banwell Bypass and the Southern Link including flood compensation areas, planting and habitat creation, attenuation basins, replacement playing fields at Banwell Football Club, associated infrastructure and landscaping. Placemaking improvements within Banwell, comprising mitigation and enhancement measures to the public realm. Demolition of a wall at 25 Castle Hill. Active travel routes including works to footpaths, cycleways, and bridleways. Improvements to the wider local road network in Sandford, Churchill, Winscombe and Locking and creation of shared use paths between Sandford and Churchill and Langford and Churchill

Banwell Bypass Land To North And East Of Banwell Including Mitigation Highway Land In Sandford, Winscombe And Churchill

DecidedReference: 22/P/1768/R3EIANorth Somerset Council

Last published check: 29 Sept 2026, 22:02. Check the council record for more recent changes.

Application location

Banwell Bypass Land To North And East Of Banwell Including Mitigation Highway Land In Sandford, Winscombe And Churchill

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Council planapp+EIA(R3)(NSC developer)
Received
18 Jul 2022
Validated
25 Jul 2022
Determination deadline
14 Nov 2022
Local authority
North Somerset Council

Application overview

Construction of a 3.3km single carriageway road from the A371 Summer Lane to A368 Towerhead Road, including a 3m shared use path to Sandford, one bridge, ten culverts, associated infrastructure, and landscaping. Construction of a 0.63km (including junction link to Banwell Bypass) single carriageway Southern Link Road, including associated infrastructure and landscaping. Mitigation and enhancement measures, which consist of environmental mitigation and enhancement measures in connection with the Banwell Bypass and the Southern Link including flood compensation areas, planting and habitat creation, attenuation basins, replacement playing fields at Banwell Football Club, associated infrastructure and landscaping. Placemaking improvements within Banwell, comprising mitigation and enhancement measures to the public realm. Demolition of a wall at 25 Castle Hill. Active travel routes including works to footpaths, cycleways, and bridleways. Improvements to the wider local road network in Sandford, Churchill, Winscombe and Locking and creation of shared use paths between Sandford and Churchill and Langford and Churchill

Proposal details

Reference
22/P/1768/R3EIA
Ward
Banwell And Winscombe
Parish
Winscombe And Sandford
Agent
ARUP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 399 of 399

DocumentPublishedAction
DECISION LETTER AOC 7(B), 7(F) AND 29 (PHASE 2B RIVERSIDE BRIDGE AND PHASE 2DDischarge of Conditions · PDF21 Jan 2026View
APPROVAL OF CONDITIONS 7(K), 9, 10, 11, 13 AND 33Discharge of Conditions · PDF8 Apr 2025View
APP. CONDITIONS 7(A), 7(C), 7(G), 7(H), 7(M), 7(N), 19, 27(B), 27(D), 28(B), 30Discharge of Conditions · PDF8 Apr 2025View
APPROVAL OF CONDITIONS 3, 4, 5, 6, 14H-I, 15, 26, 31Discharge of Conditions · PDF21 Feb 2025View
NATIONAL HIGHWAYS PLANNING RESPONSE - FORMAL RECOMMENDATIONConsultation Reply · PDF27 Apr 2023View
NATIONAL HIGHWAYSConsultation Reply21 Apr 2023View
NORTH SOMERSET OFFICER REPORTDelegated Report · PDF16 Mar 2023View
DECISION NOTICEDecision Notice · PDF16 Mar 2023View
10.03.23 - ROMAN VILLA_HIA_TECHNICAL NOTE _ISSUEConsultation Reply · PDF15 Mar 2023View
14.03.23 - SPORTS ENGLAND OBJECTION RESPONSE.Objection Comment · PDF15 Mar 2023View
13.03.23 - HISTORIC ENGLAND COMMENTSConsultation Reply14 Mar 2023View
P&R COMMITTEE UPDATE 15 MARCH 2023Committee Update · PDF14 Mar 2023View
CROSS SECTION A371 M5 OVERBRIDGEPlan · PDF11 Mar 2023View
HABITATS REGULATIONS ASSESSMENT - ECOLOGY RESPONSEConsultation Reply10 Mar 2023View
REPORT TO PLANNING AND REGULATORY COMMITTEE 15 MARCH 2023Committee Report · PDF8 Mar 2023View
06.03.23 - ARUP RESPONSE COMMENTS.Correspondence · PDF8 Mar 2023View
NOTIFICATION OF APPLICATION GOING TO PLANNING AND REGULATORY COMMITTEE 15 MARCHA notice of committee · PDF7 Mar 2023View
HRA FEBRUARY 2023 UPDATE F1Consultation Reply7 Mar 2023View
