Council planning record

Application made to the Welsh Ministers under The Developments of National Significance (Wales) Regulations 2016 Notice for a Development of National Significance (DNS) :The proposed development comprises 7 wind turbines. 4 turbines will have a maximum tip height of 149.9m and 3 will have a maximum tip height of 130m which together will have a capacity of approximately 25.2MW.The development also include an improved site entrance, new crane hard standings, control building and substation compound, electricity transformers, underground cabling, energy storage containers, drainage works and upgrades to existing forestry tracks and associated tree felling. (further information received 26/03/2021)

Upper Ogmore Wind Farm And Energy Storage Facility

DecidedReference: P2020/1002Neath Port Talbot County Borough Council

Last published check: 2 Oct 2026, 13:52. Check the council record for more recent changes.

Application location

Upper Ogmore Wind Farm And Energy Storage Facility

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Nat. Sig. Infrastructure Project/DNS
Received
4 Nov 2020
Validated
10 Dec 2020
Determination deadline
3 Feb 2021
Local authority
Neath Port Talbot County Borough Council

Application overview

Application made to the Welsh Ministers under The Developments of National Significance (Wales) Regulations 2016 Notice for a Development of National Significance (DNS) :The proposed development comprises 7 wind turbines. 4 turbines will have a maximum tip height of 149.9m and 3 will have a maximum tip height of 130m which together will have a capacity of approximately 25.2MW.The development also include an improved site entrance, new crane hard standings, control building and substation compound, electricity transformers, underground cabling, energy storage containers, drainage works and upgrades to existing forestry tracks and associated tree felling. (further information received 26/03/2021)

