Council planning record

Single-storey side extension, infill extension to link house with annex; fenestration alterations including replacement dormer; strengthen rathers, install additional insulation and removal of log burner and plinth in the annex; relocation of gas pipe and meter; removal of insulation in main house; repair/replace of concrete oaths and standing; repair and repoint garden and brick shed walls; removal of cementitious render and replace with lime Insulate the main roof; hot tub (Application for Listed Building Consent)

10 NEWLANDS MANOR, EVERTON, MILFORD-ON-SEA SO41 0JH

DecidedReference: 25/10252New Forest District Council

Last published check: 3 Oct 2026, 10:55. Check the council record for more recent changes.

Application location

10 NEWLANDS MANOR, EVERTON, MILFORD-ON-SEA SO41 0JH

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Listed Building Alteration
Received
14 Mar 2025
Validated
24 Mar 2025
Determination deadline
Not published
Local authority
New Forest District Council

Application overview

Single-storey side extension, infill extension to link house with annex; fenestration alterations including replacement dormer; strengthen rathers, install additional insulation and removal of log burner and plinth in the annex; relocation of gas pipe and meter; removal of insulation in main house; repair/replace of concrete oaths and standing; repair and repoint garden and brick shed walls; removal of cementitious render and replace with lime Insulate the main roof; hot tub (Application for Listed Building Consent)

Proposal details

Reference
25/10252
Alternative references
PP-13855329
Ward
Milford & Hordle
Parish
Milford-On-Sea
Agent
Forest Architecture Limited