ARUP - PUBLIC COMMENTS OBJECTION RESPONSEConsultation Reply · PDF24 Feb 2023View
NATIONAL HIGHWAYS FORMAL RECOMMENDATIONConsultation Reply · PDF23 Feb 2023View
NATIONAL HIGHWAYS OBJECTION RESPONSE 1Consultation Reply · PDF23 Feb 2023View
NATIONAL HIGHWAYS OBJECTION RESPONSE 2Consultation Reply · PDF23 Feb 2023View
10.02.23 - LETTER OF REPRESENTATION - BANWELL BYPASS.Correspondence · PDF22 Feb 2023View
07.02.23 ARUP BYPASS AND HIGHWAYS IMPROVEMENTS LETTERConsultation Reply · PDF10 Feb 2023View
07.02.23 - ARUP RESPONSE TOBANWELL BYPASS AND HIGHWAY IMPROVEMENTS.Correspondence · PDF8 Feb 2023View
EQUIVALENT QUALITY - SPORT ENGLAND RESPONSEConsultation Reply · PDF6 Feb 2023View
01.02.23 NATIONAL HIGHWAYS RESPONSEConsultation Reply2 Feb 2023View
01.02.23 NATURAL ENGLAND RESPONSEConsultation Reply · PDF2 Feb 2023View
01.02.23 MR RICHMOND OBJECTION RESPONSEConsultation Reply · PDF2 Feb 2023View
PALAEOENVIRONMENTAL ASSESSMENT REPORTConsultation Reply · PDF1 Feb 2023View
GRAZING TECHNICAL NOTE COMBINED.Application Support Info · PDF31 Jan 2023View
26.01.23 - ENVIRONMENT AGENCY RESPONSE.Consultation Reply · PDF31 Jan 2023View
09.12.22 - ENVIRONMENT AGENCY RESPONSE.Consultation Reply · PDF31 Jan 2023View
RESPONSE FROM CHURCHILL AND LANGFORD PARISH COUNCILTown/Parish Council Comment31 Jan 2023View
21.01.23 - STATEMENT OF COMMON GROUND AGREED.Town/Parish Council Comment · PDF31 Jan 2023View
27.01.23 - ARUP RESPONSEConsultee Comment · PDF31 Jan 2023View
27.01.23 -SAVILLS RESPONSELetter from Agent · PDF31 Jan 2023View
RESPONSE TO ARUP LETTER OF 13 DEC 2022Correspondence31 Jan 2023View
COMMENTS ON AMENDED BYPASS APPLICATION.Correspondence31 Jan 2023View
21.01.23 COMMENTS AND STATEMENT CHURCHILL AND WINSCOMBE AND SANDFORD PARISH COUNConsultation Reply · PDF27 Jan 2023View
26.01.23 ENVIRONMENT AGENCY RESPONSEConsultation Reply27 Jan 2023View
23.01.23 - CULTURAL HERITAGE - MITIGATION STRATEGYReport · PDF26 Jan 2023View
23.01.23 - HIGHWAYS IMPROVEMENTS PROJECT.Report · PDF26 Jan 2023View
23.01.23 - HIF BANWELL BYPASS & HIGHWAYS IMPROVEMENTS PROJECT.Report · PDF26 Jan 2023View
24.11.22 - ES CHAPTER 6 ADDENDUM 4 - PROPOSED DEMOLITIONReport · PDF26 Jan 2023View
24.01.23 - LETTER ARUP - BANWELL BYPASS AND HIGHWAY IMPROVEMENTS.Correspondence · PDF26 Jan 2023View
22-01-23 - HISTORIC ENGLAND COMMENTSConsultation Reply · PDF25 Jan 2023View
23.01.23 - OBJECTION LETTERObjection · PDF25 Jan 2023View
22.01.23 - HISTORIC ENGLAND COMMENTS.Consultation Reply24 Jan 2023View
19.01.23 - OBJECTION RESPONSE.Correspondence · PDF23 Jan 2023View
20.01.23 - NATURAL ENGLAND RESPONSEConsultation Reply23 Jan 2023View
23.01.23 - CHURCHILL PARISH COUNCILTown/Parish Council Comment · PDF23 Jan 2023View
EMAIL - NATIONAL HIGHWAYS OBJECTION RESPONSEConsultation Reply20 Jan 2023View
09/02/23 - LETTER OF SUPPORTSupport Comment · PDF19 Jan 2023View
16.01.23 - RESPONSE TO ACCESS TO BANWELL WOODS OBJECTIONSCorrespondence · PDF17 Jan 2023View
11.01.23 - WAYCOTT OBJECTION TO PLANNING APPLICATION LETTER-1Objection Comment16 Jan 2023View
11.01.23 - RUBY PLANNING APPLICATION OBJECTION LETTER-1Objection Comment16 Jan 2023View
05/01/2023 - FLOOD RISK MANAGEMENT TEAM COMMENTSConsultation Reply · PDF6 Jan 2023View
07.10.22 - ARUP RESPONSEConsultation Reply · PDF28 Dec 2022View
23/12/2022, WINSCOMBE AND SANDFORD PARISH COUNCILTown/Parish Council Comment23 Dec 2022View
BNWLBP-ARP-EGN-XXXX-RP-TR-000002 APPENDIX A_PART1.Application Support Info · PDF16 Dec 2022View
BNWLBP-ARP-EGN-XXXX-RP-TR-000002 APPENDIX A_PART2Application Support Info · PDF16 Dec 2022View
BNWLBP-ARP-EGN-XXXX-RP-TR-000002 APPENDIX A_PART3Application Support Info · PDF16 Dec 2022View
BNWLBP-ARP-EGN-XXXX-RP-TR-000002 APPENDIX B1_PART1Application Support Info · PDF16 Dec 2022View
BNWLBP-ARP-EGN-XXXX-RP-TR-000002 APPENDIX B1_PART2Application Support Info · PDF16 Dec 2022View
BNWLBP-ARP-EGN-XXXX-RP-TR-000002 APPENDIX B1_PART3Application Support Info · PDF16 Dec 2022View
BNWLBP-ARP-EGN-XXXX-RP-TR-000002 APPENDIX B1_PART4Application Support Info · PDF16 Dec 2022View
BNWLBP-ARP-EGN-XXXX-RP-TR-000002 APPENDIX B1_PART5Application Support Info · PDF16 Dec 2022View
BNWLBP-ARP-EGN-XXXX-RP-TR-000002 APPENDIX B1_PART6Application Support Info · PDF16 Dec 2022View
