Council planning record

Full planning permission for the demolition of existing buildings and structures, partial infill of the BOS lagoon, and construction of a new electric arc furnace-based steel production facility (1 no. arc furnace, 2 no. ladle furnaces). The development includes chemical/material storage and transfer infrastructure, pipework and cabling (above and below ground), buildings, fume and dust treatment plant, water treatment facility and material handling systems, electrical control rooms and power infrastructure, offices and ancillary facilities, together with new and amended roads and rail lines, landscaping and green infrastructure, lighting, hardstanding, CCTV, drainage and associated engineering operations.Outline planning permission (with all matters reserved except for access and landscaping) for the construction of a scrap metal handling facility and associated scrap yards, scrap processing facility, new substation, underground and overground electrical infrastructure, and new and amended roads and rail lines, landscape and green infrastructure, lighting, hardstanding, CCTV, drainage and associated engineering operations.

Port Talbot Steelworks Grange Road Margam Neath Port Talbot SA13 2NG

DecidedReference: P2024/0711Neath Port Talbot County Borough Council

Last published check: 22 Sept 2026, 00:53. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Environmental Impact Assessment Received

    Published milestoneCouncil source
  2. Application Received Date

    Published milestoneCouncil source
  3. Application Validated Date

    Published milestoneCouncil source
  4. Standard Consultation Date

    Published milestoneCouncil source
  5. Last Site Notice Posted Date

    Published milestoneCouncil source
  6. Last Advertised In Press Date

    Published milestoneCouncil source
  7. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Decision Issued Date

    Published milestoneCouncil source
  12. Decision Made Date

    Published milestoneCouncil source
  13. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided
Application type
Full Plans
Received
7 Nov 2024
Validated
7 Nov 2024
Determination deadline
26 Feb 2025
Local authority
Neath Port Talbot County Borough Council

Application overview

Full planning permission for the demolition of existing buildings and structures, partial infill of the BOS lagoon, and construction of a new electric arc furnace-based steel production facility (1 no. arc furnace, 2 no. ladle furnaces). The development includes chemical/material storage and transfer infrastructure, pipework and cabling (above and below ground), buildings, fume and dust treatment plant, water treatment facility and material handling systems, electrical control rooms and power infrastructure, offices and ancillary facilities, together with new and amended roads and rail lines, landscaping and green infrastructure, lighting, hardstanding, CCTV, drainage and associated engineering operations.Outline planning permission (with all matters reserved except for access and landscaping) for the construction of a scrap metal handling facility and associated scrap yards, scrap processing facility, new substation, underground and overground electrical infrastructure, and new and amended roads and rail lines, landscape and green infrastructure, lighting, hardstanding, CCTV, drainage and associated engineering operations.

Proposal details

Reference
P2024/0711
Alternative references
PP-13327456
Ward
Margam & Taibach
Parish
Port Talbot
Agent
Turley Planning

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Port Talbot Steelworks Grange Road Margam Neath Port Talbot SA13 2NG

This record has no verified map location.