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 110 of 110

DocumentPublishedAction
DECISION NOTICE - DISCHARGE OF CONDITIONSPost Decision & Conditions Monitoring · PDF4 Jun 2026View
DECISION NOTICE - DISCHARGE OF CONDITIONSPost Decision & Conditions Monitoring · PDF4 Jun 2026View
RECOMMENDATION - DISCHARGE OF CONDITIONSPost Decision & Conditions Monitoring · PDF4 Jun 2026View
RECOMMENDATION - DISCHARGE OF CONDITIONSPost Decision & Conditions Monitoring · PDF4 Jun 2026View
CONDITIONS CONSULTEE RESPONSE - CONSERVATIONConsultee Comment · PDF28 May 2026View
COND 2 APPLICATION FORM REDACTEDPost Decision & Conditions Monitoring · PDF18 May 2026View
COND 2 BAUMIT START TOPPost Decision & Conditions Monitoring · PDF18 May 2026View
COND 2 - EXTERNAL WALL DETAILSPost Decision & Conditions Monitoring · PDF18 May 2026View
COND 2 BAUMIT MULTI CONTACT DETAILSPost Decision & Conditions Monitoring · PDF18 May 2026View
COND 2 BAUMIT START TEX GROB/CERAMIC TEXPost Decision & Conditions Monitoring · PDF18 May 2026View
RECOMMENDATION - DISCHARGE OF CONDITIONSPost Decision & Conditions Monitoring · PDF19 Feb 2026View
DECISION NOTICE - DISCHARGE OF CONDITIONSPost Decision & Conditions Monitoring · PDF19 Feb 2026View
CONDITIONS CONSULTEE RESPONSE - CONSERVATIONConsultee Comment · PDF18 Feb 2026View
COND 4 - SPEC SHEET FOR DOORSPost Decision & Conditions Monitoring · PDF4 Feb 2026View
COND 4 - DOOR/WINDOW DETAILSPlans · PDF4 Feb 2026View
COND 4 - AGENT EMAIL LINK TO DOOR SPECPost Decision & Conditions Monitoring · PDF4 Feb 2026View
CONDITIONS CONSULTEE RESPONSE - CONSERVATIONConsultee Comment · PDF27 Jan 2026View
COND 4 - WINDOW DETAILPost Decision & Conditions Monitoring · PDF22 Jan 2026View
COND 4 - WINDOW DETAILPost Decision & Conditions Monitoring · PDF22 Jan 2026View
CONDITIONS CONSULTEE RESPONSE - CONSERVATIONConsultee Comment · PDF15 Jan 2026View
DECISION NOTICE - DISCHARGE OF CONDITIONSPost Decision & Conditions Monitoring · PDF6 Jan 2026View
RECOMMENDATION - DISCHARGE OF CONDITIONSPost Decision & Conditions Monitoring · PDF6 Jan 2026View
SUPERSEDED COND 4 - AMENDED GLAZING DETAILS INCLUDING GLAZING BARSPost Decision & Conditions Monitoring · PDF6 Jan 2026View
COND 4 - AMENDED GLAZING DETAILS WINDOWSPost Decision & Conditions Monitoring · PDF6 Jan 2026View
COND 4 - AMENDED GLAZING DETAILS - DOORSPost Decision & Conditions Monitoring · PDF6 Jan 2026View
COND 4 - AMENDED GLAZING DETAILS ROOFLIGHTSPost Decision & Conditions Monitoring · PDF6 Jan 2026View
CONDITIONS CONSULTEE RESPONSE - CONSERVATIONConsultee Comment · PDF10 Dec 2025View
CONDITIONS CONSULTEE RESPONSE - CONSERVATIONConsultee Comment · PDF7 Nov 2025View
COND 2 ENVIRONMENT FILTERLESS FAN 2Post Decision & Conditions Monitoring · PDF29 Oct 2025View
COND 4 HERITAGE WINDOW QUOTEPost Decision & Conditions Monitoring · PDF29 Oct 2025View
COND 2 LIME GREEN MEDIUM MORTARPost Decision & Conditions Monitoring · PDF29 Oct 2025View
COND 2 LIME GREEN RENDER NATURAL FINISH TOP COATPost Decision & Conditions Monitoring · PDF29 Oct 2025View
COND 2 NATURAL FINISH DATA SHEETPost Decision & Conditions Monitoring · PDF29 Oct 2025View
COND 2 LIME GREEN RENDER ULTRA BASECOATPost Decision & Conditions Monitoring · PDF29 Oct 2025View
COND 2 MEV 300 TECHNICALPost Decision & Conditions Monitoring · PDF29 Oct 2025View
COND 2 SOLO-ONE-COAT-LIME-PLASTERPost Decision & Conditions Monitoring · PDF29 Oct 2025View
COND 2 STEICO SPECIAL DRYPost Decision & Conditions Monitoring · PDF29 Oct 2025View
COND 2 STEICOFLEX_036_ECOMERCHANTPost Decision & Conditions Monitoring · PDF29 Oct 2025View
APPLICATION FORM REDACTEDPost Decision & Conditions Monitoring · PDF29 Oct 2025View
COND 2 RENDER METHODOLOGY STATEMENT.Post Decision & Conditions Monitoring · PDF29 Oct 2025View
SUPERSEDED COND 4 PROPOSED WINDOW SCHEDULE PHASE 1Post Decision & Conditions Monitoring · PDF29 Oct 2025View
COND 4 PROPOSED ELEVATIONSPost Decision & Conditions Monitoring · PDF29 Oct 2025View
COND 2 & 4 EXTERNAL WALL DETAILSPost Decision & Conditions Monitoring · PDF29 Oct 2025View
COND 2 & 4 ROOF DETAILSPost Decision & Conditions Monitoring · PDF29 Oct 2025View
SUPERSEDED COND 4 PROPOSED GLAZING DETAILSPost Decision & Conditions Monitoring · PDF29 Oct 2025View
COND 2 ENVIRONMENT FILTERLESS FANPost Decision & Conditions Monitoring · PDF29 Oct 2025View
COND 2 LIME GREEN SOLO MESHPost Decision & Conditions Monitoring · PDF29 Oct 2025View
COND 2 WARMSHELL INTERNAL - IWI WOODFIBRE INSULATION.Post Decision & Conditions Monitoring · PDF29 Oct 2025View
COND 2 & 4 GROUND VENTILATION STRATEGYPost Decision & Conditions Monitoring · PDF29 Oct 2025View