BNWLBP-ARP-EGN-XXXX-RP-TR-000002 APPENDIX B2Application Support Info · PDF16 Dec 2022View
BNWLBP-ARP-EGN-XXXX-RP-TR-000002 APPENDIX B3.Application Support Info · PDF16 Dec 2022View
BNWLBP-ARP-EGN-XXXX-RP-TR-000002 APPENDIX B4Application Support Info · PDF16 Dec 2022View
BNWLBP-ARP-EGN-XXXX-RP-TR-000002 APPENDIX B5Application Support Info · PDF16 Dec 2022View
BNWLBP-ARP-EGN-XXXX-RP-TR-000002 APPENDIX B6Application Support Info · PDF16 Dec 2022View
BNWLBP-ARP-EGN-XXXX-RP-TR-000002 APPENDIX B7Application Support Info · PDF16 Dec 2022View
BNWLBP-ARP-EGN-XXXX-RP-TR-000002 APPENDIX B8Application Support Info · PDF16 Dec 2022View
BNWLBP-ARP-EGN-XXXX-RP-TR-000002 APPENDIX B9Application Support Info · PDF16 Dec 2022View
BNWLBP-ARP-EGN-XXXX-RP-TR-000002 APPENDIX B10Application Support Info · PDF16 Dec 2022View
BNWLBP-ARP-EGN-XXXX-RP-TR-000002 APPENDIX B11Application Support Info · PDF16 Dec 2022View
BNWLBP-ARP-EGN-XXXX-RP-TR-000002 APPENDIX B12Application Support Info · PDF16 Dec 2022View
BNWLBP-ARP-EGN-XXXX-RP-TR-000002 JMRREPORTReport · PDF16 Dec 2022View
14.12.22 - APPENDICES - HIGHWAYS & TRANSPORTConsultation Reply15 Dec 2022View
14.12.22 - HIGHWAYS & TRANSPORT COMMENTSConsultation Reply15 Dec 2022View
Amended Application FormAmended Application Form · PDF15 Dec 2022View
COVER LETTER 15 DECEMBER 2022Letter from Agent · PDF15 Dec 2022View
ENVIRONMENTAL STATEMENT UPDATE REPORTEnvironment Statement · PDF15 Dec 2022View
PLANNING DESIGN AND ACCESS UPDATE REPORTReport · PDF15 Dec 2022View
PLANS AND DRAWINGS UPDATE REPORTReport · PDF15 Dec 2022View
P AND D UPDATE REPORT - APPENDIX A RED LINE BOUNDARY AMENDEDReport · PDF15 Dec 2022View
P AND D UPDATE REPORT - APPENDIX B1 HIGHWAY DRAINAGE DRAWINGS AMENDEDReport · PDF15 Dec 2022View
P AND D UPDATE REPORT - APPENDIX B2 HIGHWAY DRAINAGE DRAWINGS AMENDEDReport · PDF15 Dec 2022View
P AND D UPDATE REPORT - APPENDIX C PRIVATE MEANS OF ACCESS AMENDEDReport · PDF15 Dec 2022View
P AND D UPDATE REPORT - APPENDIX D1 WIDER MITIGATION PLANS AMENDEDReport · PDF15 Dec 2022View
P AND D UPDATE REPORT- APPENDIX D2 WIDER MITIGATION PLANS AMENDEDReport · PDF15 Dec 2022View
P AND D UPDATE REPORT - APPENDIX E1 ENVIRONMENTAL MASTERPLANS AMENDEDReport · PDF15 Dec 2022View
P AND D UPDATE REPORT - APPENDIX E2 ENVIRONMENTAL MASTERPLANS AMENDEDReport · PDF15 Dec 2022View
P AND D UPDATE REPORT - APPENDIX F GENERAL ARRANGEMENT PLANS AMENDEDReport · PDF15 Dec 2022View
13.12.2022 ES CHAPTER 6 ADDENDUM 5 ? PALEOENVIRONMENTAL ASSESSMENTConsultation Reply · PDF14 Dec 2022View
13.12.2022 APPLICANT'S RESPONSE TO PUBLIC COMMENTCorrespondence · PDF14 Dec 2022View
13.12.2022 APPLICANT REPSONSE TO PARISH COUNCILS COMMENTSCorrespondence · PDF14 Dec 2022View
13.12.2022 ADDITIONAL SPEED SURVEY DATA - WIDER MITIGATIONApplication Support Info · PDF14 Dec 2022View
13.12.2022 BIODIVERSITY DOCUMENT NATURAL ENGLANDConsultation Reply · PDF14 Dec 2022View
13.12.2022 APPLICANT RESPONSE TO AVON BAT GROUP COMMENTSCorrespondence · PDF14 Dec 2022View
13.12.2022 APPLICANT RESPONSE TO NSC BIODIVERSITY TEAM COMMENTSCorrespondence · PDF14 Dec 2022View
NATURAL ENGLAND MINSConsultation Reply · PDF14 Dec 2022View
MITIGATION TECHNICAL NOTEConsultation Reply · PDF14 Dec 2022View
GRAZING REVIEW OF FEASIBILITYConsultation Reply · PDF14 Dec 2022View
APPENDICESCorrespondence14 Dec 2022View
14.12.2022 HIGHWAYS AND TRANSPORT CONSULTATION RESPONSEConsultation Reply14 Dec 2022View
09.12.22 ENVIRO AGENCY RESPONSEConsultation Reply13 Dec 2022View
09.12.22 ENVIRONMENTAL AGENCY RESPONSEConsultation Reply · PDF13 Dec 2022View
ANSWERS TO QUERIESEmail13 Dec 2022View
ARCHAEOLOGICAL EVALUATION REPOR PART1Report · PDF9 Dec 2022View
ARCHAEOLOGICAL EVALUATION REPOR PART 2Report · PDF9 Dec 2022View
ARCHAEOLOGICAL EVALUATION REPOR PART 3Report · PDF9 Dec 2022View
ES CHAPTER6 ADDENDUM3Application Support Info · PDF9 Dec 2022View
VISUALISATIONS REQUESTEDBY HEApplication Support Info · PDF9 Dec 2022View
GEO PHYS REPORTReport · PDF9 Dec 2022View
ES CHAPTER 6 ADDENDUM 2Application Support Info · PDF9 Dec 2022View
ES CHAPTER 6 ADDENDUM 1Application Support Info · PDF9 Dec 2022View