Proposal details

Reference
P2020/1002
Ward
Gwynfi & Croeserw
Parish
Port Talbot

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 202 of 202

DocumentPublishedAction
DNS-3213662-000374-20210317 RES to PINS DNS3213662Supporting DocumentNot publishedView
DNS-3213662-000386-Planning Statement Further AddendumSupporting DocumentNot publishedView
DNS-3213662-000382-RES Response to Local Impact Reports - IntroductionSupporting DocumentNot publishedView
DNS-3213662-000385-RES Response to Local Impact Reports - Appendix I Miscellaneous ConditionsSupporting DocumentNot publishedView
DNS-3213662-000381-RES Response to Local Impact Reports - Appendix G ContaminationSupporting DocumentNot publishedView
DNS-3213662-000383-RES Response to Comments by the Open Spaces SocietySupporting DocumentNot publishedView
DNS-3213662-000380-RES Response to Local Impact Reports - Appendix D Peat and HydrologySupporting DocumentNot publishedView
DNS-3213662-000378-RES Response to Local Impact Reports - Appendix C BiodiversitySupporting DocumentNot publishedView
DNS-3213662-000379-RES Response to Local Impact Reports - Appendix E NoiseSupporting DocumentNot publishedView
DNS-3213662-000375-RES Response to Local Impact Reports - Appendix F Cultural HeritageSupporting DocumentNot publishedView
DNS-3213662-000377-RES Response to Local Impact Reports - Appendix A Landscape and VisualSupporting DocumentNot publishedView
DNS-3213662-000384-RES Response to Local Impact Reports - Appendix B Traffic, Transport and AccessTraffic, Transportation and AccessSupporting DocumentNot publishedView
DNS-3213662-000376-RES Response to Local Impact Reports - Appendix H PlanningSupporting DocumentNot publishedView
03 Notice under Article 9(3)Forms and CertificatesNot publishedView
Figure 08.01 Peat Depth MapDrawings - PlansNot publishedView
Figure 05.08 Access and RecreationDrawings - PlansNot publishedView
Figure 05.01 Planning Application Boundary and SSA BoundaryDrawings - PlansNot publishedView
Figure 03.04 Crane Hardstanding General ArrangementDrawings - PlansNot publishedView
04 Figure 03.02 Wind Turbine ElevationDrawings - PlansNot publishedView
Figure 03.11 Indicative Borrow Pit DetailsDrawings - PlansNot publishedView
Appendix 10.4 Propagation Height _ Valley EffectSupporting DocumentNot publishedView
Figure 07.06 Designated Historic Assets ZTVDrawings - PlansNot publishedView
Figure 06.01 VP LocationsDrawings - PlansNot publishedView
Figure 03.14 Preliminary Grid Connection RouteDrawings - PlansNot publishedView
00 Table of FiguresDrawings - PlansNot publishedView
Figure 12.01 Public Rights of Way DiversionsDrawings - PlansNot publishedView
Figure 05.09 Assessed Existing and Proposed Wind FarmsDrawings - PlansNot publishedView
Figure 05.02 Study AreaDrawings - PlansNot publishedView
11 - Shadow Flicker _ Reflected LightSupporting DocumentNot publishedView
01 Non Technical SummaryDrawings - PlansNot publishedView
Figure 03.03 Wind Turbine FoundationDrawings - PlansNot publishedView
Appendix 05.4 Landscape assessmentSupporting DocumentNot publishedView
Figure 10.01 Predicted Noise FootprintDrawings - PlansNot publishedView
Figure 07.05 Registered Parks and Gardens 10kmDrawings - PlansNot publishedView
Figure 05.21 VP10Drawings - PlansNot publishedView
PAC Report - October 2020Supporting DocumentNot publishedView
Appendix 06.3 Ecology and Ornithology Survey Reports V2Supporting DocumentNot publishedView
Appendix 10.3 Calculating Standardised Wind SpeedSupporting DocumentNot publishedView
Appendix 06.1 Relevant Planning Policy and LegislationSupporting DocumentNot publishedView
Appendix 05.2 LVIA MethodologySupporting DocumentNot publishedView
Figure 07.09 Historic Landscape Character Areas ZTVDrawings - PlansNot publishedView
Figure 07.02a GGAT HER NMRW entries Prehistoric to Medieval 1kmDrawings - PlansNot publishedView