COND 2 LIME GREEN STRONG MORTARPost Decision & Conditions Monitoring · PDF29 Oct 2025View
COND 2 MEV 300 BROCHUREPost Decision & Conditions Monitoring · PDF29 Oct 2025View
COND 2 & 4 PHASE 1 & 2 WORKSPost Decision & Conditions Monitoring · PDF29 Oct 2025View
COND 2 WOODFIBRE-AND-LIME-PLASTER-INSTALLATION-GUIDEPost Decision & Conditions Monitoring · PDF29 Oct 2025View
COND 2 CLAY ROOFTILE CLEANING METHODOLOGY STATEMENTPost Decision & Conditions Monitoring · PDF29 Oct 2025View
COND 2 REPOINTING METHODOLOGY STATEMENTPost Decision & Conditions Monitoring · PDF29 Oct 2025View
COND 2 MORTAR REBEDDING METHODOLOGY STATEMENTPost Decision & Conditions Monitoring · PDF29 Oct 2025View
COND 4 PROPOSED FIRST FLOOR PLANPost Decision & Conditions Monitoring · PDF29 Oct 2025View
COND 4 PROPOSED ELEVATIONSPost Decision & Conditions Monitoring · PDF29 Oct 2025View
SUPERSEDED COND 4 PROPOSED GLAZING DETAILSPost Decision & Conditions Monitoring · PDF29 Oct 2025View
COND 2 & 4 VENTILATION STRATEGYPost Decision & Conditions Monitoring · PDF29 Oct 2025View
COND 2 CEWOOD WOOD WOOL BOARD DATASHEETPost Decision & Conditions Monitoring · PDF29 Oct 2025View
COND 2 THERMA SLIM FLOOR INSULATION DATA SHEET AND INSTALLATION GUIDESPost Decision & Conditions Monitoring · PDF29 Oct 2025View
COND 2 UDOR TILES ROOF VENT SYSTEMPost Decision & Conditions Monitoring · PDF29 Oct 2025View
COND 2 & 4 DETAILED SPECIFICATIONPost Decision & Conditions Monitoring · PDF29 Oct 2025View
OFFICERS REPORTReports · PDF28 May 2025View
DECISION NOTICEDecisions · PDF28 May 2025View
AGENT EMAIL - AGREE EXTENSION OF TIMEApplications Processing · PDF27 May 2025View
EXTENSION OF TIME AGREEMENTApplications Processing · PDF20 May 2025View
Granted_AMENDED PLANNING REPORTPlans · PDF20 May 2025View
Granted_AMENDED PROPOSED SITE PLANPlans · PDF20 May 2025View
CONSULTEE RESPONSE - CONSERVATIONConsultee Comment · PDF16 May 2025View
SUPERSEDED AMENDED PLANNING REPORTPlans · PDF16 May 2025View
Granted_AMENDED FLOOR PLANPlans · PDF16 May 2025View
CONSULTEE RESPONSE - CONSERVATIONConsultee Comment · PDF16 May 2025View
SUPERSEDED AMENDED PLANNING REPORTSubmitted Applications · PDF15 May 2025View
Granted_AMENDED EXISTING AND PROPOSED WEST ELEVATIONPlans · PDF15 May 2025View
Granted_ROOF SECTION PLANPlans · PDF8 May 2025View
CONSULTEE RESPONSE - CONSERVATIONConsultee Comment · PDF11 Apr 2025View
INITIAL BRIEFING FROM CASE OFFICERApplications Processing · PDF7 Apr 2025View
Granted_SITE LOCATION PLANPlans · PDF24 Mar 2025View
Granted_REMOVED AND RETAINED ELEMENTS DIAGRAMPlans · PDF20 Mar 2025View
Granted_ROOFLIGHT AREA COMPARISON PLANPlans · PDF20 Mar 2025View
Granted_PROPOSED EXTERNAL WALL DETAILSPlans · PDF20 Mar 2025View
Granted_EXISTING-PROPOSED DORMER AREA COMPARISONPlans · PDF20 Mar 2025View
Granted_EXISTING GROUND FLOOR PLANPlans · PDF20 Mar 2025View
Granted_EXISTING FIRST FLOOR PLANPlans · PDF20 Mar 2025View
Granted_EXISTING ROOF PLANPlans · PDF20 Mar 2025View
Granted_PROPOSED GROUND FLOOR PLANPlans · PDF20 Mar 2025View
Granted_PROPOSED FIRST FLOOR PLANPlans · PDF20 Mar 2025View
SUPERSEDED PROPOSED GROUND FLOOR PLANSuperseded Plans · PDF20 Mar 2025View
Granted_PROPOSED FIRST FLOOR PLANPlans · PDF20 Mar 2025View
Granted_BLOCK PLANPlans · PDF20 Mar 2025View
Granted_EXISTING SITE PLANPlans · PDF20 Mar 2025View
SUPERSEDED PROPOSED SITE PLANSuperseded Plans · PDF20 Mar 2025View
Granted_PROPOSED ROOF PLANPlans · PDF20 Mar 2025View
Granted_PROPOSED EXTERNAL LIGHTING SCHEMEPlans · PDF20 Mar 2025View
Granted_EXISTING AND PROPOSED NORTH ELEVATIONPlans · PDF20 Mar 2025View
Granted_EXISTING AND PROPOSED NORTH ELEVATIONPlans · PDF20 Mar 2025View
Granted_EXISTING AND PROPOSED EAST ELEVATIONPlans · PDF20 Mar 2025View
Granted_EXISTING AND PROPOSED SOUTH ELEVATIONPlans · PDF20 Mar 2025View
SUPERSEDED EXISTING AND PROPOSED WEST ELEVATIONSuperseded Plans · PDF20 Mar 2025View
SUPERSEDED EXISTING AND PROPOSED WEST ELEVATIONSuperseded Plans · PDF20 Mar 2025View
SUPERSEDED PLANNING, DESIGN, ACCESS & HERITAGESubmitted Applications · PDF14 Mar 2025View
Granted_BAT SURVEY REPORTSubmitted Applications · PDF14 Mar 2025View
Granted_BIODIVERSITY CHECKLISTSubmitted Applications · PDF14 Mar 2025View
Granted_HOT TUB SPEC SHEETSubmitted Applications · PDF14 Mar 2025View
Granted_ARBORICULTURAL IMPACT ASSESSMENT & METHOD STATEMENTSubmitted Applications · PDF14 Mar 2025View
Granted_TREE PROTECTION PLANPlans · PDF14 Mar 2025View
Granted_CIL FORMSubmitted Applications · PDF14 Mar 2025View
Granted_APPLICATION FORM REDACTEDSubmitted Applications · PDF14 Mar 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Issued Date

