Council planning record

Submission of details pertaining to pre-commencement conditions relating to erection of a high voltage cable manufacturing facility

Former Coal Terminal Hunterston West Kilbride Ayrshire

Approved subject to ConditionsReference: 22/00712/MSCMNorth Ayrshire

Last published check: 27 Sept 2026, 21:04. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Advertised In Press Date

    Published milestoneCouncil source
  4. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Standard Consultation Date

    Published milestoneCouncil source
  6. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Actual Committee Date

    Published milestoneCouncil source
  9. Decision Made Date

    Published milestoneCouncil source
  10. Decision Issued Date

    Published milestoneCouncil source
  11. Permission Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Approved subject to Conditions
Application type
Matters Specified in Conditions (Major)
Received
20 Sept 2022
Validated
25 Oct 2022
Determination deadline
25 Dec 2022
Local authority
North Ayrshire

Application overview

Submission of details pertaining to pre-commencement conditions relating to erection of a high voltage cable manufacturing facility

Proposal details

Reference
22/00712/MSCM
Alternative references
100594688-001
Ward
North Coast
Agent
RPS Group Fao Jim Bailey

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Former Coal Terminal Hunterston West Kilbride Ayrshire

This record has no verified map location.

View council map

Documents 173 of 173

DocumentPublishedAction
Decision noticeDecision · PDF9 Jun 2023View
Surface water drainage sheet 7Approved Drawing · PDF9 May 2023View
Surface water drainage sheet 4Approved Drawing · PDF9 May 2023View
Surface water drainage sheet 1Approved Drawing · PDF9 May 2023View
Revised environmental health responseConsultation Response · PDF14 Apr 2023View
Drainage strategy reportReport · PDF3 Apr 2023View
Acoustic assessmentReport · PDF3 Apr 2023View
Cable pathway - typical detailsApproved Drawing · PDF21 Mar 2023View
Cable pathway - key planApproved Drawing · PDF21 Mar 2023View
Hunterston quay layout - no vesselApproved Drawing · PDF21 Mar 2023View
Grosvenor consultancy for fairlie ccConsultation Response · PDF10 Feb 2023View
Additional fairlie cc responseOther · PDF3 Feb 2023View
Further cumbrae cc responseConsultation Response · PDF29 Jan 2023View
Environmental health responseConsultation Response · PDF10 Jan 2023View
Tr/npa/2Consultation Response · PDF4 Jan 2023View
Fairlie cc responseConsultation Response · PDF4 Jan 2023View
Network rail responseConsultation Response · PDF22 Dec 2022View
Traffic management planReport · PDF15 Dec 2022View
CommentsObjection Comment · PDF1 Dec 2022View
Transport scotland responseConsultation Response · PDF29 Nov 2022View
Flooding responseConsultation Response · PDF29 Nov 2022View
CommentsObjection Comment · PDF28 Nov 2022View
CommentsObjection Comment · PDF23 Nov 2022View
Cumbrae cc responseConsultation Response · PDF21 Nov 2022View
Trnpa1Other · PDF14 Nov 2022View
Roads responseConsultation Response · PDF1 Nov 2022View
Trnpa1BackGround Papers · PDF25 Oct 2022View
Noise reportReport · PDF13 Oct 2022View
MasterplanApproved Drawing · PDF10 Oct 2022View
Masterplan location planApproved Drawing · PDF10 Oct 2022View
Overview of possible renewable energy sources for xlcc hunterstonReport · PDF10 Oct 2022View
Condition 3Report · PDF22 Sept 2022View
