Council planning record

Growing Baldock Development Site: Outline planning application with all matters reserved except for means of highway access into the development from North Road and Clothall Road for: up to 3,200 homes, up to 16ha of employment, waste and leisure infrastructure, a mixed use local centre, up to 1 secondary school, up to 2 x primary schools, nursery/childcare facilities, health hub, green infrastructure (including parks, formal sports provision, play, habitat areas, informal open space and structural planting), internal street network, access junctions and railway crossing, public transport infrastructure, pedestrian/cycle network (including PRoW diversions, active travel routes, mobility hubs and crossing of the railway), utilities and drainage infrastructure (including diversions of existing and provision of new infrastructure, pumping stations, sustainable drainage, primary substations, rising main/strategic sewer and renewable energy infrastructure), ground remodelling/earthworks and any necessary demolitions (as amended)

BA1(Land East Of North Rd And North Of Railway Line); BA10(Land Between Railway Line And Royston Rd); BA3 (Land West Of A505); BA2 (Land South Of Clothall Rd); Walls Field; Urban Open Land West Of A505, And Land West Of North Rd, Baldock

RegisteredReference: 25/02571/OPNorth Hertfordshire District Council

Last published check: 12 Oct 2026, 00:17. Check the council record for more recent changes.

Application location

BA1(Land East Of North Rd And North Of Railway Line); BA10(Land Between Railway Line And Royston Rd); BA3 (Land West Of A505); BA2 (Land South Of Clothall Rd); Walls Field; Urban Open Land West Of A505, And Land West Of North Rd, Baldock

This record has no verified map location.

View council map

Application summary

Status
Registered
Application type
Outline Application
Received
8 Oct 2025
Validated
13 Oct 2025
Determination deadline
Not published
Local authority
North Hertfordshire District Council

Application overview

Growing Baldock Development Site: Outline planning application with all matters reserved except for means of highway access into the development from North Road and Clothall Road for: up to 3,200 homes, up to 16ha of employment, waste and leisure infrastructure, a mixed use local centre, up to 1 secondary school, up to 2 x primary schools, nursery/childcare facilities, health hub, green infrastructure (including parks, formal sports provision, play, habitat areas, informal open space and structural planting), internal street network, access junctions and railway crossing, public transport infrastructure, pedestrian/cycle network (including PRoW diversions, active travel routes, mobility hubs and crossing of the railway), utilities and drainage infrastructure (including diversions of existing and provision of new infrastructure, pumping stations, sustainable drainage, primary substations, rising main/strategic sewer and renewable energy infrastructure), ground remodelling/earthworks and any necessary demolitions (as amended)

Proposal details

Reference
25/02571/OP
Alternative references
PP-14325165
Ward
Baldock East Ward
Parish
Bygrave Parish Council
Agent
Ms Helen Armes