Figure 07.02b GGAT HER entries Post Medieval to Modern 1kmDrawings - PlansNot publishedView
Figure 06.10 Winter WalkoverDrawings - PlansNot publishedView
Figure 06.05 Designated SitesDrawings - PlansNot publishedView
Figure 05.16 VP5Drawings - PlansNot publishedView
Figure 05.19 VP8Drawings - PlansNot publishedView
Figure 05.06e(i) LANDMAP Aspect Areas - Visual and SensoryDrawings - PlansNot publishedView
Figure 05.06c(ii) LANDMAP Aspect Areas - Historic Landscape Blade Tip ZTVDrawings - PlansNot publishedView
Figure 03.01 Infrastructure LayoutDrawings - PlansNot publishedView
Figure 03.07 Energy Storage Layout PlanDrawings - PlansNot publishedView
08 - Hydrology and HydrogeologySupporting DocumentNot publishedView
04 - Planning Policy and ContextSupporting DocumentNot publishedView
Figure 03.06 Substation Building and CompoundDrawings - PlansNot publishedView
Figure 05.26 VP15Drawings - PlansNot publishedView
03 Figure 12.2a Common Land Swap PlanDrawings - PlansNot publishedView
Figure 03.02 Wind Turbine ElevationDrawings - PlansNot publishedView
Appendix 10.1 Assessment of Energy Storage FacilitySupporting DocumentNot publishedView
Appendix 10.6 Instrumentation RecordsSupporting DocumentNot publishedView
Appendix 10.2 Scope of AssessmentSupporting DocumentNot publishedView
Appendix 03.1 - Potential Grid ConnectionSupporting DocumentNot publishedView
Figure 12.2a Common Land Swap PlanDrawings - PlansNot publishedView
Figure 06.11b BBS EastDrawings - PlansNot publishedView
Figure 05.11 Cumulative Blade Tip ZTVDrawings - PlansNot publishedView
Figure 05.06e(ii) LANDMAP Aspect Areas - Visual and Sensory Blade Tip ZTVDrawings - PlansNot publishedView
Figure 03.13 Typical Wind Farm Communication Mast DetailsDrawings - PlansNot publishedView
06 Figure 03.08 Energy Storage ElevationsDrawings - PlansNot publishedView
Appendix 10.8 Suggested Planning Conditions - NoiseSupporting DocumentNot publishedView
Figure 05.06d(i) LANDMAP Aspect Areas - Cultural LandscapeDrawings - PlansNot publishedView
Figure 03.06 Substation Building and CompoundDrawings - PlansNot publishedView
00 PrefaceSupporting DocumentNot publishedView
05 Figure 03.07 Energy Storage Layout PlanDrawings - PlansNot publishedView
Figure 05.01 Planning Application Boundary and SSA BoundaryDrawings - PlansNot publishedView
Figure 09.03 Forestry Track Widening Pen y Cymoedd Wind Farm to SiteDrawings - PlansNot publishedView
Figure 12.2b Common Land Swap PlanDrawings - PlansNot publishedView
Figure 05.10 Paired Blade Tip ZTV Upper Ogmore and Llynfi AfanDrawings - PlansNot publishedView
Figure 03.08 Energy Storage ElevationsDrawings - PlansNot publishedView
Figure 07.07 Designated Historic Assets Stage 2Drawings - PlansNot publishedView
09 - Traffic Transport and AccessSupporting DocumentNot publishedView
Figure 06.08 NVCDrawings - PlansNot publishedView
Figure 01.01 Site LocationDrawings - PlansNot publishedView
Figure 02.03 Turbine Layout EvolutionDrawings - PlansNot publishedView
Figure 03.02 Wind Turbine ElevationDrawings - PlansNot publishedView
Figure 06.02 Honey buzzard VPDrawings - PlansNot publishedView
Figure 03.07 Energy Storage Layout PlanDrawings - PlansNot publishedView
Figure 06.06 Phase 1 SiteDrawings - PlansNot publishedView
Figure 05.06a(i) LANDMAP Aspect Areas - Geological LandscapeDrawings - PlansNot publishedView
02 Figure 01.01 Site LocationDrawings - PlansNot publishedView
06 - Ecology and Biodiversity V2Supporting DocumentNot publishedView
Figure 03.05 Access Track Typical DetailsDrawings - PlansNot publishedView
Figure 05.03b Tip Height ZTV 5kmDrawings - PlansNot publishedView
Figure 05.05 Landscape Character AreasDrawings - PlansNot publishedView
Figure 05.14 VP3Drawings - PlansNot publishedView
Figure 05.24 VP13Drawings - PlansNot publishedView
Figure 07.03 Scheduled Monuments 10kmDrawings - PlansNot publishedView