Illustrative masterplanApproved Drawing · PDF22 Sept 2022View
Master plan manufacturing processApproved Drawing · PDF22 Sept 2022View
Master plan servicing strategyApproved Drawing · PDF22 Sept 2022View
Master plan staff access strategyApproved Drawing · PDF22 Sept 2022View
Master plan emergency access strategyApproved Drawing · PDF22 Sept 2022View
Master plan outline security strategyApproved Drawing · PDF22 Sept 2022View
Master plan waste managementApproved Drawing · PDF22 Sept 2022View
External lighting layout indicative sheet 2 of 2Approved Drawing · PDF22 Sept 2022View
External lighting layout indicative sheet 1 of 2Approved Drawing · PDF22 Sept 2022View
Stage 3 comprehensive landscape masterplanApproved Drawing · PDF22 Sept 2022View
Stage 3 soft landscape proposals sheet 01Approved Drawing · PDF22 Sept 2022View
Stage 3 soft landscape proposals sheet 02Approved Drawing · PDF22 Sept 2022View
Stage 3 soft landscape proposals sheet 03Approved Drawing · PDF22 Sept 2022View
Stage 3 soft landscape proposals sheet 04Approved Drawing · PDF22 Sept 2022View
Stage 3 soft landscape proposals sheet 05Approved Drawing · PDF22 Sept 2022View
Stage 3 soft landscape proposals sheet 06Approved Drawing · PDF22 Sept 2022View
Typical tree pit detailsApproved Drawing · PDF22 Sept 2022View
Stage 3 schedule of soft landscape componentsReport · PDF22 Sept 2022View
Plan-ga-00(ground) - main factory - full building.Approved Drawing · PDF22 Sept 2022View
Proposed elevations - main factoryApproved Drawing · PDF22 Sept 2022View
Elevations as proposed (tower) - main factoryApproved Drawing · PDF22 Sept 2022View
Proposed elevations (tower)Approved Drawing · PDF22 Sept 2022View
Level b1 ga plan (tower)Approved Drawing · PDF22 Sept 2022View
Level 26 ga plan (tower)Approved Drawing · PDF22 Sept 2022View
Level 22 ga plan (tower)Approved Drawing · PDF22 Sept 2022View
Level 21 ga plan (tower)Approved Drawing · PDF22 Sept 2022View
Level 00 ga plan (tower)Approved Drawing · PDF22 Sept 2022View
Full building proposed elevations (conductor manufacture)Approved Drawing · PDF22 Sept 2022View
Proposed south & west elevations (conductor manufacture)Approved Drawing · PDF22 Sept 2022View
Proposed north & east elevations (conductor manufacture)Approved Drawing · PDF22 Sept 2022View
Full building ga plans (conductor manufacture)Approved Drawing · PDF22 Sept 2022View
Proposed ga plan - roof (c4) (conductor manufacture)Approved Drawing · PDF22 Sept 2022View
Proposed ga plan - mezzanine (c4) (conductor manufacture)Approved Drawing · PDF22 Sept 2022View
Proposed ga plan - ground floor (c4) (conductor manufacture)Approved Drawing · PDF22 Sept 2022View
Proposed ga plan - roof (c3) (conductor manufacture)Approved Drawing · PDF22 Sept 2022View
Proposed ga plan - mezzanine (c3) (conductor manufacture)Approved Drawing · PDF22 Sept 2022View
Proposed ga plan - ground floor (c3) (conductor manufacture)Approved Drawing · PDF22 Sept 2022View
Proposed ga plan - roof (c2 (conductor manufacture)Approved Drawing · PDF22 Sept 2022View
Proposed ga plan - mezzanine (c2) (conductor manufacture)Approved Drawing · PDF22 Sept 2022View
Proposed ga plan - ground floor (c2) (conductor manufacture)Approved Drawing · PDF22 Sept 2022View
Proposed ga plan - roof (c1) (conductor manufacture)Approved Drawing · PDF22 Sept 2022View
Proposed ga plan - mezzanine (c1) (conductor manufacture)Approved Drawing · PDF22 Sept 2022View
Proposed ga plan - ground floor (c1) (conductor manufacture)Approved Drawing · PDF22 Sept 2022View
