Scope of Works:T1 - Ash Tree, Eastern tree of group, reduce canopy spread by 2-3m back to suitable points to reshape crown and reduce weight of branches over neighbouring property.T2 - Ash tree, central tree of group, reduce height of canopy by up to 3m back to suitable growth points, to create a uniform group level with T1. Reduce spread of low lateral branches over neighbouring property by up to 2m to suitable point to leave unform shape to crown.T3 - Ash, Western tree of group, reduce overall height by up to 3m back to suitable points in line with group canopy line, reduce outer spread to canopy by up to 2m radial growth to balance crown and reduce weight of long low lateral branches over boundary.
21 Gail Grove Heighington Lincoln Lincolnshire LN4 1QS
Scope of Works:T1 - Ash Tree, Eastern tree of group, reduce canopy spread by 2-3m back to suitable points to reshape crown and reduce weight of branches over neighbouring property.T2 - Ash tree, central tree of group, reduce height of canopy by up to 3m back to suitable growth points, to create a uniform group level with T1. Reduce spread of low lateral branches over neighbouring property by up to 2m to suitable point to leave unform shape to crown.T3 - Ash, Western tree of group, reduce overall height by up to 3m back to suitable points in line with group canopy line, reduce outer spread to canopy by up to 2m radial growth to balance crown and reduce weight of long low lateral branches over boundary.
Reference
25/0583/TPO
Alternative references
PP-14024672
Ward
Heighington And Washingborough
Parish
Heighington
Agent
B&B TREE SPECIALISTS
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.