Appendix 03.2 Sustainable Drainage Management PlanSupporting DocumentNot publishedView
Appendix 2aSupporting DocumentNot publishedView
07 Figure 12.01 Public Rights of Way DiversionsDrawings - PlansNot publishedView
03 - Proposed DevelopmentSupporting DocumentNot publishedView
Figure 03.03 Wind Turbine FoundationDrawings - PlansNot publishedView
Figure 06.10 Winter WalkoverDrawings - PlansNot publishedView
Figure 06.09d 2020 FlightlinesDrawings - PlansNot publishedView
Figure 06.11a BBS WestDrawings - PlansNot publishedView
Figure 07.10a Rhondda Registered Landscape ZTVDrawings - PlansNot publishedView
Figure 10.02 Predicted Cumulative Noise FootprintDrawings - PlansNot publishedView
Appendix 05.1 ConsultationSupporting DocumentNot publishedView
Appendix 10.7 ChartsSupporting DocumentNot publishedView
Figure 09.04 Typical Forestry Track Widening DetailDrawings - PlansNot publishedView
06 Appendix 2Drawings - PlansNot publishedView
07- Cultural Heritage V2Supporting DocumentNot publishedView
Figure 03.09 Site EntranceDrawings - PlansNot publishedView
Figure 05.06d(ii) LANDMAP Aspect Areas - Cultural Landscape Blade Tip ZTVDrawings - PlansNot publishedView
Figure 07.04 Listed Buildings 10kmDrawings - PlansNot publishedView
Appendix 01.3 - Scoping Summary tableSupporting DocumentNot publishedView
Appendix 06.2 Consultation Meeting Minutes and Responses_Supporting DocumentNot publishedView
Figure 03.04 Crane Hardstanding General ArrangementDrawings - PlansNot publishedView
Figure 03.09 Site EntranceDrawings - PlansNot publishedView
10 - AcousticSupporting DocumentNot publishedView
Figure 02.02 Turbine LayoutDrawings - PlansNot publishedView
Figure 05.04a Hub Height ZTV 15kmDrawings - PlansNot publishedView
Figure 05.06a(ii) LANDMAP Aspect Areas - Geological Landscape Blade Tip ZTVDrawings - PlansNot publishedView
Figure 06.07 Access SurveyDrawings - PlansNot publishedView
Figure 06.04 Ponds and Water VoleDrawings - PlansNot publishedView
Appendix 05.5 Viewpoint assessmentSupporting DocumentNot publishedView
Design and Access StatementDrawings - PlansNot publishedView
02 Figure 12.01 Public Rights of Way DiversionsDrawings - PlansNot publishedView
05 Appendix 1Drawings - PlansNot publishedView
Figure 05.06b(ii) LANDMAP Aspect Areas - Landscape Habitat Blade Tip ZTVDrawings - PlansNot publishedView
Figure 05.13 VP2Drawings - PlansNot publishedView
Figure 05.28 VP17Drawings - PlansNot publishedView
Figure 06.03b Bats 2019Drawings - PlansNot publishedView
Figure 09.02 Delivery AnalysisDrawings - PlansNot publishedView
Appendix 01.2 Scoping DirectionSupporting DocumentNot publishedView
Appendix 01.1 Scoping ReportSupporting DocumentNot publishedView
Appendix 06.4 - Collision Risk Analysis V2Supporting DocumentNot publishedView
Appendix 07.1 Archaeological Desk Based AssessmentSupporting DocumentNot publishedView
Figure 05.09 Assessed Existing and Proposed Wind FarmsDrawings - PlansNot publishedView
Appendix 2bSupporting DocumentNot publishedView
Figure 06.09b KestrelDrawings - PlansNot publishedView
Figure 09.04 Typical Forestry Track Widening DetailDrawings - PlansNot publishedView
01 Commons Act Section 16 Application FormDrawings - PlansNot publishedView
Appendix 1Supporting DocumentNot publishedView
Figure 05.22 VP11Drawings - PlansNot publishedView
Figure 05.17 VP6Drawings - PlansNot publishedView
Figure 07.10b Margam Mountain Registered Landscape ZTVDrawings - PlansNot publishedView
Figure 02.03 Turbine Layout EvolutionDrawings - PlansNot publishedView
Figure 02.01 Key Constraints and InfrastructureDrawings - PlansNot publishedView
04 Notice under Article 16(1)Forms and CertificatesNot publishedView
05 - Landscape and VisualSupporting DocumentNot publishedView
Figure 02.04 Site Access Options PlanDrawings - PlansNot publishedView
Figure 03.11 Indicative Borrow Pit DetailsDrawings - PlansNot publishedView