View council map

Documents 309 of 309

DocumentPublishedAction
Decision Notice Rev 25DecisionNot publishedView
Decision Notice - REVISION 24DecisionNot publishedView
Decision Notice REV 23DecisionNot publishedView
Decision Notice REV 22DecisionNot publishedView
Decision Notice REV 21DecisionNot publishedView
Decision Notice REVISION 20DecisionNot publishedView
-DecisionNot publishedView
Revision 19DecisionNot publishedView
Decision Notice - REVISION 16DecisionNot publishedView
Decision Notice - REVISION 17DecisionNot publishedView
Decision Notice REV 15DecisionNot publishedView
Decision Notice REV 14DecisionNot publishedView
Decision Notice REVISION 12DecisionNot publishedView
Decision Notice REVISION 9DecisionNot publishedView
DN P2024-0711 Rev 11DecisionNot publishedView
Decision Notice REVISION 10DecisionNot publishedView
Decision Notice REVISION 8DecisionNot publishedView
Decision Notice REVISION 7DecisionNot publishedView
Decision Notice REV 6DecisionNot publishedView
Decision Notice REV 5DecisionNot publishedView
Decision Notice REVISION 4DecisionNot publishedView
Decision Notice REV 3DecisionNot publishedView
DN P2024-0711 Rev 1DecisionNot publishedView
Decision Notice REVISION 2DecisionNot publishedView
Decsion NoticeDecisionNot publishedView
Demolition - 1F Electrical Room - 040007 - P01 - EAFDrawings - PlansNot publishedView
Demolition - 1E Harsco Frag Plant - 040006 - P01 - EAFDrawings - PlansNot publishedView
Demolition - 1M HAA Coal Rail Unloading Station - 040014 - P01 - EAFDrawings - PlansNot publishedView
Coal Mining Risk Assessment v.2.0 - EAF - Part2Supporting DocumentNot publishedView
Waste Management Plan - EAFSupporting DocumentNot publishedView
Unit 30 - HBI Pig Iron Storage Area - Proposed GAs - 060001 - P03 - EAFDrawings - PlansNot publishedView
Unit 22 - Power Compensation - Proposed GAs - 060001 - P03 - EAFDrawings - PlansNot publishedView
Unit 20 - Powder Silos - Proposed GAs - 060001 - P02 - EAFDrawings - PlansNot publishedView
Unit 15 - Changing and Office Block - Proposed GAs - 060001 - P04 - EAFDrawings - PlansNot publishedView
Unit 16 - Emergency Tank - Proposed GAs - 060001 - P03 - EAFDrawings - PlansNot publishedView
Unit 14 - Car Parking Area - Proposed GAs - 060001 - P05 - EAFDrawings - PlansNot publishedView
Unit 11 - Melt Shop WTP Electrical - Proposed Ground Floorplan - 061001 - P01 - EAFDrawings - PlansNot publishedView
Unit 08 - Primary Pump House - Proposed Ground Floorplan - 061001 - P01 - EAFDrawings - PlansNot publishedView
Unit 07 - Fire Water Pump House - Proposed GAs - 060001 - P03 - EAFDrawings - PlansNot publishedView
Unit 06 - Ferro Alloys Bunker - Proposed First Floor Plan - 061002 - P01 - EAFDrawings - PlansNot publishedView
Unit 05 - Hot Briquetted Iron Dolo Lime Bunker - Proposed Lower Floorplan - 061001 - P01 - EAFDrawings - PlansNot publishedView
Site Location Plan - 900001 - P05 - EAFLocation PlanNot publishedView
Pre-Application Consultation Report - EAF - Part 1Supporting DocumentNot publishedView
Landscape Proposals - Site Sections - 1 of 2 - 7000 - Rev06 - EAFDrawings - PlansNot publishedView
Landscape Proposals - 1000 to 1015 - Rev06 - EAFDrawings - PlansNot publishedView
Existing Site Levels - 900003 - P00 - EAFDrawings - PlansNot publishedView
ES Figure 8.1 - Biodiversity Survey Areas - 16 August 2024 - EAFSupporting DocumentNot publishedView
ES Figure 7.4 - EAF and Scrap Phase Two Alternative Noise Contour Map - 28 October 2024 - EAFSupporting DocumentNot publishedView
ES Figure 7.3 - EAF and Scrap Phase One Alternative Noise Contour Map - 28 October 2024 - EAFSupporting DocumentNot publishedView
ES Figure 6.3 - Sources Buildings Receptors S5 - 20 August 2024 - EAFSupporting DocumentNot publishedView
ES Figure 6.2 - Sources Buildings Receptors S1a S2a S3 S4a - 20 August 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.25 - Viewpoint 17a-c - October 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.22 - Viewpoint 14a-c - October 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.21 - Viewpoint 13a-c - October 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.16 - Viewpoint 8a-c - October 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.11 - Viewpoint 3a-c - October 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.5b - Landmap Cultural - 6 September 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.3 - National Landscape Character Areas - 6 September 2024 - EAFSupporting DocumentNot publishedView