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 335 of 335

DocumentPublishedAction
HCC Highways Consultee ResponseConsultee Response PublishedNot publishedView
North Baldock Financial Viability Assessment Addendum -consultation response from Carter JonasSupporting DocumentsNot publishedView
CBRE Viability Review Response LetterSupporting DocumentsNot publishedView
Carter Jonas Response to Appendix J - CBRE Financial Viability Statement on Behalf of North Hertfordshire CouncilSupporting DocumentsNot publishedView
HCC Growth and Infrastructure Consultee ResponseConsultee Response PublishedNot publishedView
Active Travel England Consultee ResponseConsultee Response PublishedNot publishedView
Central Bedfordshire Council Consultee ResponseConsultee Response PublishedNot publishedView
Hertfordshire Public Health Consultee ResponseConsultee Response PublishedNot publishedView
Applicant's response to Active Travel England’s commentsSupporting DocumentsNot publishedView
National Highways Consultee ResponseConsultee Response PublishedNot publishedView
Active Travel England Consultee ResponseConsultee Response PublishedNot publishedView
Sport England Consultee ResponseConsultee Response PublishedNot publishedView
HCC Lead Local Flood Authority Consultee ResponseConsultee Response PublishedNot publishedView
Cover Letter - August 2026Supporting DocumentsNot publishedView
Appendix A - Contents of this SubmissionSupporting DocumentsNot publishedView
Appendix B(1) - Applicant Response HCC HighwaysSupporting DocumentsNot publishedView
Appendix B(2) - ITP to HCC Cover LetterSupporting DocumentsNot publishedView
Appendix C - ITP National Highways ResponseSupporting DocumentsNot publishedView
Appendix D - ITP NHC Highways Cover LetterSupporting DocumentsNot publishedView
Appendix E - Growing Baldock Framework Travel PlanSupporting DocumentsNot publishedView
Appendix F - Revised Royston Road Offsite Interventions PlansPlansNot publishedView
Appendix G - Sport England Response August 2026Supporting DocumentsNot publishedView
Appendix H - Applicant Response to British Horse SocietySupporting DocumentsNot publishedView
Appendix I - Development Specification Revised July 2026Supporting DocumentsNot publishedView
Appendix J - CBRE Financial Viability StatementSupporting DocumentsNot publishedView
Corn bunting and BNGSupporting DocumentsNot publishedView
Anglian Water Consultee ResponseConsultee Response PublishedNot publishedView
Leisure Contracts Manager Consultee Response - Received 06.07.2026Consultee Response PublishedNot publishedView
HCC Highways Consultee Response - Received 03.07.2026Consultee Response PublishedNot publishedView
RSPB Consultee ResponseConsultee Response PublishedNot publishedView
Bygrave Parish Council Consultee ResponseConsultee Response PublishedNot publishedView
Hertfordshire Public Health Consultee ResponseConsultee Response PublishedNot publishedView
Active Travel England Consultee ResponseConsultee Response PublishedNot publishedView
HCC Growth and Infrastructure Consultee ResponseConsultee Response PublishedNot publishedView
The Ramblers Association (Herts and Middlesex) Consultee ResponseConsultee Response PublishedNot publishedView
The British Horse Society Consultee ResponseConsultee Response PublishedNot publishedView
Herts and Middlesex Wildlife Trust Consultee ResponseConsultee Response PublishedNot publishedView
Central Bedfordshire Council Consultee ResponseConsultee Response PublishedNot publishedView
HCC Lead Local Flood Authority Consultee ResponseConsultee Response PublishedNot publishedView
Agents agreement to revised descriptionSupporting DocumentsNot publishedView
SUPERSEDED Appendix 2.2 - Development Specification Development Specification Revised May 2026 FinalSuperseded Plans - Published to WebNot publishedView
Appendix 10.1 - Drainage Strategy 260505 Drainage Strategy (Part 6)Supporting DocumentsNot publishedView
Appendix 1.1 - NHC Reg 25 Request Reg 25 FRI 20022026Supporting DocumentsNot publishedView
Growing Baldock - Cover Letter Submission May 2026Supporting DocumentsNot publishedView
Appendix 10.1 - Drainage Strategy 260505 Drainage Strategy (Part 3)Supporting DocumentsNot publishedView
Appendix 10.1 - Drainage Strategy 260505 Drainage Strategy (Part 4)Supporting DocumentsNot publishedView