Figure 05.03a Tip Height ZTV 15kmDrawings - PlansNot publishedView
Figure 05.06b(1) LANDMAP Aspect Areas - Landscape HabitatsDrawings - PlansNot publishedView
Figure 05.29 VP18Drawings - PlansNot publishedView
Figure 06.03a Bats 2015-18Drawings - PlansNot publishedView
Figure 06.09a Red KiteDrawings - PlansNot publishedView
Appendix 10.5 Background Noise Survey PhotosSupporting DocumentNot publishedView
Figure 03.05 Access Track Typical DetailsDrawings - PlansNot publishedView
Figure 03.01 Infrastructure LayoutDrawings - PlansNot publishedView
Figure 02.01 Key Constraints and InfrastructureDrawings - PlansNot publishedView
Figure 03.10 Temporary Construction Compound Layout PlanDrawings - PlansNot publishedView
Figure 05.23 VP12Drawings - PlansNot publishedView
Figure 05.15 VP4Drawings - PlansNot publishedView
Figure 07.08 Historic Landscape Character Areas 10kmDrawings - PlansNot publishedView
Appendix 02.1 Ground Investigation Report N Brown 2016Supporting DocumentNot publishedView
Figure 01.02 Planning Application BoundaryDrawings - PlansNot publishedView
Figure 05.07 Landscape DesignationsDrawings - PlansNot publishedView
Figure 05.12 VP1Drawings - PlansNot publishedView
Figure 05.18 VP7Drawings - PlansNot publishedView
Figure 05.20 VP9Drawings - PlansNot publishedView
Figure 05.25 VP14Drawings - PlansNot publishedView
Figure 07.02c NMRW entries Post Medieval to Modern 1kmDrawings - PlansNot publishedView
Figure 06.11b BBS EastDrawings - PlansNot publishedView
Figure 07.01 Site Location PlanDrawings - PlansNot publishedView
Figure 09.01 Abnormal Load Delivery RouteDrawings - PlansNot publishedView
04 Figure 12.2b Common Land Swap PlanDrawings - PlansNot publishedView
Appendix 4Supporting DocumentNot publishedView
05 DNS 3213662 Application FormForms and CertificatesNot publishedView
03 Figure 03.01 Infrastructure LayoutDrawings - PlansNot publishedView
12 - Socio-economicsSupporting DocumentNot publishedView
13 - Schedule of MitigationSupporting DocumentNot publishedView
Appendix 05.3 LANDMAPSupporting DocumentNot publishedView
Figure 03.08 Energy Storage ElevationsDrawings - PlansNot publishedView
00 Planning StatementDrawings - PlansNot publishedView
01 Acceptance of NotificationForms and CertificatesNot publishedView
02 - Design Evolution _ AlternativesSupporting DocumentNot publishedView
Figure 03.12 Cable Trench DetailsDrawings - PlansNot publishedView
Figure 05.06c(i) LANDMAP Aspect Areas - Historic LandscapeDrawings - PlansNot publishedView
Figure 05.27 VP16Drawings - PlansNot publishedView
Figure 06.11a BBS WestDrawings - PlansNot publishedView
Figure 06.09c Other SpeciesDrawings - PlansNot publishedView
Appendix 02.2 Ground Investigation Report RSK 2018Supporting DocumentNot publishedView
Appendix 07.2 ASIDOHLv2 AssessmentSupporting DocumentNot publishedView
Figure 03.10 Temporary Construction Compound Layout PlanDrawings - PlansNot publishedView
Figure 01.01 Site LocationDrawings - PlansNot publishedView
Appendix 3Supporting DocumentNot publishedView
02 Notice under Articles 8 and 9-2Forms and CertificatesNot publishedView
01 - IntroductionSupporting DocumentNot publishedView
Figure 01.02 Planning Application BoundaryDrawings - PlansNot publishedView
Figure 05.04b Hub Height ZTV 5kmDrawings - PlansNot publishedView
Figure 12.01 Public Rights of Way DiversionsDrawings - PlansNot publishedView
Appendix 03.3 Carbon Balance AssessmentSupporting DocumentNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Standard Consultation Date

    Published milestoneCouncil source
  5. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Issued Date

    Published milestoneCouncil source
  7. Decision Made Date

    Published milestoneCouncil source
  8. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approved
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.