BNWLBP-ARP-GEN-XXXX-CO-TP-000027_HISTORIC ENGLANDConsultation Reply · PDF9 Dec 2022View
BNWLBP-ARP-GEN-XXXX-CO-TP-000025_NSC_CONSERVATION HERITAGEConsultation Reply · PDF9 Dec 2022View
BNWLBP-ARP-GEN-XXXX-CO-TP-000018_ES CHAPTER 6 ADDENDUM 4Application Support Info · PDF9 Dec 2022View
BNWLBP-ARP-GEN-XXXX-CO-TP-000003_NSC_ARCHAEOLOGYConsultation Reply · PDF9 Dec 2022View
30.11.22 - OBJECTION RESPONSE 21.10.22Objection Comment · PDF7 Dec 2022View
24.10.22 - TREE OFFICER OBJECTION RESPONSEObjection Comment · PDF29 Nov 2022View
24/11/2022, SOMERSET DRAINAGE BOARDS CONSORTIUMConsultation Reply · PDF25 Nov 2022View
HIF BANWELL BYPASS AND HIGHWAYS IMPROVEMENTS PROJECTApplication Support Info · PDF22 Nov 2022View
11.08.22 - SPORT ENGLAND RESPONSEConsultation Reply · PDF22 Nov 2022View
NATIONAL HIGHWAYS FORMAL RECOMMENDATION.Consultee Comment · PDF22 Nov 2022View
RESPONSE TO NATURAL ENGLANDCorrespondence · PDF17 Nov 2022View
RESPONSE TO VARIOUS LANDOWNERSCorrespondence · PDF17 Nov 2022View
RESPONSE TO VARIOUS LANDOWNERSCorrespondence · PDF17 Nov 2022View
RESPONSE TO VARIOUS LANDOWNERSCorrespondence · PDF17 Nov 2022View
RESPONSE TO VARIOUS LANDOWNERSCorrespondence · PDF17 Nov 2022View
RESPONSE TO NEIGHBOURHOOD POLICING SUPPORT TEAMCorrespondence · PDF17 Nov 2022View
RESPONSE TO ROCKFIELD HOMES OBJECTIONCorrespondence · PDF17 Nov 2022View
RESPONSE TO NORTH SOMERSET LEVELS INTERNAL DRAINAGE BOARD (NSLIDB)Correspondence · PDF17 Nov 2022View
RESPONSE TO THE OLD POLICE HOUSE OBJECTIONCorrespondence · PDF17 Nov 2022View
RESPONSE TO ENVIRONMENTAL PROTECTIONCorrespondence · PDF17 Nov 2022View
RESPONSE TO TURLEYCorrespondence · PDF17 Nov 2022View
RESPONSE TO VISTRY GROUPCorrespondence · PDF17 Nov 2022View
RESPONSE TO MATTERS ASSOCIATED WITH BANWELL FOOTBALL CLUBCorrespondence · PDF17 Nov 2022View
RESPONSE TO NATURAL ENGLANDCorrespondence · PDF17 Nov 2022View
RESPONSE TO NATURAL ENGLANDCorrespondence · PDF17 Nov 2022View
RESPONSE TO TREE OFFICER COMMENTSCorrespondence · PDF17 Nov 2022View
RESPONSE TO ENVIRONMENT AGENCY OBJECTIONCorrespondence · PDF17 Nov 2022View
10.11.22 - NATURAL ENVIRONMENT OFFICER ? ECOLOGY COMMENTSConsultation Reply16 Nov 2022View
17.10.22 - NATURAL ENVIRONMENT OFFICER ? ECOLOGY COMMENTSConsultation Reply16 Nov 2022View
NOISE MONITORING IN SANDFORD, WINSCOMBE AND CHURCHILLNoise impact assessment · PDF31 Oct 2022View
29.07.22 - BLACK POPLAR SUMMARY NOTETree survey · PDF31 Oct 2022View
APPENDIX 4 TRANSPORT STRATEGY.TRANSPORT ASSESSMENT · PDF27 Oct 2022View
SITE LOCATION PLANPlan · PDF27 Oct 2022View
FRAMEWORK MASTERPLANPlan · PDF27 Oct 2022View
0801-09.M20 BANWELL BYPASS APPLICATION 21.10.2022 & RESPONSEApplication Support Info · PDF27 Oct 2022View
05.10.22 - LETTER WITH COMMENTS - VISTRY GROUPCorrespondence · PDF27 Oct 2022View
SPORT ENGLAND COMMENTSConsultation Reply25 Oct 2022View
13.10.22 - HIGHWAYS ENGLAND COMMENTS.Application Support Info19 Oct 2022View
12.10.22 - NEIGHBOURHOOD POLICING SUPPORT TEAM RESPONSEConsultee Comment13 Oct 2022View
11.10.22 - APPLICATION COMMENTS - BANWELL BYPASSCorrespondence · PDF12 Oct 2022View
12.10.22 - NEIGHBOURHOOD POLICING SUPPORT TEAM COMMENTSConsultation Reply12 Oct 2022View
ARUP RESPONSE TO NATURAL ENGLAND COMMENTS RECEIVED 2ND SEPTEMBER 2022Consultation Reply · PDF6 Oct 2022View
RESPONSE TO NATIONAL HIGHWAYS FORMAL RECOMMENDATION RESPONSEApplication Support Info · PDF29 Sept 2022View
AIR QUALITY MONITORING FILE NOTEApplication Support Info · PDF29 Sept 2022View
26.09.22 - LOCKING PARISH COUNCILTown/Parish Council Comment26 Sept 2022View
26.09.22 - MENDIP HILLS AONB UNIT RESPONSECorrespondence · PDF26 Sept 2022View
13.09.22 NORTH SOMERSET LEVELS RESPONSEConsultation Reply · PDF15 Sept 2022View
15.09.22 LETTER ENVIRO AGENCYCorrespondence · PDF15 Sept 2022View
HISTORIC ENGLAND ADVICE ON CASE PL00752503Consultation Reply12 Sept 2022View
26.08.22 - HOLDING RESPONSE LETTERCorrespondence · PDF7 Sept 2022View
02.09.22 - LETTER SAVILLSLetter of Objection & Support · PDF7 Sept 2022View
02.09.22 - OBJECTION LETTERObjection · PDF7 Sept 2022View
25.08.22 - PERKS & BALL - PLANNING REPSLetter from Agent · PDF7 Sept 2022View
30.08.22 - BANWELL BYPASS - REPS (WARE) FINAL.Letter from Agent · PDF7 Sept 2022View
