Council planning record

Installation of 45MW battery energy storage system (BESS) and associated infrastructure, including acoustic fence and cctv system.

Off Of Locks Street Coatdyke Coatbridge North Lanarkshire ML5 3RT

Application WithdrawnReference: 25/00935/FULNorth Lanarkshire

Last published check: 28 Sept 2026, 12:07. Check the council record for more recent changes.

Application location

Off Of Locks Street Coatdyke Coatbridge North Lanarkshire ML5 3RT

This record has no verified map location.

View council map

Application summary

Status
Application Withdrawn
Application type
Planning Permission
Received
1 Sept 2025
Validated
15 Sept 2025
Determination deadline
Not published
Local authority
North Lanarkshire

Application overview

Installation of 45MW battery energy storage system (BESS) and associated infrastructure, including acoustic fence and cctv system.

Proposal details

Reference
25/00935/FUL
Alternative references
100721537-001
Ward
Coatbridge South
Agent
Cogeo

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 29 of 29

DocumentPublishedAction
Transport scotland response - 16122025Consultation Response · PDF18 Dec 2025View
Site planRevised Drawing · PDF15 Sept 2025View
Notifin - neighbours notified with mapNeighbour Notification List · PDF2 Sept 2025View
Appendix 11_1 bess noise test reportReport · PDF1 Sept 2025View
Coatbridge bess site waste management planDrawing · PDF1 Sept 2025View
Appendix 13_1 transport statementReport · PDF1 Sept 2025View
Appendix 14_1 outline battery safety management planReport · PDF1 Sept 2025View
Typical cable trench_access trackDrawing · PDF1 Sept 2025View
Spare parts container_welfare unitDrawing · PDF1 Sept 2025View
Secondary auxiliary transformerDrawing · PDF1 Sept 2025View
Existing site planDrawing · PDF1 Sept 2025View
Battery energy storage unit with de-noise kitDrawing · PDF1 Sept 2025View
Battery compacted mv stationDrawing · PDF1 Sept 2025View
33kv brick built dno substationDrawing · PDF1 Sept 2025View
Customer switchroomDrawing · PDF1 Sept 2025View
Main auxiliary transformerDrawing · PDF1 Sept 2025View
Security fence_gate_acoustic fence_polemounted cctvDrawing · PDF1 Sept 2025View
Townscapes and landscape designationsDrawing · PDF1 Sept 2025View
Appendix 5_2 drone photograph above core pathPhoto · PDF1 Sept 2025View
Appendix 5_3 viaduct on national cycle route 75 baselinePhoto · PDF1 Sept 2025View
Appendix 5_4 viaduct on national cycle route 75 3d modelPhoto · PDF1 Sept 2025View
Appendix 6_1 heritage impact assessmentReport · PDF1 Sept 2025View
Appendix 7_1 preliminary ecological appraisalReport · PDF1 Sept 2025View
Appendix 7_2 biodiversity enhancement planReport · PDF1 Sept 2025View
Appendix 8_1 tree survey and arboricultural implication assessmentReport · PDF1 Sept 2025View
Appendix 9_1 coal mining risk assessmentReport · PDF1 Sept 2025View
Coatbridge bess pac reportReport · PDF1 Sept 2025View
Coatbridge bess planning statementReport · PDF1 Sept 2025View
Location planDrawing · PDF1 Sept 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  3. Application Validated Date

    Published milestoneCouncil source
  4. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Decision Issued Date

    Published milestoneCouncil source
  8. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Application Withdrawn
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.