Hinkley C Connection Project. Stage 1.1 Churchill Sub station Discharge of Requirement 6 (1) (b), ( Drainage Management Plan), 17 (Surface water drainage), 21 (Accumlan deposits) of the National Grid ( Hinkley Point C Connection Project) Order 2016 . THIS IS NOT A PLANNING APPLICATION
Hinkley Point C Connection Project, Between Bridgwater In Somerset And Seabank Substation, North Of Avonmouth
Hinkley C Connection Project. Stage 1.1 Churchill Sub station Discharge of Requirement 6 (1) (b), ( Drainage Management Plan), 17 (Surface water drainage), 21 (Accumlan deposits) of the National Grid ( Hinkley Point C Connection Project) Order 2016 . THIS IS NOT A PLANNING APPLICATION
Reference
18/P/2422/DCO1
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.