05.09.22 - LETTER - BANWELL BYPASS - SAVILLSLetter from Agent · PDF7 Sept 2022View
26.08.22 - ENVIRONMENTAL PROTECTION COMMENTSConsultation Reply · PDF6 Sept 2022View
25/08/2022 - LETTER OF OBJECTION & SUPPORTLetter of Objection & Support · PDF6 Sept 2022View
02.09.22 - NATURAL ENGLAND RESPONSEConsultee Comment · PDF6 Sept 2022View
25/08/2022 - LETTER OF OBJECTION & SUPPORTLetter of Objection & Support · PDF6 Sept 2022View
23/08/22 - LETTER OF OBJECTION & SUPPORTLetter of Objection & Support · PDF5 Sept 2022View
18/08/2022 - LETTER OF OBJECTION & SUPPORTLetter of Objection & Support · PDF5 Sept 2022View
18/08/2022 - FLOOD RISK MANAGEMENT TEAM COMMENTSConsultation Reply · PDF5 Sept 2022View
01/09/2022, WESSEX WATERConsultee Comment2 Sept 2022View
27.08.22 - CHURCHILL PARISH COUNCIL RESPONSETown/Parish Council Comment · PDF30 Aug 2022View
26.08.22 - ENVIRONMENTAL PROTECTION COMMENTSConsultation Reply · PDF30 Aug 2022View
25.08.22 - NATIONAL HIGHWAYS FORMAL RECOMMENDATION RESPONSEConsultee Comment · PDF25 Aug 2022View
25/08/2022, OSBORNE CLARKE LLPConsultation Reply · PDF25 Aug 2022View
01.08.22 CONSULTATION RECEIPT OF LETTERConsultation Reply · PDF24 Aug 2022View
23.08.22 - WINSCOMBE AND SANDFORD PARISH COUNCILTown/Parish Council Comment · PDF24 Aug 2022View
PUXTON PARISH COUNCILTown/Parish Council Comment · PDF16 Aug 2022View
10/08/2022, WRINGTON PARISH COUNCILTown/Parish Council Comment12 Aug 2022View
HIF BANWELL BYPASS AND HIGHWAYS IMPROVEMENTS PROJECT - 02.08.22 - PO3Report · PDF11 Aug 2022View
HYDRAULIC MODELLING REPORTReport · PDF8 Aug 2022View
28/07/2022, SPORTS ENGLANDConsultee Comment2 Aug 2022View
28/07/2022, BRISTOL WATERConsultee Comment2 Aug 2022View
ASSET PLAN - 9 OF 9Plan · PDF2 Aug 2022View
ASSET PLAN - 8 OF 9Plan · PDF2 Aug 2022View
ASSET PLAN - 7 OF 9Plan · PDF2 Aug 2022View
ASSET PLAN - 6 OF 9Plan · PDF2 Aug 2022View
ASSET PLAN - 5 OF 9Plan · PDF2 Aug 2022View
ASSET PLAN - 4 OF 9Plan · PDF2 Aug 2022View
ASSET PLAN - 3 OF 9Plan · PDF2 Aug 2022View
ASSET PLAN - 2 OF 9Plan · PDF2 Aug 2022View
ASSET PLAN - 1 OF 9Plan · PDF2 Aug 2022View
01/08/2022 - NATIONAL PLANNING CASEWORK UNITConsultee Comment · PDF1 Aug 2022View
PRESS ADVERT - WESTON MERCURY 28/07/2022Press Advert · PDF28 Jul 2022View
CONSULTATION REPORTReport · PDF25 Jul 2022View
CONSULTATION ANALYSIS REPORTReport · PDF25 Jul 2022View
DESIGN AND ACCESSDesign and access statement · PDF25 Jul 2022View
DESIGN AND ACCESS - APPENDIX ADesign and access statement · PDF25 Jul 2022View
DESIGN AND ACCESS - APPENDIX BDesign and access statement · PDF25 Jul 2022View
ES NON-TECHNICAL SUMMARYEnvironment Statement · PDF25 Jul 2022View
ES VOL 1 - CHP 1 - INTRODUCTIONEnvironment Statement · PDF25 Jul 2022View
ES VOL 1 - CHP 2 - SCHEME DESCRIPTIONEnvironment Statement · PDF25 Jul 2022View
ES VOL 1 - CHP 3 - ALTERNATIVES CONSIDEREDEnvironment Statement · PDF25 Jul 2022View
ES VOL 1 - CHP 4 - PLANNING FRAMEWORKEnvironment Statement · PDF25 Jul 2022View
ES VOL 1 - CHP 5 - AIR QUALITYEnvironment Statement · PDF25 Jul 2022View
ES VOL 1 - CHP 6 - CULTURAL HERITAGEEnvironment Statement · PDF25 Jul 2022View
ES VOL 1 - CHP 7 - LANDSCAPEEnvironment Statement · PDF25 Jul 2022View
ES VOL 1 - CHP 8 - BIODIVERSITYEnvironment Statement · PDF25 Jul 2022View
ES VOL 1 - CHP 9 - GEOLOGY AND SOILSEnvironment Statement · PDF25 Jul 2022View
ES VOL 1 - CHP 10 - MATERIAL ASSETS AND WASTEEnvironment Statement · PDF25 Jul 2022View
ES VOL 1 - CHP 11 - NOISE AND VIBRATIONEnvironment Statement · PDF25 Jul 2022View
ES VOL 1 - CHP 12 - POPULATION AND HUMAN HEALTHEnvironment Statement · PDF25 Jul 2022View
ES VOL 1 - CHP 13 - ROAD DRAINAGE & WATER ENVIRONMENTEnvironment Statement · PDF25 Jul 2022View
ES VOL 1 - CHP 14 - CLIMATEEnvironment Statement · PDF25 Jul 2022View
ES VOL 1 - CHP 15 - CUMULATIVE EFFECTSEnvironment Statement · PDF25 Jul 2022View
ES VOL 1 - CHP 16 - ENVIRONMENTAL MANAGEMENTEnvironment Statement · PDF25 Jul 2022View
ES VOL 1 - CHP 17 - CONCLUSIONEnvironment Statement · PDF25 Jul 2022View
RED LINE BOUNDARY PLAN - SHEET 1 OF 9Plan · PDF25 Jul 2022View
RED LINE BOUNDARY PLAN - SHEET 2 OF 9Plan · PDF25 Jul 2022View