Canteen proposed elevationsApproved Drawing · PDF22 Sept 2022View
Canteen proposed floor planApproved Drawing · PDF22 Sept 2022View
Cable rewinding ground floor planApproved Drawing · PDF22 Sept 2022View
Cable rewinding elevationsApproved Drawing · PDF22 Sept 2022View
Pq testing elevationsApproved Drawing · PDF22 Sept 2022View
Pq testing floor plansApproved Drawing · PDF22 Sept 2022View
Full building ga plans (factory joints)Approved Drawing · PDF22 Sept 2022View
Full building proposed elevations (factory joints)Approved Drawing · PDF22 Sept 2022View
General arrangement - gatehouse (office)Approved Drawing · PDF22 Sept 2022View
Elevations (office)Approved Drawing · PDF22 Sept 2022View
Proposed plans (office)Approved Drawing · PDF22 Sept 2022View
Proposed ground floor plan (utilities)Approved Drawing · PDF22 Sept 2022View
Proposed elevations (utilities)Approved Drawing · PDF22 Sept 2022View
Kerbing, signs and lines sheet 9Approved Drawing · PDF22 Sept 2022View
Kerbing, signs and lines sheet 8Approved Drawing · PDF22 Sept 2022View
Kerbing, signs and lines sheet 7Approved Drawing · PDF22 Sept 2022View
Kerbing, signs and lines sheet 6Approved Drawing · PDF22 Sept 2022View
Kerbing, signs and lines sheet 5Approved Drawing · PDF22 Sept 2022View
Kerbing, signs and lines sheet 4Approved Drawing · PDF22 Sept 2022View
Kerbing, signs and lines sheet 3Approved Drawing · PDF22 Sept 2022View
Kerbing, signs and lines sheet 2Approved Drawing · PDF22 Sept 2022View
Kerbing, signs and lines sheet 1Approved Drawing · PDF22 Sept 2022View
General arrangement and joint layout sheet 9Approved Drawing · PDF22 Sept 2022View
General arrangement and joint layout sheet 8Approved Drawing · PDF22 Sept 2022View
General arrangement and joint layout sheet 7Approved Drawing · PDF22 Sept 2022View
General arrangement and joint layout sheet 6Approved Drawing · PDF22 Sept 2022View
General arrangement and joint layout sheet 5Approved Drawing · PDF22 Sept 2022View
General arrangement and joint layout sheet 4Approved Drawing · PDF22 Sept 2022View
General arrangement and joint layout sheet 3Approved Drawing · PDF22 Sept 2022View
General arrangement and joint layout sheet 2Approved Drawing · PDF22 Sept 2022View
General arrangement and joint layout sheet 1Approved Drawing · PDF22 Sept 2022View
Management and maintenanceReport · PDF22 Sept 2022View
Drainage strategy reportReport · PDF22 Sept 2022View
Proposed finished floor levelsReport · PDF22 Sept 2022View
Construction details sheet 14Approved Drawing · PDF22 Sept 2022View
Construction details sheet 13Approved Drawing · PDF22 Sept 2022View
Construction details sheet 12Approved Drawing · PDF22 Sept 2022View
Construction details sheet 11Approved Drawing · PDF22 Sept 2022View
Construction details sheet 10Approved Drawing · PDF22 Sept 2022View
Construction details sheet 9Approved Drawing · PDF22 Sept 2022View
Construction details sheet 8Approved Drawing · PDF22 Sept 2022View
Construction details sheet 7Approved Drawing · PDF22 Sept 2022View
Construction details sheet 6Approved Drawing · PDF22 Sept 2022View
Construction details sheet 5Approved Drawing · PDF22 Sept 2022View
Construction details sheet 4Approved Drawing · PDF22 Sept 2022View
Construction details sheet 3Approved Drawing · PDF22 Sept 2022View
Construction details sheet 2Approved Drawing · PDF22 Sept 2022View
Construction details sheet 1Approved Drawing · PDF22 Sept 2022View
Pavement construction sheet 9Approved Drawing · PDF22 Sept 2022View