Appendix 10.1 - Drainage Strategy 260505 Drainage Strategy (Part 5)Supporting DocumentsNot publishedView
Appendix 11.1 - On-Site Corn Bunting Mitigation Strategy BMD.21.0045.RPE.TN.819.001 - Onsite Corn Bunting MitigationSupporting DocumentsNot publishedView
Appendix 11.2 - Off-Site Corn Bunting Mitigation Strategy BMD.21.0045.RPE.TN.819.002 - Offsite Corn Bunting CompensationSupporting DocumentsNot publishedView
Appendix 10.1 - Drainage Strategy 260505 Drainage Strategy (Part 2)Supporting DocumentsNot publishedView
Appendix 4.1 - Transport Assessment Addendum PC7029-ITP-XX-XX-RP-TP-0012-C01-Growing Baldock-TAASupporting DocumentsNot publishedView
ES Addendum - Chapter 17 Climate ChangeSupporting DocumentsNot publishedView
ES Addendum - Chapter 18 ConclusionSupporting DocumentsNot publishedView
Appendix 2.1 - Development Site Boundary UAC092-001 - RevG - Outline Planning Application BoundarySupporting DocumentsNot publishedView
ES Addendum - Chapter 13 Socio-Economic and HealthSupporting DocumentsNot publishedView
ES Addendum - Chapter 14 WasteSupporting DocumentsNot publishedView
ES Addendum - Chapter 15 LightingSupporting DocumentsNot publishedView
ES Addendum - Chapter 16 UtilitiesSupporting DocumentsNot publishedView
ES Addendum - Chapter 8 Built HeritageSupporting DocumentsNot publishedView
ES Addendum - Chapter 9 ArchaeologySupporting DocumentsNot publishedView
ES Addendum - Chapter 10 Hydrology and FloodingSupporting DocumentsNot publishedView
ES Addendum - Chapter 11 EcologySupporting DocumentsNot publishedView
ES Addendum - Chapter 12 Ground Condition and SoilsSupporting DocumentsNot publishedView
ES Addendum - Chapter 5 Noise and VibrationSupporting DocumentsNot publishedView
ES Addendum - Chapter 6 Air QualitySupporting DocumentsNot publishedView
ES Addendum - Chapter 7 Landscape and VisualSupporting DocumentsNot publishedView
ES Addendum - Chapter 3 Policy ContextSupporting DocumentsNot publishedView
ES Addendum - Chapter 4 TransportSupporting DocumentsNot publishedView
ES Addendum - Chapter 2 Proposed DevelopmentSupporting DocumentsNot publishedView
ES Addendum - Chapter 1 IntroductionSupporting DocumentsNot publishedView
Appendix 10.1 - Drainage Strategy 260505 Drainage Strategy (Part 1)Supporting DocumentsNot publishedView
Appendix 10.1 - Drainage Strategy 260505 Drainage Strategy (Part 7)Supporting DocumentsNot publishedView
Appendix 10.1 - Drainage Strategy 260505 Drainage Strategy (Part 8)Supporting DocumentsNot publishedView
NHC Conservation Officer Consultee ResponseConsultee Response PublishedNot publishedView
Anglian Water Constultee Response - Dated 04.02.2026Consultee Response PublishedNot publishedView
Affinity Water Consultee ResponseConsultee Response PublishedNot publishedView
The Ramblers Association (Herts and Middlesex) Consultee ResponseConsultee Response PublishedNot publishedView
Sport England Consultee ResponseConsultee Response PublishedNot publishedView
Herts and Middlesex Wildlife Trust Consultee ResponseConsultee Response PublishedNot publishedView
Active Travel England Consultee ResponseConsultee Response PublishedNot publishedView
Bygrave Parish Council Consultee ResponseConsultee Response PublishedNot publishedView
The British Horse Society Consultee ResponseConsultee Response PublishedNot publishedView
Central Bedfordshire Council Consultee ResponseConsultee Response PublishedNot publishedView
HCC Lead Local Flood Authority Consultee ResponseConsultee Response PublishedNot publishedView
National Highways Consultee ResponseConsultee Response PublishedNot publishedView
Central Bedfordshire Council Consultee ResponseConsultee Response PublishedNot publishedView
Design and Access Statement February 2026 - Part 6Supporting DocumentsNot publishedView
Design and Access Statement February 2026 - Part 5Supporting DocumentsNot publishedView
Design and Access Statement February 2026 - Part 4Supporting DocumentsNot publishedView
Design and Access Statement February 2026 - Part 3Supporting DocumentsNot publishedView
Design and Access Statement February 2026 - Part 2Supporting DocumentsNot publishedView
Design and Access Statement February 2026 - Part 1Supporting DocumentsNot publishedView
ES Addendum - Non Technical SummarySupporting DocumentsNot publishedView