RED LINE BOUNDARY PLAN - SHEET 3 OF 9Plan · PDF25 Jul 2022View
RED LINE BOUNDARY PLAN - SHEET 4 OF 9Plan · PDF25 Jul 2022View
RED LINE BOUNDARY PLAN - SHEET 5 OF 9Plan · PDF25 Jul 2022View
RED LINE BOUNDARY PLAN - SHEET 6 OF 9Plan · PDF25 Jul 2022View
RED LINE BOUNDARY PLAN - SHEET 7 OF 9Plan · PDF25 Jul 2022View
RED LINE BOUNDARY PLAN - SHEET 8 OF 9Plan · PDF25 Jul 2022View
RED LINE BOUNDARY PLAN - SHEET 9 OF 9Plan · PDF25 Jul 2022View
SITE LOCATION PLANPlan · PDF25 Jul 2022View
TRANSPORT ASSESSMENTTRANSPORT ASSESSMENT · PDF25 Jul 2022View
TA - APPENDIX ATRANSPORT ASSESSMENT · PDF25 Jul 2022View
TA - APPENDIX BTRANSPORT ASSESSMENT · PDF25 Jul 2022View
TA - APPENDIX CTRANSPORT ASSESSMENT · PDF25 Jul 2022View
TA - APPENDIX D - STRATEGIC MODEL LMVR ADDENDUMTRANSPORT ASSESSMENT · PDF25 Jul 2022View
TA - APPENDIX E - STRATEGIC MODEL FORECASTING REPORTTRANSPORT ASSESSMENT · PDF25 Jul 2022View
TA - APPENDIX F1 - JUNCTION MODELLING REPORTTRANSPORT ASSESSMENT · PDF25 Jul 2022View
TA - APPENDIX F2 - JUNCTION MODELLING REPORTTRANSPORT ASSESSMENT · PDF25 Jul 2022View
TA - APPENDIX F3 - JUNCTION MODELLING REPORTTRANSPORT ASSESSMENT · PDF25 Jul 2022View
TA - APPENDIX F4 - JUNCTION MODELLING REPORTTRANSPORT ASSESSMENT · PDF25 Jul 2022View
TA - APPENDIX F5 - JUNCTION MODELLING REPORTTRANSPORT ASSESSMENT · PDF25 Jul 2022View
TA - APPENDIX F6 - JUNCTION MODELLING REPORTTRANSPORT ASSESSMENT · PDF25 Jul 2022View
TA - APPENDIX F7 - JUNCTION MODELLING REPORTTRANSPORT ASSESSMENT · PDF25 Jul 2022View
TA - APPENDIX F8 - JUNCTION MODELLING REPORTTRANSPORT ASSESSMENT · PDF25 Jul 2022View
TA - APPENDIX F9 - JUNCTION MODELLING REPORTTRANSPORT ASSESSMENT · PDF25 Jul 2022View
TA - APPENDIX G - JUNCTION 21 SOUTHBOUND DIVERGE TRAFFIC ASSESSMENTTRANSPORT ASSESSMENT · PDF25 Jul 2022View
TA - APPENDIX H - WIDER MITIGATION MEASURES SUMMARY REPORTTRANSPORT ASSESSMENT · PDF25 Jul 2022View
TA - APPENDIX I - STRATEGIC MODEL SENSITIVITY TESTINGTRANSPORT ASSESSMENT · PDF25 Jul 2022View
FLOOD EVACUATION PLANFlood risk assessment · PDF25 Jul 2022View
HEALTH IMPACT ASSESSMENTReport · PDF25 Jul 2022View
LIGHTING STRATEGYReport · PDF25 Jul 2022View
OPEN SPACE ASSESSMENTReport · PDF25 Jul 2022View
STAGE 1 ROAD SAFETY AUDIT RESPONSEReport · PDF25 Jul 2022View
PLANNING STATEMENTReport · PDF25 Jul 2022View
SURFACE WATER DRAINAGE STRATEGYReport · PDF25 Jul 2022View
WIDER NETWORK MITIGATION MEASURES SPEED LIMITS ASSESSMENT REPORTReport · PDF25 Jul 2022View
WALKING CYCLING HORSE -RIDING ASSESSMENT REPORTReport · PDF25 Jul 2022View
WALKING CYCLING HORSE -RIDING REVIEW REPORT - PRELIMINARY DESIGNReport · PDF25 Jul 2022View
APPENDIX A TO APPLICATION FORM - NOTICE AND CERTIFICATE CApplication Ownership Certificate · PDF25 Jul 2022View
APPENDIX B TO APPLICATION FORM - LIST OF LANDOWNERSApplication Ownership Certificate · PDF25 Jul 2022View
HIGHWAY DRAINAGE - SHEET 1 OF 7Plan · PDF25 Jul 2022View
HIGHWAY DRAINAGE - SHEET 2 OF 7Plan · PDF25 Jul 2022View
HIGHWAY DRAINAGE - SHEET 3 OF 7Plan · PDF25 Jul 2022View
HIGHWAY DRAINAGE - SHEET 4 OF 7Plan · PDF25 Jul 2022View
HIGHWAY DRAINAGE - SHEET 5 OF 7Plan · PDF25 Jul 2022View
HIGHWAY DRAINAGE - SHEET 6 OF 7Plan · PDF25 Jul 2022View
HIGHWAY DRAINAGE - SHEET 7 OF 7Plan · PDF25 Jul 2022View
GENERAL ARRANGEMENT - SHEET 1 OF 6Plan · PDF25 Jul 2022View
GENERAL ARRANGEMENT - SHEET 2 OF 6Plan · PDF25 Jul 2022View
GENERAL ARRANGEMENT - SHEET 3 OF 6Plan · PDF25 Jul 2022View
GENERAL ARRANGEMENT - SHEET 4 OF 6Plan · PDF25 Jul 2022View
GENERAL ARRANGEMENT - SHEET 5 OF 6Plan · PDF25 Jul 2022View
GENERAL ARRANGEMENT - SHEET 6 OF 6Plan · PDF25 Jul 2022View
PLAN AND PROFILE MAINLINE - SHEET 1 OF 6Plan · PDF25 Jul 2022View
PLAN AND PROFILE MAINLINE - SHEET 2 OF 6Plan · PDF25 Jul 2022View
PLAN AND PROFILE MAINLINE - SHEET 3 OF 6Plan · PDF25 Jul 2022View
PLAN AND PROFILE MAINLINE - SHEET 4 OF 6Plan · PDF25 Jul 2022View
PLAN AND PROFILE MAINLINE - SHEET 5 OF 6Plan · PDF25 Jul 2022View
PLAN AND PROFILE MAINLINE - SHEET 6 OF 6Plan · PDF25 Jul 2022View
PLAN AND PROFILE SIDE ROADS - SHEET 1 OF 6Plan · PDF25 Jul 2022View
PLAN AND PROFILE SIDE ROADS - SHEET 2 OF 6Plan · PDF25 Jul 2022View