ES Figure 2.3 - Demolition Site Plan - 21 October 2024 - EAFSupporting DocumentNot publishedView
ES Chapter 9 - Surface Water Flood Risk and Drainage - November 2024 - EAFSupporting DocumentNot publishedView
ES Chapter 5 - Landscape and Visual Impact - November 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 12.1 - Traffic assessment Part 1 - October 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 11.1 - Archaeological Desk Based Assessment Part 1 - 30 May 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 10.1 - PRA Part 10 - October 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 10.1 - PRA Part 12 - October 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 10.1 - PRA Part 13 - October 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 10.1 - PRA Part 8 - October 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 10.1 - PRA Part 5 - October 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 8.9 - Water vole and otter survey Part 2 - May 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 8.6 - Bat surveys Part 4 - June 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 8.2 - National vegetative classification survey Part 2 - May 2024- EAFSupporting DocumentNot publishedView
ES Appendix 8.2 - National vegetative classification survey Part 3 - May 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 6.1- 6.7 - Air Quality Technical Appendix - 5 November 2024 - EAFSupporting DocumentNot publishedView
Design and Access Statement - EAF - Part 7Supporting DocumentNot publishedView
Design and Access Statement - EAF - Part 4Supporting DocumentNot publishedView
Design and Access Statement - EAF - Part 2Supporting DocumentNot publishedView
Demolition - 1E Harsco Frag Plant - 040006 - P01 - EAFDrawings - PlansNot publishedView
Demolition - 1F Electrical Room - 040007 - P01 - EAFDrawings - PlansNot publishedView
Covering Letter - 6 November 2024 - EAFSupporting DocumentNot publishedView
Coal Mining Risk Assessment v.2.0 - EAF - Part5Supporting DocumentNot publishedView
Demolition - 1C Harsco Baler Plant - 040004 - P01 - EAFDrawings - PlansNot publishedView
Arboricultural Impact Assessment - EAFSupporting DocumentNot publishedView
Unit 32 - HBI Electrical - Proposed Ground Floorplan 061001 - P01 - EAFDrawings - PlansNot publishedView
Unit 22 - Power Compensation - Proposed Ground Floorplan - 061001 - P01 - EAFDrawings - PlansNot publishedView
Unit 21 - Main Power Centre - Proposed Ground Floor Plan - 061001 - P01 - EAFDrawings - PlansNot publishedView
Unit 13 - Compressor House - Proposed Ground Floorplan - 061001 - P01 - EAFDrawings - PlansNot publishedView
Unit 08 - Primary Pump House - Proposed GAs - 060001 - P04 - EAFDrawings - PlansNot publishedView
Unit 06 - Ferro Alloys Bunker - Proposed Ground Floor Plan - 061001 - P01 - EAFDrawings - PlansNot publishedView
Unit 05 - Hot Briquetted Iron Dolo Lime Bunker - Proposed Upper Floorplan - 061002 - P01 - EAFDrawings - PlansNot publishedView
Unit 05 - Hot Briquetted Iron Dolo Lime Bunker - Proposed GAs - 060001 - P03 - EAFDrawings - PlansNot publishedView
Unit 02 - Consteel Conveyor - Proposed GAs - 060001 - P03 - EAFDrawings - PlansNot publishedView
Proposed Site Plan - Indicative Outline Plan - Phase 2 - 900010 - P06 - EAFDrawings - PlansNot publishedView
FeeCalculationSupporting DocumentNot publishedView
ES Non-Technical Summary - November 2024 - EAFSupporting DocumentNot publishedView
ES Figure 14.2 - Overall Deprivation by LSOA - 16 August 2024 - EAFSupporting DocumentNot publishedView
ES Figure 8.3 - Phase 1 Habitats - 16 August 2024 - EAFSupporting DocumentNot publishedView