Vol 2 Appendices - Appendix 2.2 Development Specification Revised February 2026 FinalSupporting DocumentsNot publishedView
ES Addendum - Vol 2 Appendices - Appendix 11.1 Ecological Mit PlanSupporting DocumentsNot publishedView
ES Addendum - Chapter 9 ArchaeologySupporting DocumentsNot publishedView
ES Addendum - Vol 2 Appendices - Appendix 1.1 North Herts Council Regulation 25 Request for Further InfoSupporting DocumentsNot publishedView
ES Addendum - Vol 2 Appendices - Appendix 2.1 Rev R - Parameter Plan.Supporting DocumentsNot publishedView
ES Addendum - Vol 2 Appendices - Appendix 9.2 HEMP.Supporting DocumentsNot publishedView
ES Addendum - Vol 2 Appendices - Appendix 9.1 Baldock Draft WSI (1)Supporting DocumentsNot publishedView
ES Addendum - Vol 2 Appendices - Appendix 4.1 Indicative Site Access and Additional CrossingSupporting DocumentsNot publishedView
ES Addendum - Chapter 18 ConclusionSupporting DocumentsNot publishedView
ES Addendum - Chapter 17 Climate ChangeSupporting DocumentsNot publishedView
Growing Baldock - Cover Letter Feb 2026.Supporting DocumentsNot publishedView
Growing Baldock OCEMP - Feb 2026 (1)Supporting DocumentsNot publishedView
Development Specification Revised February 2026 FinalSupporting DocumentsNot publishedView
BMD.21.0045.RP.004.A Baldock Green Infrastructure StrategySupporting DocumentsNot publishedView
ES Addendum - Chapter 14 WasteSupporting DocumentsNot publishedView
ES Addendum - Chapter 15 Lighting.Supporting DocumentsNot publishedView
ES Addendum - Chapter 16 UtilitiesSupporting DocumentsNot publishedView
ES Addendum - Chapter 12 Ground Condition and SoilsSupporting DocumentsNot publishedView
ES Addendum - Chapter 10 Flooding and Hydrology.Supporting DocumentsNot publishedView
ES Addendum - Chapter 11 EcologySupporting DocumentsNot publishedView
ES Addendum - Chapter 13 Socio-Economic and HealthSupporting DocumentsNot publishedView
ES Addendum - Chapter 8 Built HeritageSupporting DocumentsNot publishedView
ES Addendum - Chapter 7 Landscape and VisualSupporting DocumentsNot publishedView
ES Addendum - Chapter 6 Air Quality.Supporting DocumentsNot publishedView
ES Addendum - Chapter 5 Noise and VibrationSupporting DocumentsNot publishedView
ES Addendum - Chapter 4 TransportSupporting DocumentsNot publishedView
ES Addendum - Chapter 3 Policy Context.Supporting DocumentsNot publishedView
ES Addendum - Chapter 2 Proposed DevelopmentSupporting DocumentsNot publishedView
ES Addendum - Chapter 1 IntroductionSupporting DocumentsNot publishedView
Application Plans - Feb 2026 (2 of 2) - PC7029-ITP-CE-GB-DR-D-0150 Rev P02 - site access North RoadSupporting DocumentsNot publishedView
Application Plans - Feb 2026 (1 of 2) - UAC092-002 Rev 2 Parameter PlanSupporting DocumentsNot publishedView
Response from BMD re points raised by Hertfordshire Wildlife TrustSupporting DocumentsNot publishedView
Hertfordshire and West Essex Integrated Care Board Consultee ResponseConsultee Response PublishedNot publishedView
Hertfordshire Constabulary Consultee Response (Attachment 2)Consultee Response PublishedNot publishedView
Hertfordshire Constabulary Consultee Response (Attachment 1)Consultee Response PublishedNot publishedView
Architectural Liaison Officer (Police) Hertfordshire Constabulary Consultee ResponseConsultee Response PublishedNot publishedView
HCC Highways ResponseConsultee Response PublishedNot publishedView
National Highways Consultee ResponseConsultee Response PublishedNot publishedView
Ian Hall On Behalf Of The RevIvel Association 5 Grosvenor Road BaldockNeighbour Representations publishedNot publishedView
Ashwell Parish Council Consultee ResponseConsultee Response PublishedNot publishedView
HCC Growth and Infrastructure Consultee Response dated 28.11.2025Consultee Response PublishedNot publishedView
Bygrave Parish Council Consultee Response (Attachment 1)Consultee Response PublishedNot publishedView
Bygrave Parish Council Consultee Response (Attachment 2)Consultee Response PublishedNot publishedView
HCC Lead Local Flood Authority Consultee ResponseConsultee Response PublishedNot publishedView
HCC Public Heath Consultee ResponseConsultee Response PublishedNot publishedView
HCC Adult Care ServicesConsultee Response PublishedNot publishedView
Anglian Water Consultee ResponseConsultee Response PublishedNot publishedView