Pavement construction sheet 8Approved Drawing · PDF22 Sept 2022View
Pavement construction sheet 7Approved Drawing · PDF22 Sept 2022View
Pavement construction sheet 6Approved Drawing · PDF22 Sept 2022View
Pavement construction sheet 5Approved Drawing · PDF22 Sept 2022View
Pavement construction sheet 4Approved Drawing · PDF22 Sept 2022View
Pavement construction sheet 3Approved Drawing · PDF22 Sept 2022View
Pavement construction sheet 2Approved Drawing · PDF22 Sept 2022View
Pavement construction sheet 1Approved Drawing · PDF22 Sept 2022View
Cut and fillApproved Drawing · PDF22 Sept 2022View
Contours and levels sheet 9Approved Drawing · PDF22 Sept 2022View
Contours and levels sheet 8Approved Drawing · PDF22 Sept 2022View
Contours and levels sheet 7Approved Drawing · PDF22 Sept 2022View
Contours and levels sheet 6Approved Drawing · PDF22 Sept 2022View
Contours and levels sheet 5Approved Drawing · PDF22 Sept 2022View
Contours and levels sheet 4Approved Drawing · PDF22 Sept 2022View
Contours and levels sheet 3Approved Drawing · PDF22 Sept 2022View
Contours and levels sheet 2Approved Drawing · PDF22 Sept 2022View
Contours and levels sheet 1Approved Drawing · PDF22 Sept 2022View
Surface water drainage overland flow routesApproved Drawing · PDF22 Sept 2022View
Surface water drainage contribution areasApproved Drawing · PDF22 Sept 2022View
Foul and surface water drainage overlayApproved Drawing · PDF22 Sept 2022View
Foul water drainage outfallApproved Drawing · PDF22 Sept 2022View
Foul water drainage sheet 9Approved Drawing · PDF22 Sept 2022View
Foul water drainage sheet 8Approved Drawing · PDF22 Sept 2022View
Foul water drainage sheet 7Approved Drawing · PDF22 Sept 2022View
Foul water drainage sheet 6Approved Drawing · PDF22 Sept 2022View
Foul water drainage sheet 5Approved Drawing · PDF22 Sept 2022View
Foul water drainage sheet 4Approved Drawing · PDF22 Sept 2022View
Foul water drainage sheet 3Approved Drawing · PDF22 Sept 2022View
Foul water drainage sheet 2Approved Drawing · PDF22 Sept 2022View
Foul water drainage sheet 1Approved Drawing · PDF22 Sept 2022View
Surface water drainage outfallApproved Drawing · PDF22 Sept 2022View
Surface water drainage sheet 9Approved Drawing · PDF22 Sept 2022View
Surface water drainage sheet 8Approved Drawing · PDF22 Sept 2022View
Surface water drainage sheet 7Approved Drawing · PDF22 Sept 2022View
Surface water drainage sheet 6Approved Drawing · PDF22 Sept 2022View
Surface water drainage sheet 5Approved Drawing · PDF22 Sept 2022View
Surface water drainage sheet 4Approved Drawing · PDF22 Sept 2022View
Surface water drainage sheet 3Approved Drawing · PDF22 Sept 2022View
Surface water drainage sheet 2Approved Drawing · PDF22 Sept 2022View
Surface water drainage sheet 1Approved Drawing · PDF22 Sept 2022View
Loading dock general arrangement and sectionsApproved Drawing · PDF22 Sept 2022View
Construction environmental management planReport · PDF21 Sept 2022View
Ecological clerk of works statementReport · PDF20 Sept 2022View
Application fees pdfFees PDF · PDF20 Sept 2022View
Habitat survey of factory siteReport · PDF20 Sept 2022View
Location planApproved Drawing · PDF20 Sept 2022View
Application for matters specified in conditionsApplication Form · PDF20 Sept 2022View
Tp for factory at operational stageReport · PDF20 Sept 2022View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approved subject to Conditions
Decision notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.