Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
lands East of Existing Translink Bus Depot at Upper Edward Street Newry and adjacent and South of No. 7 Cecil Street, adjacent and North of No.11 Cecil Street, and lands West of Nos.8-52 Cecil Street, Newry
Last published check: 30 Sept 2026, 16:34. Check the council record for more recent changes.
lands East of Existing Translink Bus Depot at Upper Edward Street Newry and adjacent and South of No. 7 Cecil Street, adjacent and North of No.11 Cecil Street, and lands West of Nos.8-52 Cecil Street, Newry
This record has no verified map location.
Extension to Newry Bus Depot to provide additional bus parking areas incorporating provision of 33No. electrical vehicle (‘EV’) charging units, erection of 2No. Low Voltage (‘LV’) switch room buildings, 2No.areas for future Northern Ireland Electricity (‘NIE’) Ring Main Unit (‘RMU’) Kiosks; 2No. staff shelters; along with associated site infrastructure (including: cable trays; parking bollards; bus wheel stops; Armco vehicle protection barriers; palisade fencing; 11No.12metre high lighting columns; and sound protection barrier) and all associated site works
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Application Form - Without Personal DataApplication Form | 28 Sept 2026 | View |
| Acknowledge ApplicationCorrespondence with Applicant/Agent/Solicitor | 28 Sept 2026 | View |
| Archaeological Impact AssessmentOther Supporting Information | 28 Sept 2026 | View |
| Outward Sound Level Impact AssessmentOther Supporting Information | 28 Sept 2026 | View |
| Outline Construction Environmental Management Plan (OCEMP)Other Supporting Information | 28 Sept 2026 | View |
| Preliminary Risk Assessment (PRA)Other Supporting Information | 28 Sept 2026 | View |
| Generic Quantitative Risk Assessment (GQRA) RedactedOther Supporting Information | 28 Sept 2026 | View |
| HYC 200 EV Charger specification documentOther Supporting Information | 28 Sept 2026 | View |
| HYC 50 EV Charger specification documentOther Supporting Information | 28 Sept 2026 | View |
| Climate Change StatementOther Supporting Information | 28 Sept 2026 | View |
| Transport Assessment Form (TAF)Other Supporting Information | 28 Sept 2026 | View |
| Protek Safety Barrier Specification Document.Other Supporting Information | 28 Sept 2026 | View |
| Outline Invasive Species Management Plan RedactedOther Supporting Information | 28 Sept 2026 | View |
| Flood Risk Assessment & Drainage Assessment RedactedOther Supporting Information | 28 Sept 2026 | View |
| Planning Supporting StatementOther Supporting Information | 28 Sept 2026 | View |
| Application Cover Letter RedactedOther Supporting Information | 28 Sept 2026 | View |
| 05 switch #1 proposed area planSite & Detailed Drawings | 28 Sept 2026 | View |
| 12 low voltage switchroom #2 proposed area planSite & Detailed Drawings | 28 Sept 2026 | View |
| 04 Site LayoutSite Layout or Block Plan | 28 Sept 2026 | View |
| 03 Proposed Site LayoutSite Layout or Block Plan | 28 Sept 2026 | View |
| 02 Existing Site LayoutSite Layout or Block Plan | 28 Sept 2026 | View |
| 01 Site Location MapSite Location Plan | 28 Sept 2026 | View |
| 20 Drainage LayoutDetailed Drawing Plans | 28 Sept 2026 | View |
| 19 EV Charging Points Site LayoutDetailed Drawing Plans | 28 Sept 2026 | View |
| 16 Sections D-D & F-F Engineering WorkshopCross Sections | 28 Sept 2026 | View |
| 14 Sections A-A & B-B Engineering WorkshopCross Sections | 28 Sept 2026 | View |
| 17 Sections F-F Engineering WorkshopCross Sections | 28 Sept 2026 | View |
| 15 Sections C-C Engineering WorkshopCross Sections | 28 Sept 2026 | View |
| 11 low voltage switchroom #2 proposed sectionsCross Sections | 28 Sept 2026 | View |
| 07 low voltage switchroom #1 proposed sectionsCross Sections | 28 Sept 2026 | View |
| 13 bus wash shelter plans and elevationsElevations and Floor Plans | 28 Sept 2026 | View |
| 18 Site LevelsSite Levels | 28 Sept 2026 | View |
| 08 low voltage switchroom #1 proposed elevationsProposed Elevations | 28 Sept 2026 | View |
| 10 low voltage switchroom #2 proposed elevationsProposed Elevations | 28 Sept 2026 | View |
| 09 low voltage switchroom #2 proposed ground floor & roof planProposed Floor Plans | 28 Sept 2026 | View |
| 06 switch #1 proposed ground floor & roof planProposed Floor Plans | 28 Sept 2026 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.