NHC Environmental Health Combined (Contaminated Land, Noise and Air) Consultee ResponseConsultee Response PublishedNot publishedView
Herts and Middlesex Wildlife Trust Consultee ResponseConsultee Response PublishedNot publishedView
Nikki Da Costa 126 Ashwell Street Ashwell Baldock (Attachment 1)Neighbour Representations publishedNot publishedView
Nikki Da Costa 126 Ashwell Street Ashwell Baldock (Attachment 2)Neighbour Representations publishedNot publishedView
Mark Rowland 11 Walnut Avenue BaldockNeighbour Representations publishedNot publishedView
R B Rota 45 Wynn Close Baldock (Attachment 1)Neighbour Representations publishedNot publishedView
R B Rota 45 Wynn Close Baldock (Attachment 2)Neighbour Representations publishedNot publishedView
Network Rail Consultee Response (Attachment 1)Consultee Response PublishedNot publishedView
Network Rail Consultee Response (Attachment 2)Consultee Response PublishedNot publishedView
Network Rail Consultee Response (Attachment 3)Consultee Response PublishedNot publishedView
The British Horse Society Consultee ResponseConsultee Response PublishedNot publishedView
The Ramblers Association (Herts And Middlesex) Consultee ResponseConsultee Response PublishedNot publishedView
Active Travel England Consultee ResponseConsultee Response PublishedNot publishedView
Environmental Agency Consultee ResponseConsultee Response PublishedNot publishedView
Sport England Consultee Response (Attachment 1)Consultee Response PublishedNot publishedView
Sport England Consultee Response (Attachment 2)Consultee Response PublishedNot publishedView
HCC Archaeological Consultee ResponseConsultee Response PublishedNot publishedView
Natural England Consultee ResponseConsultee Response PublishedNot publishedView
HCC Minerals and Waste Consultee ResponseConsultee Response PublishedNot publishedView
British Horse Society Consultee ResponseConsultee Response PublishedNot publishedView
Historic England Consultee ResponseConsultee Response PublishedNot publishedView
Mrs Mary Ball 28 Chauncy Gardens BaldockNeighbour Representations publishedNot publishedView
Joel Butt Still House Radwell Lane BaldockNeighbour Representations publishedNot publishedView
Site NoticeSite NoticeNot publishedView
Environment Agency Consultation ChecklistSupporting DocumentsNot publishedView
BNG Metric (PFD version)Supporting DocumentsNot publishedView
ES Appendix 12.2 - GI Interpretive Report BA1 Area Part 1 - REDACTEDSupporting DocumentsNot publishedView
ES Appendix 12.2 - GI Interpretive Report BA1 Area Part 2 - REDACTEDSupporting DocumentsNot publishedView
ES Appendix 12.5 - GI Interpretive Report BA10 Area Part 1 - REDACTEDSupporting DocumentsNot publishedView
ES Appendix 12.5 - GI Interpretive Report BA10 Area Part 2 - REDACTEDSupporting DocumentsNot publishedView
ES Appendix 12.8 - Roads 2 and 3 and Ped Bridge Part 2 - REDACTEDSupporting DocumentsNot publishedView
ES Chapter 18 ConclusionsSupporting DocumentsNot publishedView
ES Chapter 17 Climate ChangeSupporting DocumentsNot publishedView
ES Chapter 16 Utilities and ServicesSupporting DocumentsNot publishedView
ES Chapter 15 LightingSupporting DocumentsNot publishedView
ES Chapter 14 WasteSupporting DocumentsNot publishedView
ES Chapter 13 Socio-Economic and HealthSupporting DocumentsNot publishedView
ES Chapter 12 Ground Conditions and SoilsSupporting DocumentsNot publishedView
ES Chapter 11 EcologySupporting DocumentsNot publishedView
ES Chapter 10 Hydrology and FloodingSupporting DocumentsNot publishedView
ES Chapter 9 ArchaeologySupporting DocumentsNot publishedView
ES Chapter 8 Built HeritageSupporting DocumentsNot publishedView
ES Chapter 7 Landscape and VisualSupporting DocumentsNot publishedView
ES Chapter 6 Air QualitySupporting DocumentsNot publishedView
ES Chapter 5 Noise and VibrationSupporting DocumentsNot publishedView
ES Chapter 4 TransportSupporting DocumentsNot publishedView
ES Chapter 3 Policy ContextSupporting DocumentsNot publishedView
ES Chapter 2 Proposed DevelopmentSupporting DocumentsNot publishedView
ES Chapter 1 IntroductionSupporting DocumentsNot publishedView
Sustainability and Energy StrategySupporting DocumentsNot publishedView
Statement of Community Involvement Part 2Supporting DocumentsNot publishedView
Statement of Community Involvement Part 1Supporting DocumentsNot publishedView
