Council planning record

PEDW (Planning and Environment Decisions Wales) consultation - Developments of National Significance (Wales) Regulations 2016 (As Amended): Installation of 66kv electricity network infrastructure connection comprising overhead lines and underground cables and associated development; connection starting at Foel Trawsnant Wind Farm in the North, heading South through the Western edge of Maesteg to a connection point with the existing overhead line approximately 2km South-West of Llangynwyd.

From Foel Trawsnant Wind Farm North Of Maesteg To South Of Maesteg, Near Llangynwyd

DecidedReference: P2025/0897Neath Port Talbot County Borough Council

Last published check: 4 Oct 2026, 03:42. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Standard Consultation Date

    Published milestoneCouncil source
  3. Application Validated Date

    Published milestoneCouncil source
  4. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source
  6. Decision Made Date

    Published milestoneCouncil source
  7. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided
Application type
Nat. Sig. Infrastructure Project/DNS
Received
17 Dec 2025
Validated
18 Dec 2025
Determination deadline
11 Feb 2026
Local authority
Neath Port Talbot County Borough Council

Application overview

PEDW (Planning and Environment Decisions Wales) consultation - Developments of National Significance (Wales) Regulations 2016 (As Amended): Installation of 66kv electricity network infrastructure connection comprising overhead lines and underground cables and associated development; connection starting at Foel Trawsnant Wind Farm in the North, heading South through the Western edge of Maesteg to a connection point with the existing overhead line approximately 2km South-West of Llangynwyd.

Proposal details

Reference
P2025/0897
Ward
Margam & Taibach
Parish
Port Talbot

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

From Foel Trawsnant Wind Farm North Of Maesteg To South Of Maesteg, Near Llangynwyd

This record has no verified map location.