PLAN AND PROFILE SIDE ROADS - SHEET 3 OF 6Plan · PDF25 Jul 2022View
PLAN AND PROFILE SIDE ROADS - SHEET 4 OF 6Plan · PDF25 Jul 2022View
PLAN AND PROFILE SIDE ROADS - SHEET 5 OF 6Plan · PDF25 Jul 2022View
PLAN AND PROFILE SIDE ROADS - SHEET 6 OF 6Plan · PDF25 Jul 2022View
SBR-1760 OLD YEO RHYNE CULVERT (MAINLINE) GENERAL ARRANGEMENTPlan · PDF25 Jul 2022View
APPLICATION FORMApplication Form · PDF25 Jul 2022View
WIDER NETWORK MITIGATION - GENERAL ARRANGEMENT - SHEET 1 OF 13Plan · PDF25 Jul 2022View
WIDER NETWORK MITIGATION - GENERAL ARRANGEMENT - SHEET 10 OF 13Plan · PDF25 Jul 2022View
WIDER NETWORK MITIGATION - GENERAL ARRANGEMENT - SHEET 11 OF 13Plan · PDF25 Jul 2022View
WIDER NETWORK MITIGATION - GENERAL ARRANGEMENT - SHEET 12 OF 13Plan · PDF25 Jul 2022View
WIDER NETWORK MITIGATION - GENERAL ARRANGEMENT - SHEET 13 OF 13Plan · PDF25 Jul 2022View
WIDER NETWORK MITIGATION - GENERAL ARRANGEMENT - SHEET 2 OF 13Plan · PDF25 Jul 2022View
WIDER NETWORK MITIGATION - GENERAL ARRANGEMENT - SHEET 3 OF 13Plan · PDF25 Jul 2022View
WIDER NETWORK MITIGATION - GENERAL ARRANGEMENT - SHEET 4 OF 13Plan · PDF25 Jul 2022View
WIDER NETWORK MITIGATION - GENERAL ARRANGEMENT - SHEET 5 OF 13Plan · PDF25 Jul 2022View
WIDER NETWORK MITIGATION - GENERAL ARRANGEMENT - SHEET 6 OF 13Plan · PDF25 Jul 2022View
WIDER NETWORK MITIGATION - GENERAL ARRANGEMENT - SHEET 7 OF 13Plan · PDF25 Jul 2022View
WIDER NETWORK MITIGATION - GENERAL ARRANGEMENT - SHEET 8 OF 13Plan · PDF25 Jul 2022View
WIDER NETWORK MITIGATION - GENERAL ARRANGEMENT - SHEET 9 OF 13Plan · PDF25 Jul 2022View
ES VOL 2 - FIG 5.1-5.8Environment Statement · PDF25 Jul 2022View
ES VOL 2 - FIG 7.1-7.8Environment Statement · PDF25 Jul 2022View
ES VOL 2 - FIG 7.9Environment Statement · PDF25 Jul 2022View
ES VOL 2 - FIG 7.10Environment Statement · PDF25 Jul 2022View
ES VOL 2 - FIG 8.1Environment Statement · PDF25 Jul 2022View
ES VOL 2 - FIG 9.1-9.5Environment Statement · PDF25 Jul 2022View
ES VOL 2 - FIG 10.1Environment Statement · PDF25 Jul 2022View
ES VOL 2 - FIG 11.1-11.5Environment Statement · PDF25 Jul 2022View
ES VOL 2 - FIG 12.1-12.8Environment Statement · PDF25 Jul 2022View
ES VOL 2 - FIG 13.1-13.4Environment Statement · PDF25 Jul 2022View
ES VOL 2 - FIG 15.1-15.2Environment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 1.AEnvironment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 1.B.1Environment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 1.B.2Environment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 1.B.3Environment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 1.B.4Environment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 1.B.5Environment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 1.B.6Environment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 1.B.7Environment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 1.C-1.FEnvironment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 1.G1-1.G2Environment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 2.AEnvironment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 3.A-3.BEnvironment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 5.A-5.FEnvironment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 6.A-6.FEnvironment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 6.G.1-6.G.3Environment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 6.H-6.LEnvironment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 8.A-8.B.2Environment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 8.CEnvironment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 8.DEnvironment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 8.E.1Environment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 8.E.2Environment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 8.E.3Environment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 8.E.4Environment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 8.E.5Environment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 8.FEnvironment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 8.G1-8.G5Environment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 8.H-8.LEnvironment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 