ES Figure 7.1 - EAF and Scrap Phase One Noise Contour Map - 28 October 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.32 - Viewpoint - 24a-c - October 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.23 - Viewpoint 15a-c - October 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.17 - Viewpoint 9a-c - October 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.5e - Landmap Visual Sensory - 6 September 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.5d - Landmap Historic - 5 November 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.2 - Topography and Landcover - 6 September 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.1b - ZTV and Viewpoints - 6 September 2024 - EAFSupporting DocumentNot publishedView
ES Figure 2.4 - Landscape Proposals Part 1 - 1 November 2024 - EAFSupporting DocumentNot publishedView
ES Chapter 16 - Cumulative Effects - November 2024 - EAFSupporting DocumentNot publishedView
ES Chapter 14 - Socioeconomics and Health - November 2024 - EAFSupporting DocumentNot publishedView
ES Figure 2.1a - Proposed Site Plan - Hybrid Planning Application - 15 October 2024 - EAFSupporting DocumentNot publishedView
ES Chapter 17 - Summary - November 2024 - EAFSupporting DocumentNot publishedView
ES Figure 2.2 - Build Zones and Max Heights - 5 September 2024 - EAFSupporting DocumentNot publishedView
ES Chapter 13 - Climate Change - November 2024 - EAFSupporting DocumentNot publishedView
ES Chapter 11 - Cultural Heritage - November 2024 - EAFSupporting DocumentNot publishedView
ES Chapter 8 - Biodiversity - November 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 12.1 - Traffic assessment Part 2 - October 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 11.1 - Archaeological Desk Based Assessment Part 3 - 30 May 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 11.1 - Archaeological Desk Based Assessment Part 2 - 30 May 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 10.1 - PRA Part 19 - October 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 10.1 - PRA Part 16 - October 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 8.11 - Net biodiversity benefit - October 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 8.8 - Reptile survey - May 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 8.6 - Bat surveys Part 5 - June 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 8.6 - Bat surveys Part 2 - June 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 8.1 - Preliminary Ecological Appraisal Part 3 - June 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 7.2 - Noise and Vibration Impact Assessment - EAF - October 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 7.1 - Noise and Vibration - Scrap Handling Facility - October 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 5.3 - Landscape sensitivity - October 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 4.1 - Informal EIA Scoping Consultation Notes Part 3 - 20 May 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 4.1 - Informal EIA Scoping Consultation Notes Part 5 - 20 May 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 4.1 - Informal EIA Scoping Consultation Notes Part 4 - 20 May 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 4.1 - Informal EIA Scoping Consultation Notes Part 1 - 20 May 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 2.2 - LEMP - 28 October 2024 - EAFSupporting DocumentNot publishedView
Design and Access Statement - EAF - Part 1Supporting DocumentNot publishedView
Demolition - 1P BF Gas Pipe Rack - 040017 - P01 - EAFDrawings - PlansNot publishedView
Demolition - 1J RH Pump House - 040011 - P01 - EAFDrawings - PlansNot publishedView
Coal Mining Risk Assessment v.2.0 - EAF - Part6Supporting DocumentNot publishedView
Demolition - 1A Scrap Storage Shed - 040002 - P02 - EAFDrawings - PlansNot publishedView
Coal Mining Risk Assessment v.2.0 - EAF - Part4Supporting DocumentNot publishedView
Coal Mining Risk Assessment v.2.0 - EAF - Part1Supporting DocumentNot publishedView
ApplicationFormRedactedForms and CertificatesNot publishedView
Unit 32 - HBI Electrical - Proposed GAs - 060001 - P03 - EAFDrawings - PlansNot publishedView
Unit 21 - Main Power Centre - Proposed GAs - 060001 - P03 - EAFDrawings - PlansNot publishedView