    Published milestoneCouncil source

Decision & conditions

Granted Subject to Conditions
DECISION NOTICE - DISCHARGE OF CONDITIONS DECISION NOTICE - DISCHARGE OF CONDITIONS RECOMMENDATION - DISCHARGE OF CONDITIONS RECOMMENDATION - DISCHARGE OF CONDITIONS COND 2 APPLICATION FORM REDACTED COND 2 BAUMIT START TOP COND 2 - EXTERNAL WALL DETAILS COND 2 BAUMIT MULTI CONTACT DETAILS COND 2 BAUMIT START TEX GROB/CERAMIC TEX RECOMMENDATION - DISCHARGE OF CONDITIONS DECISION NOTICE - DISCHARGE OF CONDITIONS COND 4 - SPEC SHEET FOR DOORS COND 4 - AGENT EMAIL LINK TO DOOR SPEC COND 4 - WINDOW DETAIL COND 4 - WINDOW DETAIL DECISION NOTICE - DISCHARGE OF CONDITIONS RECOMMENDATION - DISCHARGE OF CONDITIONS SUPERSEDED COND 4 - AMENDED GLAZING DETAILS INCLUDING GLAZING BARS COND 4 - AMENDED GLAZING DETAILS WINDOWS COND 4 - AMENDED GLAZING DETAILS - DOORS COND 4 - AMENDED GLAZING DETAILS ROOFLIGHTS COND 2 ENVIRONMENT FILTERLESS FAN 2 COND 4 HERITAGE WINDOW QUOTE COND 2 LIME GREEN MEDIUM MORTAR COND 2 LIME GREEN RENDER NATURAL FINISH TOP COAT COND 2 NATURAL FINISH DATA SHEET COND 2 LIME GREEN RENDER ULTRA BASECOAT COND 2 MEV 300 TECHNICAL COND 2 SOLO-ONE-COAT-LIME-PLASTER COND 2 STEICO SPECIAL DRY COND 2 STEICOFLEX_036_ECOMERCHANT APPLICATION FORM REDACTED COND 2 RENDER METHODOLOGY STATEMENT. SUPERSEDED COND 4 PROPOSED WINDOW SCHEDULE PHASE 1 COND 4 PROPOSED ELEVATIONS COND 2 & 4 EXTERNAL WALL DETAILS COND 2 & 4 ROOF DETAILS SUPERSEDED COND 4 PROPOSED GLAZING DETAILS COND 2 ENVIRONMENT FILTERLESS FAN COND 2 LIME GREEN SOLO MESH COND 2 WARMSHELL INTERNAL - IWI WOODFIBRE INSULATION. COND 2 & 4 GROUND VENTILATION STRATEGY COND 2 LIME GREEN STRONG MORTAR COND 2 MEV 300 BROCHURE COND 2 & 4 PHASE 1 & 2 WORKS COND 2 WOODFIBRE-AND-LIME-PLASTER-INSTALLATION-GUIDE COND 2 CLAY ROOFTILE CLEANING METHODOLOGY STATEMENT COND 2 REPOINTING METHODOLOGY STATEMENT COND 2 MORTAR REBEDDING METHODOLOGY STATEMENT COND 4 PROPOSED FIRST FLOOR PLAN COND 4 PROPOSED ELEVATIONS SUPERSEDED COND 4 PROPOSED GLAZING DETAILS COND 2 & 4 VENTILATION STRATEGY COND 2 CEWOOD WOOD WOOL BOARD DATASHEET COND 2 THERMA SLIM FLOOR INSULATION DATA SHEET AND INSTALLATION GUIDES COND 2 UDOR TILES ROOF VENT SYSTEM COND 2 & 4 DETAILED SPECIFICATION DECISION NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.