View council map

Documents 131 of 131

DocumentPublishedAction
2025-08-15 - Environmental Statement - Vol 2 - Figure 8I.6 - Nightjar survey resultsSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 10.2 - Bedrock Geology Within 5km Study AreaSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 9.2 - Designated Heritage Assets and ZTV within 3kmSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 10.1 - Surface Water Features Within 1km Study AreaSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 10.3 - Superficial Geology Within 5km Study AreaSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 10.6 - Flood Map for Planning - Surface Water Flood Risk Within the 1km Study AreaSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 4 - Non-Technical SummarySupporting DocumentNot publishedView
2025-10-13 - Acceptance NoticeSupporting DocumentNot publishedView
2025-10-13 - Figure 5 - Typical Trench detailsSupporting DocumentNot publishedView
2025-10-13 - Figure 4 - Typical Transition Pole designSupporting DocumentNot publishedView
2025-10-13 - Figure 8 - Non-Statutory designated Sites within 2kmSupporting DocumentNot publishedView
2025-11-17 - Drainage StatementSupporting DocumentNot publishedView
2025-08-15 - Design and Access StatementSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 2.1 - Cumulative projects planSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 6.4 - LANDMAP Visual and Sensory Aspect AreasSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 6.8 - Viewpoint 3Supporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 6.10 - Viewpoint 5Supporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 7.2 - Transport Network SummarySupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 7B.2 - Forestry track access interactions with PRoWsSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 8.8 - Bat Survey LocationSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 8.11 - Mitigation and Enhancement PlanSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 8H.3 - Priority Habitats and Ancient Woodland MapSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 3 - Appendix 10B - Local Sewer NetworkSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 3 - Appendix 8H - Net Benefit for BiodiversitySupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 3 - Appendix 8D - CSA Environmental (2024c). Water Vole Survey ReportSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 3 - Appendix 4A - CEMP - Annex C - Peat and Soil Survey ReportSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 3 - Appendix 1A - Competent ExpertsSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 3 - Appendix 1B - Glossary and AbbreviationsSupporting DocumentNot publishedView
2025-08-15 - Green Infrastructure StatementSupporting DocumentNot publishedView
2024-10-16 - NOTIF002 - Site Location PlanSupporting DocumentNot publishedView
2024-10-16 - NOTIF001 - Notice of proposed Application for Permisison for a DNS- RedactedSupporting DocumentNot publishedView
2025-01-21 - EIA Scoping Request - Site plan with LPA boundaries (1)Supporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 3 - Appendix 2A - Scoping ReportSupporting DocumentNot publishedView
2025-03-12 - EIA Scoping Direction (1)Supporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 3 - Appendix 2B - Scoping OpinionSupporting DocumentNot publishedView
2025-12-17 - EXNOTE001 - Acceptance NoticeSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 8I.3 - Distribution and abundance survey areasSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 8K.1 - Mitigation and Enhancement PlanSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 4B.5 - MRA mapped past shallow coal miningSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 6.3 - Local Landscape Character PlanSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 6.6 - Viewpoint 1Supporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 6.12 - Viewpoint 7Supporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 7A.1 - Construction RoutesSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 7.3 - Accident Assessment AreaSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 7.1 - Local Road Network SummarySupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 7B.1 - PRoWs affected by the ProjectSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 8.3 - Non-Statutory Designated Sites within 2kmSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 8.10 - Ornithological Survey AreasSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 3 - Appenidx 8K - Principles of a Conservation Plan for Water VoleSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 3 - Appendix 8F - Otter ReportSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 3 - Appendix 4A - CEMP - Annex D - Outline Soil Management PlanSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 10.5 - Flood Map for Planning - Fluvial flood risk within the 1km Study AreaSupporting DocumentNot publishedView
2025-09-09 - ES Completeness ReportSupporting DocumentNot publishedView
2025-10-13 - Figure 9 - Statutory designated Sites within 10km (extended to 30km for Bat Sites)Supporting DocumentNot publishedView
2025-10-13 - Figure 10 - Landscape Designations PlanSupporting DocumentNot publishedView
2025-10-13 - Figure 7 - Phase 1 Habitat resultsSupporting DocumentNot publishedView
2025-11-14 - Environmental Statement - AddendumSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 4B.3 - Historical Borehole locationsSupporting DocumentNot publishedView
2025-08-15 - Confirmation StatementSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 6.7 - Viewpoint 2Supporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 8.1 - Survey AreaSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 8G.2 - Bat Activity Survey ResultsSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 8.7 - Otter survey resultsSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Contents PageSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 8I.1 - Site locationSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 3 - Table of ContentsSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 3 - Appendix 9B - Stage 1 Settings Assessment (Scoping) for Historic AssetsSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 8H.6 - Mitigation and Enhancement PlanSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 3 - Appendix 9A - Extract of draft Archaeological Desk-based AssessmentSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 3 - Appendix 7A - Outline Construction Traffic Management PlanSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 3 - Appendix 8G - Bat ReportSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 3 - Appendix 6A - Landscape and Visual Impact Assessement (LVIA) Methodology and GlossarySupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 3 - Appendix 6B - Landscape Baseline Descriptions and Sensitivity AssessmentsSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 3 - Appendix 4D - Electronic and Magnetic Fields_The FactsSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 3 - Appendix 4A - CEMP - Annex A - NVMPSupporting DocumentNot publishedView
2024-11-22 - EIA Scoping Request - Covering LetterSupporting DocumentNot publishedView
2024-11-22 - EIA Scoping Request - Site Plan - Grid Connection RouteSupporting DocumentNot publishedView
2024-11-22 - EIA Scoping Request - Scoping Report_P02 FinalSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 8I.7 - Incidental recordsSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 9.1 - Designated Heritage AssetsSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 10A.3 - WFD Groundwater Body CatchmentsSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 10A.1 - Watercourses (With Activities)Supporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 1 - ES ChaptersSupporting DocumentNot publishedView
2025-10-13 - Figure 6 - 66kV Joint Bay LayoutSupporting DocumentNot publishedView
2025-10-13 - Figure 2 - Proposed LayoutSupporting DocumentNot publishedView
2025-10-13 - Article 16 NoticeSupporting DocumentNot publishedView
2025-09-02 - IndexSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 4.1 - Grid connection and proposed construction compound locationSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 4B.4 - MRA mapped coal outcropsSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 4B.6 - MRA areas of probable unrecorded shallow miningSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 6.2 - Public Rights of Way PlanSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 6.1 - Zone of Theoretical Visibility PlanSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 4B.8 - MRA recorded opencast workingsSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 6.11 - Viewpoint 6Supporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 7B.3 - ORPAs and OALs affected by the ProjectSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 8G.1 - Site Location and Bat Survey LocationsSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 8H.1 - Site LocationSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 8.5 - Priority habitats and Ancient WoodlandSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 8H.2 - Phase 1 Habitat ResultsSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 8H.4 - SINCs within the SiteSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 8H.5 - Trees with Bat Roosting SuitabilitySupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 3 - Appendix 8A - Preliminary Ecological AppraisalSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 3 - Appendix 7B - Outline Public Rights of Way Management PlanSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 3 - Appendix 6E - Visual AssessmentSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 3 - Appendix 6D - Local Landscape Character Assessment and LANDMAP VSAA AssessmentSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 3 - Appendix 8C - CSA Environmental (2024b). Dormouse Survey ReportSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 3 - Appendix 8B - CSA Environmental (2024a). Preliminary Ecological AppraisalSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 3 - Appendix 8E - CSA Environmental (2024d). Great Crested Newt ReportSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 3 - Appendix 4A - CEMP - Annex B - Land Quality Phase 1 Desk Study (PRA)Supporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 3 - Appendix 2C - Pre-Application Consultation ResponsesSupporting DocumentNot publishedView
2025-08-15 - Planning StatementSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 8I.5 - Moorland breeding birds survey resultsSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 8I.2 - Viewpoint locationsSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 8I.4 - Breeding season VP survey flight linesSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 8.6 - Habitats of conservation importanceSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 10.4 - Groundwater Vulnerability Within 5km Study AreaSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 10A.2 - WFD Surface Water Body CatchmentsSupporting DocumentNot publishedView
2025-10-13 - Application FormSupporting DocumentNot publishedView
2025-10-13 - Figure 1 - Site Location PlanSupporting DocumentNot publishedView
2025-10-13 - Figure 3 - Typical H Pole designSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 4B.7 - MRA recorded mine entriesSupporting DocumentNot publishedView
2025-08-15 - Pre Application Consultation ReportSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 6.5 - Landscape Designations PlanSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 6.9 - Viewpoint 4Supporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 8.2 - Statutory Designated Sites within 10kmSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 8.4 - Phase 1 habitat ResultsSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 8.9 - Bat Survey ResultsSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 2 - Figure 8G.3 - Close Inspection Tree Survey ResultsSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 3 - Appendix 10A - Water Framework Directive AssessmentSupporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 3 - Appenidx 8I - Ornithology Report (Interim)Supporting DocumentNot publishedView
2025-08-15 - Environmental Statement - Vol 3 - Appendix 6C - Visual Baseline Descriptions and Sensitivity AssessmentsSupporting DocumentNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

No Objections
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.