Unit 17 - Lagoon Water Pump House - Proposed Ground Floorplan - 061001 - P01 - EAFDrawings - PlansNot publishedView
Unit 12 - Melt Shop FEP Electrical - Proposed GAs - 060001 - P03 - EAFDrawings - PlansNot publishedView
Unit 11 - Melt Shop WTP Electrical - Proposed GAs - 060001 - P03 - EAFDrawings - PlansNot publishedView
Unit 09 - Secondary Pump House - Proposed GAs - 060001 - P03 - EAFDrawings - PlansNot publishedView
Unit 07 - Fire Water Pump House - Proposed Ground Floor Plan - 061001 - P01 - EAFDrawings - PlansNot publishedView
Unit 03 - Fume Treatment Plant - Proposed Ground Floorplan - 061001 - P01 - EAFDrawings - PlansNot publishedView
Unit 01 - Canopy Hood - Proposed GAs - 060001 - P03 - EAFDrawings - PlansNot publishedView
Proposed Site Plan - Indicative Outline Plan - Phase 1 - 900010A - P06 - EAFDrawings - PlansNot publishedView
Outline Drainage Strategy - Rev D - EAF - Part 3Supporting DocumentNot publishedView
Habitat Regulations Assessment Screening - EAFSupporting DocumentNot publishedView
ES Figure 14.8 - Health Deprivation by LSOA - 16 August 2024 - EAFSupporting DocumentNot publishedView
ES Figure 14.5 - Housing Deprivation by LSOA - 16 August 2024 - EAFSupporting DocumentNot publishedView
ES Figure 14.4 - Physical Environment Deprivation by LSOA - 16 August 2024 - EAFSupporting DocumentNot publishedView
ES Figure 6.6 - Process Contribution Areas - 20 August 2024 - EAFSupporting DocumentNot publishedView
ES Figure 7.2 - EAF and Scrap Phase Two Noise Contour Map - 28 October 2024 - EAFSupporting DocumentNot publishedView
ES Figure 6.1 - Sources Buildings Receptor S2 S4 - 20 August 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.26 - Viewpoint 18a-c - October 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.13 - Viewpoint 5a-c - October 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.8 - Cumulative Schemes - 6 September 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.4 - Landscape and Seascape Character - 6 September 2024- EAFSupporting DocumentNot publishedView
ES Figure 5.1c - ZTV and Viewpoints - 6 September 2024- EAFSupporting DocumentNot publishedView
ES Figure 2.5 - Lighting Design - 1 November 2024 - EAFSupporting DocumentNot publishedView
ES Figure 2.1b - Proposed Site Plan - Indicative Outline Plan Phase 1 - 15 October 2024 - EAFSupporting DocumentNot publishedView
ES Figure 2.1c - Proposed Site Plan - Indicative Outline Plan Phase 2 - 15 October 2024 - EAFSupporting DocumentNot publishedView
ES Figure 2.1d - Proposed Site Plan - Laydown Areas - 15 October 2024 - EAFSupporting DocumentNot publishedView
ES Chapter 15 - Major Accidents and Disasters - November 2024 - EAFSupporting DocumentNot publishedView
ES Chapter 12 - Transport and Access - November 2024 - EAFSupporting DocumentNot publishedView
ES Chapter 7 - Noise and Vibration - November 2024 - EAFSupporting DocumentNot publishedView
ES Chapter 2 - Proposed Development - November 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 10.1 - PRA Part 15 - October 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 10.1 - PRA Part 1 - October 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 10.1 - PRA Part 2 - October 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 8.1 - Preliminary Ecological Appraisal Part 2 - June 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 8.1 - Preliminary Ecological Appraisal Part 1 - June 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 4.1 - Informal EIA Scoping Consultation Notes Part 2 - 20 May 2024 - EAFSupporting DocumentNot publishedView
Elevated Service Route - 063200 - P01 - EAFDrawings - PlansNot publishedView
Design and Access Statement - EAF - Part 8Supporting DocumentNot publishedView
Design and Access Statement - EAF - Part 3Supporting DocumentNot publishedView
Demolition - 1O Inlet Structure - 040016 - P01 - EAFDrawings - PlansNot publishedView
Demolition - 1H RH Penthouse - 040009 - P01 - EAFDrawings - PlansNot publishedView
Coal Mining Risk Assessment v.2.0 - EAF - Part3Supporting DocumentNot publishedView
Unit 31 - Charger Bay South Extension - Proposed GAs - 060001 - P03 - EAFDrawings - PlansNot publishedView