Planning StatementSupporting DocumentsNot publishedView
Outline Construction Environmental Management PlanSupporting DocumentsNot publishedView
Employment StrategySupporting DocumentsNot publishedView
Ecological Mitigation PlanSupporting DocumentsNot publishedView
BNG MetricSupporting DocumentsNot publishedView
BNG AssessmentSupporting DocumentsNot publishedView
Arboricultural Planning Report Part 3Supporting DocumentsNot publishedView
Arboricultural Planning Report Part 2Supporting DocumentsNot publishedView
Arboricultural Planning Report Part 1Supporting DocumentsNot publishedView
ES Non-Technical SummarySupporting DocumentsNot publishedView
Covering Letter - RedactedSupporting DocumentsNot publishedView
Application FormApplication FormsNot publishedView
ES Appendix 16.5 - Virgin Media Asset RecordsSupporting DocumentsNot publishedView
ES Appendix 16.4 - Openreach Asset RecordsSupporting DocumentsNot publishedView
ES Appendix 16.3 - UK Power Networks Asset Records Part 8Supporting DocumentsNot publishedView
ES Appendix 16.3 - UK Power Networks Asset Records Part 7Supporting DocumentsNot publishedView
ES Appendix 16.3 - UK Power Networks Asset Records Part 6Supporting DocumentsNot publishedView
ES Appendix 16.3 - UK Power Networks Asset Records Part 5Supporting DocumentsNot publishedView
ES Appendix 16.3 - UK Power Networks Asset Records Part 4Supporting DocumentsNot publishedView
ES Appendix 16.3 - UK Power Networks Asset Records Part 3Supporting DocumentsNot publishedView
ES Appendix 16.3 - UK Power Networks Asset Records Part 2Supporting DocumentsNot publishedView
ES Appendix 16.3 - UK Power Networks Asset Records Part 1Supporting DocumentsNot publishedView
ES Appendix 16.2 - Cadent Gas Asset Records Part 3Supporting DocumentsNot publishedView
ES Appendix 16.2 - Cadent Gas Asset Records Part 2Supporting DocumentsNot publishedView
ES Appendix 16.2 - Cadent Gas Asset Records Part 1Supporting DocumentsNot publishedView
ES Appendix 16.1 - Affinity Water Asset RecordsSupporting DocumentsNot publishedView
ES Appendix 15.2 - Viewpoint PhotographsSupporting DocumentsNot publishedView
ES Appendix 15.1 - ViewpointsSupporting DocumentsNot publishedView
ES Appendix 13.4 - Summary of Sports Facilities and Capacity in North Hertfordshire 2015Supporting DocumentsNot publishedView
ES Appendix 13.3 - NHC Definition of Primary Purpose of Open SpacesSupporting DocumentsNot publishedView
ES Appendix 13.2 - Map of Secondary School Priority AreasSupporting DocumentsNot publishedView
ES Appendix 11.9 - Figure 1 Designated Sites PlanSupporting DocumentsNot publishedView
ES Appendix 11.8 - Eco Assessment-Phase 2 Further Ecological Appraisal RedactedSupporting DocumentsNot publishedView
ES Appendix 11.7 - Ecological Mitigation PlanSupporting DocumentsNot publishedView
ES Appendix 11.6 - Corn Bunting Mitigation Sites AssessmentSupporting DocumentsNot publishedView
ES Appendix 11.5 - Verification of Habitat Condition and Botanical InterestSupporting DocumentsNot publishedView
ES Appendix 11.4 - Nocturnal Bat Survey ReportSupporting DocumentsNot publishedView
ES Appendix 11.3 - Ecology Headlines Technical NoteSupporting DocumentsNot publishedView
ES Appendix 11.2 - Phase 2 Ecological Assessment RedactedSupporting DocumentsNot publishedView
ES Appendix 11.1 - Preliminary Ecological Appraisal RedactedSupporting DocumentsNot publishedView
ES Appendix 10.2 - Drainage Strategy Part 8Supporting DocumentsNot publishedView
ES Appendix 10.2 - Drainage Strategy Part 7Supporting DocumentsNot publishedView
ES Appendix 10.2 - Drainage Strategy Part 6Supporting DocumentsNot publishedView
ES Appendix 10.2 - Drainage Strategy Part 5Supporting DocumentsNot publishedView
ES Appendix 10.2 - Drainage Strategy Part 4Supporting DocumentsNot publishedView
ES Appendix 10.2 - Drainage Strategy Part 3Supporting DocumentsNot publishedView
ES Appendix 10.2 - Drainage Strategy Part 2Supporting DocumentsNot publishedView
ES Appendix 10.2 - Drainage Strategy Part 1Supporting DocumentsNot publishedView
ES Appendix 10.1 - Flood Risk Assessment Part 11Supporting DocumentsNot publishedView
ES Appendix 10.1 - Flood Risk Assessment Part 10Supporting DocumentsNot publishedView
ES Appendix 10.1 - Flood Risk Assessment Part 9Supporting DocumentsNot publishedView
