Council planning record

Formal submission to discharge Requirement 6(1)(e) and 8 (Lighting Scheme for Stage 7.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).

Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.

DecidedReference: 22/P/1651/DCMNorth Somerset Council

Application location

Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth.

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Development Consent Order - Major
Received
5 Jul 2022
Validated
5 Jul 2022
Determination deadline
30 Aug 2022
Local authority
North Somerset Council

Application overview

Formal submission to discharge Requirement 6(1)(e) and 8 (Lighting Scheme for Stage 7.1 of the authorised development) of the National Grid (Hinkley Point C Connection Project) Order 2016 (as Amended).

Proposal details

Reference
22/P/1651/DCM
Parish
Unparished
Agent
Arup

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 22 of 22

DocumentPublishedAction
DECISION (DCM) APPROVEDecision Notice · PDF26 Aug 2022View
NORTH SOMERSET OFFICER REPORTDelegated Report · PDF26 Aug 2022View
APPLICATIONFORMREDACTEDApplication Form · PDF5 Jul 2022View
APPENDIX B - LIGHTING LAYOUT PLANS - AC3637 AC38 AC40Report · PDF5 Jul 2022View
APPENDIX B - LIGHTING LAYOUT PLANS - RIVERVIEW LD10Report · PDF5 Jul 2022View
APPENDIX C - LIGHTING CALCULATIONSReport · PDF5 Jul 2022View
APPENDIX D - UGC COMPOUND LIGHTING PLANSReport · PDF5 Jul 2022View
APPENDIX E - WATER VOLE MITIGATION STRATEGY - C127329-10-01Report · PDF5 Jul 2022View
APPENDIX E - WATER VOLE MITIGATION STRATEGY - C127329-10-02Report · PDF5 Jul 2022View
APPENDIX F - BAT ROOSTS AND BAT POTENTIAL TREESReport · PDF5 Jul 2022View
APPENDIX G - ACTIVE BADGER SETTSReport · PDF5 Jul 2022View
APPENDIX A - LIGHTING LOCATION PLAN 1OF3Report · PDF5 Jul 2022View
APPENDIX A - LIGHTING LOCATION PLAN 2OF3Report · PDF5 Jul 2022View
APPENDIX A - LIGHTING LOCATION PLAN 3OF3Report · PDF5 Jul 2022View
APPENDIX B - LIGHTING LAYOUT PLANS - A38 OHL COMPOUNDReport · PDF5 Jul 2022View
APPENDIX B - LIGHTING LAYOUT PLANS - AC1 AC2 AC8 AC10Report · PDF5 Jul 2022View
APPENDIX B - LIGHTING LAYOUT PLANS - AC3 4 AC7Report · PDF5 Jul 2022View
APPENDIX B - LIGHTING LAYOUT PLANS - AC9 AC11 AC12 13Report · PDF5 Jul 2022View
APPENDIX B - LIGHTING LAYOUT PLANS - AC22 23 AC24 25 AC26 27Report · PDF5 Jul 2022View
APPENDIX B - LIGHTING LAYOUT PLANS - AC28 29 AC32 33 AC34 35Report · PDF5 Jul 2022View
HCP- 7.1 6E F - LIGHTING SCHEMEReport · PDF5 Jul 2022View
HCP - 7.1 6E F - COVER LETTER NSCLetter from Applicant · PDF5 Jul 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
  4. Decision Made Date

    Published milestoneCouncil source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve
DECISION (DCM) APPROVE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.