Unit 15 - Changing and Office Block - Proposed Floorplans - 060101 - P01 - EAFDrawings - PlansNot publishedView
Unit 10 - Melt Shop Power Distribution - Proposed First Floor Plan - 061002 - P01 - EAFDrawings - PlansNot publishedView
Unit 03 - Fume Treatment Plant - Proposed GAs - 060001 - P03 - EAFDrawings - PlansNot publishedView
Proposed Site Plan - Laydown Areas - 900013 - P06 - EAFDrawings - PlansNot publishedView
Proposed Lighting Layout - Full - 900050 - P00 - EAFDrawings - PlansNot publishedView
Planning Statement - EAFSupporting DocumentNot publishedView
Landscape Proposals - Site Sections - 2 of 2 - 7001 - Rev06 - EAFDrawings - PlansNot publishedView
Flood Consequence Assessment - Rev E - EAFSupporting DocumentNot publishedView
ES Figure 14.1 - Extent of LSOAs - 16 August 2024 - EAFSupporting DocumentNot publishedView
ES Figure 8.2 - Protected Sites Within 10km - 16 August 2024 - EAFSupporting DocumentNot publishedView
ES Figure 6.4 - Ecological Receptors Modelled Scenarios - 20 August 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.34 - 5.38 - Night-time Visualisations - July 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.30 - Viewpoint 22a-c - October 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.24 - Viewpoint 16a-c - October 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.19 - Viewpoint 11a-c - October 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.10 - Viewpoint 2a-c - October 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.6 - Designations - 6 September 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.5a - Landmap Habitat - 6 September 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.5c - Landmap Geology - 5 November 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.1a - ZTV and Viewpoints - 6 September 2024 - EAFSupporting DocumentNot publishedView
ES Figure 1.1 - Site Location Plan - 15 October 2024 - EAFSupporting DocumentNot publishedView
ES Chapter 10 - Land Soil and Groundwater - November 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 16.1 - Committed developments long list - September 2024 - EAFSupporting DocumentNot publishedView
ES Chapter 3 - Environmental Context and Alternatives - November 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 10.1 - PRA Part 3 - October 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 8.9 - Water vole and otter survey Part 1 - May 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 8.6 - Bat surveys Part 3 - June 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 8.5 - Breeding Birds survey - June 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 8.2 - National vegetative classification survey Part 1 - May 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 5.5 - Night-time visualisations methodology - 28 October 2024 - EAFSupporting DocumentNot publishedView
Demolition - 1Q Compressor House With MCC Room - 040018 - P01 - EAFDrawings - PlansNot publishedView
Demolition - 1B Existing Pump House - 040003 - P01 - EAFDrawings - PlansNot publishedView
Coal Mining Risk Assessment v.2.0 - EAF - Part7Supporting DocumentNot publishedView
Build Zones and Max Heights - 900200 - P04 - EAFDrawings - PlansNot publishedView
Outline Drainage Strategy - Rev D - EAF - Part 2Supporting DocumentNot publishedView
Wildlife Tower - 063100 - P01 - EAFDrawings - PlansNot publishedView
Unit 31 - Charger Bay South Extension - Proposed Ground Floorplan - 061001 - P01 - EAFDrawings - PlansNot publishedView
Unit 21 - Main Power Centre - Proposed First Floor Plan - 061002 - P01 - EAFDrawings - PlansNot publishedView
Unit 18 - Green Walkway Extension - Proposed GAs - 060001 - P05 - EAFDrawings - PlansNot publishedView
Unit 19 - Active Carbon Injection Silos - Proposed GAs - 060001 - P03 - EAFDrawings - PlansNot publishedView
Unit 17 - Lagoon Water Pump House - Proposed GAs - 060001 - P03 - EAFDrawings - PlansNot publishedView
Unit 13 - Compressor House - Proposed GAs - 060001 - P03 - EAFDrawings - PlansNot publishedView
Unit 12 - Melt Shop FEP Electrical - Proposed Ground Floorplan - 061001 - P01 - EAFDrawings - PlansNot publishedView