ES Appendix 10.1 - Flood Risk Assessment Part 8Supporting DocumentsNot publishedView
ES Appendix 10.1 - Flood Risk Assessment Part 7Supporting DocumentsNot publishedView
ES Appendix 10.1 - Flood Risk Assessment Part 6Supporting DocumentsNot publishedView
ES Appendix 10.1 - Flood Risk Assessment Part 5Supporting DocumentsNot publishedView
ES Appendix 10.1 - Flood Risk Assessment Part 4Supporting DocumentsNot publishedView
ES Appendix 10.1 - Flood Risk Assessment Part 3Supporting DocumentsNot publishedView
ES Appendix 10.1 - Flood Risk Assessment Part 2Supporting DocumentsNot publishedView
ES Appendix 10.1 - Flood Risk Assessment Part 1Supporting DocumentsNot publishedView
ES Appendix 9.4 - Archaeological Investigation Zone 5Supporting DocumentsNot publishedView
ES Appendix 9.3 - Archaeological Evaluation Zones 1-4 Part 2Supporting DocumentsNot publishedView
ES Appendix 9.3 - Archaeological Evaluation Zones 1-4 Part 1Supporting DocumentsNot publishedView
ES Appendix 9.2 - Archaeological Evaluation Phase 1 Part 3Supporting DocumentsNot publishedView
ES Appendix 9.2 - Archaeological Evaluation Phase 1 Part 2Supporting DocumentsNot publishedView
ES Appendix 9.2 - Archaeological Evaluation Phase 1 Part 1Supporting DocumentsNot publishedView
ES Appendix 9.1 - Desk Based AssessmentSupporting DocumentsNot publishedView
ES Appendix 9.1 - Desk Based Assessment Figures and PlatesSupporting DocumentsNot publishedView
ES Appendix 8.1 - Heritage Impact AssessmentSupporting DocumentsNot publishedView
ES Appendix 7.9 - Schedule of Likely Visual EffectsSupporting DocumentsNot publishedView
ES Appendix 7.8 - Schedule of Likely Landscape EffectsSupporting DocumentsNot publishedView
ES Appendix 7.7 - AVR Viewpoint WirelinesSupporting DocumentsNot publishedView
ES Appendix 7.6 - Viewpoint Photographs - Summer.Supporting DocumentsNot publishedView
ES Appendix 7.5 - Viewpoint Photographs - WinterSupporting DocumentsNot publishedView
ES Appendix 7.4 - LVIA Supporting FiguresSupporting DocumentsNot publishedView
ES Appendix 7.3 - LVIA Planning Policy and GuidanceSupporting DocumentsNot publishedView
ES Appendix 7.2 - LVIA MethodologySupporting DocumentsNot publishedView
ES Appendix 7.1 - LVIA Glossary of TermsSupporting DocumentsNot publishedView
ES Appendix 6.6 - Assessment of Impacts on Ecological SitesSupporting DocumentsNot publishedView
ES Appendix 6.5 - Damage Cost CalculationsSupporting DocumentsNot publishedView
ES Appendix 6.4 - Model VerificationSupporting DocumentsNot publishedView
ES Appendix 6.3 - Diffusion Survey DataSupporting DocumentsNot publishedView
ES Appendix 6.2 - Detailed Construction Dust Assessment MethodologySupporting DocumentsNot publishedView
ES Appendix 6.1 - FiguresSupporting DocumentsNot publishedView
ES Appendix 5.5 - Supporting Figures Part 3Supporting DocumentsNot publishedView
ES Appendix 5.5 - Supporting Figures Part 2Supporting DocumentsNot publishedView
ES Appendix 5.5 - Supporting Figures Part 1Supporting DocumentsNot publishedView
ES Appendix 5.4 - Noise Impact AssessmentSupporting DocumentsNot publishedView
ES Appendix 5.3 - Supporting DataSupporting DocumentsNot publishedView
ES Appendix 5.2 - Baseline Noise Data and Detailed MethodologySupporting DocumentsNot publishedView
ES Appendix 5.1 - Policy and GuidanceSupporting DocumentsNot publishedView
ES Appendix 4.7 - Figure 4.2Supporting DocumentsNot publishedView
ES Appendix 4.6 - 2040 Forecast Baseline and Post-Completion FlowsSupporting DocumentsNot publishedView
ES Appendix 4.5 - Construction InformationSupporting DocumentsNot publishedView
ES Appendix 4.4 - 2033 Forecast Baseline and Peak Construction FlowsSupporting DocumentsNot publishedView
ES Appendix 4.3 - 2025 Existing Baseline FlowsSupporting DocumentsNot publishedView
ES Appendix 4.1 - Transport AssessmentSupporting DocumentsNot publishedView
ES Appendix 4.1 - Transport Assessment Appendices Part 15Supporting DocumentsNot publishedView
ES Appendix 4.1 - Transport Assessment Appendices Part 14Supporting DocumentsNot publishedView
ES Appendix 4.1 - Transport Assessment Appendices Part 13Supporting DocumentsNot publishedView
ES Appendix 4.1 - Transport Assessment Appendices Part 12Supporting DocumentsNot publishedView
ES Appendix 4.1 - Transport Assessment Appendices Part 11Supporting DocumentsNot publishedView