8.M-8.PEnvironment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 8.Q.1-8.Q.2Environment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 8.R.1-8.R.5Environment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 8.R.6-8.R.8Environment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 9.A.1Environment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 9.A.2Environment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 9.A.3Environment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 9.A.4Environment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 9.A.5Environment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 9.A.6Environment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 9.B.1Environment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 9.B.2 PART 1Environment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 9.B.2 PART 2Environment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 9.B.2 PART 3Environment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 9.CEnvironment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 9.DEnvironment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 11.A-11.DEnvironment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 12.A-12.IEnvironment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 13.A-13.DEnvironment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 14.A-14.FEnvironment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 16.A-16.CEnvironment Statement · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 2.AEnvironment Statement · PDF25 Jul 2022View
PLACEMAKING PROVISIONS PLAN - SHEET 1 OF 9Plan · PDF25 Jul 2022View
PLACEMAKING PROVISIONS PLAN - SHEET 2 OF 9Plan · PDF25 Jul 2022View
PLACEMAKING PROVISIONS PLAN - SHEET 3 OF 9Plan · PDF25 Jul 2022View
DRAINAGE CATCHMENT DRAWINGS 1 (3 DRAWINGS)Plan · PDF25 Jul 2022View
DRAINAGE CATCHMENT DRAWINGS 2 (2 DRAWINGS)Plan · PDF25 Jul 2022View
PLACEMAKING PROVISIONS PLAN - SHEET 4 OF 9Plan · PDF25 Jul 2022View
PLACEMAKING PROVISIONS PLAN - SHEET 5 OF 9Plan · PDF25 Jul 2022View
PLACEMAKING PROVISIONS PLAN - SHEET 6 OF 9Plan · PDF25 Jul 2022View
PLACEMAKING PROVISIONS PLAN - SHEET 7 OF 9Plan · PDF25 Jul 2022View
PLACEMAKING PROVISIONS PLAN - SHEET 8 OF 9Plan · PDF25 Jul 2022View
PLACEMAKING PROVISIONS PLAN - SHEET 9 OF 9Plan · PDF25 Jul 2022View
SBR-1375 WALLYMEAD RHYNE CULVERT (EAST) GENERAL ARRANGEMENTPlan · PDF25 Jul 2022View
SBR-1760 OLD YEO RHYNE CULVERT (MAINLINE) GENERAL ARRANGEMENTPlan · PDF25 Jul 2022View
SBR-0550 WALLYMEAD RHYNE CULVERT (WEST) GENERAL ARRANGEMENTPlan · PDF25 Jul 2022View
SBR-1930 BANWELL BYPASS UNDERBRIDGE - GENERAL ARRANGEMENTPlan · PDF25 Jul 2022View
SBR-2310 - EAST MEAD RHYNE CULVERT - GENERAL ARRANGEMENTPlan · PDF25 Jul 2022View
VISIBILITY PRIVATE MEANS OF ACCESS - SHEET 1 OF 2Plan · PDF25 Jul 2022View
VISIBILITY PRIVATE MEANS OF ACCESS - SHEET 2 OF 2Plan · PDF25 Jul 2022View
TYPICAL CROSS SECTION - SHEET 1 OF 2Plan · PDF25 Jul 2022View
TYPICAL CROSS SECTION - SHEET 2 OF 2Plan · PDF25 Jul 2022View
COVERING LETTER FROM AGENTLetter from Agent · PDF25 Jul 2022View
MOOR ROAD DIVERSION STRUCTURESPlan · PDF25 Jul 2022View
LOCATION OF APPLICATION DOCUMENTS IN ACCORDANCE WITH NSC VALIDATION REQUIREMENTSApplication Form · PDF25 Jul 2022View
ENVIRONMENTAL MASTERPLAN - SHEET 1 OF 6Plan · PDF25 Jul 2022View
ENVIRONMENTAL MASTERPLAN - SHEET 2 OF 6Plan · PDF25 Jul 2022View
ENVIRONMENTAL MASTERPLAN - SHEET 3 OF 6Plan · PDF25 Jul 2022View
ENVIRONMENTAL MASTERPLAN - SHEET 4 OF 6Plan · PDF25 Jul 2022View
ENVIRONMENTAL MASTERPLAN - SHEET 5 OF 6Plan · PDF25 Jul 2022View
ENVIRONMENTAL MASTERPLAN - SHEET 6 OF 6Plan · PDF25 Jul 2022View
ES VOL 3 - APPENDIX 7.A-7.DEnvironment Statement · PDF25 Jul 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Consultation Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source
  6. Decision Made Date

    Published milestoneCouncil source
  7. Extended Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve
DECISION LETTER AOC 7(B), 7(F) AND 29 (PHASE 2B RIVERSIDE BRIDGE AND PHASE 2D DECISION NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.