Unit 12 - Melt Shop FEP Electrical - Proposed First Floorplan - 061002 - P01 - EAFDrawings - PlansNot publishedView
Unit 10 - Melt Shop Power Distribution - Proposed Ground Floor Plan - 061001 - P01 - EAFDrawings - PlansNot publishedView
Unit 11 - Melt Shop WTP Electrical - Proposed First Floorplan - 061002 - P01 - EAFDrawings - PlansNot publishedView
Unit 10 - Melt Shop Power Distribution - Proposed GAs - 060001 - P03 - EAFDrawings - PlansNot publishedView
Unit 09 - Secondary Pump House - Proposed Ground Floorplan - 061001 - P01 - EAFDrawings - PlansNot publishedView
Unit 06 - Ferro Alloys Bunker - Proposed GAs - 060001 - P03 - EAFDrawings - PlansNot publishedView
Concept Design Fire Strategy - 3000 - Rev03 - EAFSupporting DocumentNot publishedView
Demolition - 1D Weigh Bridge - 040005 - P01 - EAFDrawings - PlansNot publishedView
Demolition - 1I RH Cooling Tower - 040010 - P01 - EAFDrawings - PlansNot publishedView
Demolition - 1L Storage Shed - 040013 - P01 - EAFDrawings - PlansNot publishedView
Demolition - 1K Slag Splashing Compound - 040012 - P01 - EAFDrawings - PlansNot publishedView
Demolition - 1G Mechanical Electrical Workshop - 040008 - P01 - EAFDrawings - PlansNot publishedView
Demolition - 1M HAA Coal Rail Unloading Station - 040014 - P01 - EAFDrawings - PlansNot publishedView
Demolition - 1N Coal Conveyor Superstructure - 040015 - P01 - EAFDrawings - PlansNot publishedView
Demolition - 1R Concrete Abutments - 040019 - P01 - EAFDrawings - PlansNot publishedView
Demolition Site Plan - 040001- P03 - EAFDrawings - PlansNot publishedView
Design and Access Statement - EAF - Part 5Supporting DocumentNot publishedView
Design and Access Statement - EAF - Part 6Supporting DocumentNot publishedView
ES Appendix 2.1 - Outline - CEMP - November 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 5.1 - LVIA methodology and criteria - October 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 5.4 - Viewpoint analysis - October 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 5.2 - Visuals methodology - October 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 7.4 - Soundscape - November 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 7.3 - Noise Briefing Note - November 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 8.1 - Preliminary Ecological Appraisal Part 4 - June 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 8.4 - Badger survey REDACTED - May 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 8.6 - Bat surveys Part 1 - June 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 8.3 - Invertebrate Surveys - October 2022 - EAFSupporting DocumentNot publishedView
ES Appendix 8.6 - Bat surveys Part 6 - June 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 8.7 - Great crested newt survey - May 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 8.10 - Dormouse survey - May 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 10.1 - PRA Part 4 - October 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 10.1 - PRA Part 6 - October 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 10.1 - PRA Part 7 - October 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 10.1 - PRA Part 9 - October 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 10.1 - PRA Part 11 - October 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 10.1 - PRA Part 14 - October 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 10.1 - PRA Part 17 - October 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 10.1 - PRA Part 18 - October 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 10.3 - Peat Technical Note - September 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 10.2 - Historical BGS borehole logs - 1959 - EAFSupporting DocumentNot publishedView
ES Appendix 11.2 - Draft WSI - October 2024 - EAFSupporting DocumentNot publishedView
ES Appendix 12.2 - Link reference points - 03 May 2024 - EAFSupporting DocumentNot publishedView
ES Chapter 1 - Introduction - November 2024 - EAFSupporting DocumentNot publishedView
ES Chapter 4 - Environmental Assessment Methodology - November 2024 - EAFSupporting DocumentNot publishedView
