Status on council recordCouncil status: Not published

Application for non material amendment to install second electrical equipment kiosk attached to planning permission 22/02188/FULM; Construction of on-line flood storage reservoir to create upstream storage area on Cocker Beck to provide flood protection to village of Lowdham including removal of material and re-profiling of land and construction of associated embankment that will contain flow control structure in the form of engineered conduit; diversion of Cocker Beck for approximately 670m and diversion of the tributary to the north for approximately 250m; a number of additional elements including; the realignment of two Public Rights of Way, formation of new vehicular access to Lambley Road, residential/farm access track realignment, environmental mitigation works and landscaping (Re-submission of 21/02418/FULM).

Hunters Hill Farm Lambley Road Lowdham NG14 7DF

Newark and Sherwood District CouncilReference 24/00706/NMANon Material Amendment

Last published check: 3 Nov 2026, 10:07. Check the council record for more recent changes.

Status and dates

Last published check: 3 Nov 2026, 10:07 (UK)

  1. DoneReceived18 Apr 2024
  2. DoneValidated18 Apr 2024
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date16 May 2024
  5. DecidedApplication Permitted22 Apr 2024

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Non Material Amendment
Ward
Lowdham
Parish
Lowdham
Documents
0 published

Proposal

Application for non material amendment to install second electrical equipment kiosk attached to planning permission 22/02188/FULM; Construction of on-line flood storage reservoir to create upstream storage area on Cocker Beck to provide flood protection to village of Lowdham including removal of material and re-profiling of land and construction of associated embankment that will contain flow control structure in the form of engineered conduit; diversion of Cocker Beck for approximately 670m and diversion of the tributary to the north for approximately 250m; a number of additional elements including; the realignment of two Public Rights of Way, formation of new vehicular access to Lambley Road, residential/farm access track realignment, environmental mitigation works and landscaping (Re-submission of 21/02418/FULM).

Reference
24/00706/NMA
Alternative references
PP-12991936
Ward
Lowdham
Parish
Lowdham
Agent
Mr Matthew Marshall

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

No documents match this view.

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Application Permitted
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.