ES Appendix 4.1 - Transport Assessment Appendices Part 10Supporting DocumentsNot publishedView
ES Appendix 4.1 - Transport Assessment Appendices Part 9Supporting DocumentsNot publishedView
ES Appendix 4.1 - Transport Assessment Appendices Part 8Supporting DocumentsNot publishedView
ES Appendix 4.1 - Transport Assessment Appendices Part 7Supporting DocumentsNot publishedView
ES Appendix 4.1 - Transport Assessment Appendices Part 6Supporting DocumentsNot publishedView
ES Appendix 4.1 - Transport Assessment Appendices Part 5Supporting DocumentsNot publishedView
ES Appendix 4.1 - Transport Assessment Appendices Part 4Supporting DocumentsNot publishedView
ES Appendix 4.1 - Transport Assessment Appendices Part 3Supporting DocumentsNot publishedView
ES Appendix 4.1 - Transport Assessment Appendices Part 2Supporting DocumentsNot publishedView
ES Appendix 4.1 - Transport Assessment Appendices Part 1Supporting DocumentsNot publishedView
ES Appendix 2.3 - Cumulative Sites PlanSupporting DocumentsNot publishedView
ES Appendix 2.1 - Parameter PlanSupporting DocumentsNot publishedView
ES Appendix 1.3 - NHC Scoping OpinionSupporting DocumentsNot publishedView
ES Appendix 1.2 - Technical CompetenciesSupporting DocumentsNot publishedView
ES Appendix 1.1 - Site Boundary PlanSupporting DocumentsNot publishedView
ES Appendix 12.8 - Roads 2 and 3 and Ped Bridge Part 1 - REDACTEDSupporting DocumentsNot publishedView
ES Appendix 12.7 - Technical Doc Multi Modal Bridge - REDACTEDSupporting DocumentsNot publishedView
ES Appendix 12.6 - Technical Documentation Road and Bridge – Option 1Supporting DocumentsNot publishedView
ES Appendix 12.4 - GI Interpretive Report BA3 Area - REDACTEDSupporting DocumentsNot publishedView
ES Appendix 12.3 - GI Interpretive Report BA2 Area - REDACTED.Supporting DocumentsNot publishedView
ES Appendix 12.1 - Preliminary Risk Assessment Part 3Supporting DocumentsNot publishedView
ES Appendix 12.1 - Preliminary Risk Assessment Part 2Supporting DocumentsNot publishedView
ES Appendix 12.1 - Preliminary Risk Assessment Part 1Supporting DocumentsNot publishedView
Parameter Plan - UAC092-002-RevQ.PlansNot publishedView
Outline Planning Application Boundary - UAC092-001-RevFPlansNot publishedView
Development Site Accesses North Road - PC7029-ITP-CE-GB-DR-D-0150-P01PlansNot publishedView
Development Site Access Royston Road and A505 - PC7029-ITP-CE-GB-DR-D-0151-P02PlansNot publishedView
Development Site Access Clothall Road - PC7029-ITP-CE-GB-DR-D-0152-P02PlansNot publishedView
SUPERSEDED ES Appendix 4.2 - Framework Travel PlanSuperseded Plans - Published to WebNot publishedView
Superseded Design and Access Statement Part 9Superseded Plans - Published to WebNot publishedView
Superseded Design and Access Statement Part 10Superseded Plans - Published to WebNot publishedView
Superseded Design and Access Statement Part 11Superseded Plans - Published to WebNot publishedView
Superseded Design and Access Statement Part 4Superseded Plans - Published to WebNot publishedView
Superseded Design and Access Statement Part 5Superseded Plans - Published to WebNot publishedView
Superseded Design and Access Statement Part 6Superseded Plans - Published to WebNot publishedView
Superseded Design and Access Statement Part 7Superseded Plans - Published to WebNot publishedView
Superseded Design and Access Statement Part 8Superseded Plans - Published to WebNot publishedView
Superseded Design and Access Statement Part 1Superseded Plans - Published to WebNot publishedView
Superseded Design and Access Statement Part 2Superseded Plans - Published to WebNot publishedView
Superseded Design and Access Statement Part 3Superseded Plans - Published to WebNot publishedView
Duplicate ES Appendix 12.1 - Preliminary Risk Assessment Part 4Supporting DocumentsNot publishedView
ES Appendix 13.1 – Community and Social Facilities PlanSupporting DocumentsNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Environmental Impact Assessment Received

    Published milestoneCouncil source
  3. Application Validated Date

    Published milestoneCouncil source
  4. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Actual Committee Date

    Scheduled

    Future date published by the council.

    Council source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.