Council planning record

Retrospective permission for the retention of buildings and structures relating to the existing waste activities on the site including the retention of 1) a green waste storage bay, leachate chamber and vent 2) concrete loading bay and detachable railings 3) porta-loo 4) storage shed 5) diesel tank ...

Waste Transfer Station, Pump Lane, Caister-on-Sea NR30 5BE

Application ApprovedReference: C/6/2011/6004Norfolk County Council

Last published check: 21 Sept 2026, 17:35. Check the council record for more recent changes.

Application location

Waste Transfer Station, Pump Lane, Caister-on-Sea NR30 5BE

This record has no verified map location.

Application summary

Status
Application Approved
Application type
Full
Received
Not published
Validated
6 Jun 2011
Determination deadline
Not published
Local authority
Norfolk County Council

Application overview

Retrospective permission for the retention of buildings and structures relating to the existing waste activities on the site including the retention of 1) a green waste storage bay, leachate chamber and vent 2) concrete loading bay and detachable railings 3) porta-loo 4) storage shed 5) diesel tank ...

Proposal details

Reference
C/6/2011/6004

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 13 of 13

DocumentPublishedAction
ApplicationFormNoPersonalData.pdf-9 Jun 2011View
Caister Green Waste Bay Elevations.pdf-9 Jun 2011View
Caister Transfer Station Elevations Rev A (A1).pdf-9 Jun 2011View
Design and Access Statement V5.pdf-9 Jun 2011View
FRA.pdf-9 Jun 2011View
Local Requirements List.doc-9 Jun 2011View
Location Plan A3.pdf-9 Jun 2011View
Notice Contd v2.doc-9 Jun 2011View
Oil Drum Store Elevations and Floor Plans.pdf-9 Jun 2011View
Planning Statement.pdf-9 Jun 2011View
SITE LAYOUT PLAN REV A (A1)_110603144916694.pdf-9 Jun 2011View
Block plan.pdf-16 Jun 2011View
Decision notice.pdf-9 Sept 2011View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Valid Date

    Published milestoneCouncil source
  2. Decision Date

    Published milestoneCouncil source
  3. Consultations Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permitted / Approved
Decision notice.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.