ES Chapter 6 - Air Quality - November 2024 - EAFSupporting DocumentNot publishedView
ES Figure 3.1 - Environmental Constraints Plan - 16 August 2024 - EAFSupporting DocumentNot publishedView
ES Figure 2.4 - Landscape Proposals Part 2 - 21 October 2024 - EAFSupporting DocumentNot publishedView
ES Figure 2.6 - Existing Site Uses - 15 October 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.1 - ZTV and Viewpoints Overview - 6 September 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.7 - Access and Key Routes - 6 September 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.9 - Viewpoint 1a-c - October 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.12 - Viewpoint 4a-c - October 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.15 - Viewpoint 7a-c - October 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.14 - Viewpoint 6a-c - October 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.18 - Viewpoint 10a-c - October 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.20 - Viewpoint 12a-c - October 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.28 - Viewpoint 20a-c - October 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.29 - Viewpoint 21a-c - October 2024- EAFSupporting DocumentNot publishedView
ES Figure 5.27 - Viewpoint 19a-c - October 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.31 - Viewpoint 23a-c - October 2024 - EAFSupporting DocumentNot publishedView
ES Figure 5.33 - Viewpoint 25a-c - October 2024 - EAFSupporting DocumentNot publishedView
ES Figure 6.5 - Air Quality Study Area - 20 August 2024 - EAFSupporting DocumentNot publishedView
ES Figure 9.12 - Watercourse Diversion - 6 September 2024 - EAFSupporting DocumentNot publishedView
ES Figure 10.1 - Site Layout Plan - 16 August 2024 - EAFSupporting DocumentNot publishedView
ES Figure 10.2 - Site Feature Plan - 16 August 2024 - EAFSupporting DocumentNot publishedView
ES Figure 14.3 - Income Deprivation by LSOA - 16 August 2024 - EAFSupporting DocumentNot publishedView
ES Figure 14.7 - Education Deprivation by LSOA - 16 August 2024 - EAFSupporting DocumentNot publishedView
ES Figure 16.1 - Location of Shortlisted Committed Developments - 12 September 2024 - EAFSupporting DocumentNot publishedView
ES Figure 14.6 - Employment Deprivation by LSOA - 16 August 2024 - EAFSupporting DocumentNot publishedView
Existing Site Uses - 900002 - P01 - EAFDrawings - PlansNot publishedView
Green Infrastructure Statement - EAFSupporting DocumentNot publishedView
Indicative Lighting Layout - Outline - 900051 - P00 - EAFDrawings - PlansNot publishedView
Outline Drainage Strategy - Rev D - EAF - Part 1Supporting DocumentNot publishedView
Light Pollution Study - 6481 - R01 - LP02 - EAFSupporting DocumentNot publishedView
Outline Drainage Strategy - Rev D - EAF - Part 4Supporting DocumentNot publishedView
Pre-Application Consultation Report - EAF - Part 2Supporting DocumentNot publishedView
Proposed Site Levels - 900004 - P00 - EAFDrawings - PlansNot publishedView
Proposed Site Plan - Hybrid Planning Application - 900009 - P07 - EAFDrawings - PlansNot publishedView
Site Sections - 063001 - P03 - EAFDrawings - PlansNot publishedView
Sustainability Statement - EAFSupporting DocumentNot publishedView
Unit 02 - Consteel Conveyor - Proposed Ground Floorplan - 061001 - P01 - EAFDrawings - PlansNot publishedView
Unit 04 - Shredded Scrap Yard - Proposed GAs - 060001 - P02 - EAFDrawings - PlansNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approved
Decision Notice Rev 25 Decision Notice - REVISION 24 Decision Notice REV 23 Decision Notice REV 22 Decision Notice REV 21 Decision Notice REVISION 20 - Revision 19 Decision Notice - REVISION 16 Decision Notice - REVISION 17 Decision Notice REV 15 Decision Notice REV 14 Decision Notice REVISION 12 Decision Notice REVISION 9 DN P2024-0711 Rev 11 Decision Notice REVISION 10 Decision Notice REVISION 8 Decision Notice REVISION 7 Decision Notice REV 6 Decision Notice REV 5 Decision Notice REVISION 4 Decision Notice REV 3 DN P2024-0711 Rev 1 Decision Notice REVISION 2 Decsion Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.