Scotland · Local authority

Na h-Eileanan Siar
Planning applications.

Explore collected planning applications and decisions for Na h-Eileanan Siar. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
12,173Searchable applications
76Recorded as pending
99%Approval rate · 9,736 approved or refused records
141Refused applications

9,595 approved · 141 refused · 0 withdrawn. Received dates in our records: 23 Dec 1993 to 8 Oct 2026. Most recent record check: 15 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas4 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Decided15/00103/PPD

    Renovate house

    6 - 7 North Glendale Lochboisdale Isle Of South Uist

    Received 20 Mar 2015
  2. Decided15/00104/PPD

    Install 2 footbridges at Bagh na Fiadh and Ath Cumhang

    Walking Trail West Gerinish To Lochcarnan West Gerinish Isle Of South Uist

    Received 20 Mar 2015
  3. Decided15/00105/PPD

    Erect detached garage

    41 Back Isle Of Lewis HS2 0LQ

    Received 23 Mar 2015
  4. Decided15/00106/PPD

    Extend dwelling, erect garage and form new vehicular access

    16A Portnaguran Point Isle Of Lewis HS2 0HD

    Received 23 Mar 2015
  5. Decided15/00107/PPD

    Extension to building

    Post Office Kenneth Drive Lochboisdale Isle Of South Uist HS8 5TJ

    Received 24 Mar 2015
  6. Decided15/00108/PPD

    Erect house

    5A Maraig Isle Of Harris

    Received 24 Mar 2015
  7. Decided15/00110/PPD

    Erect Extension

    16 Steinish Isle Of Lewis HS2 0AA

    Received 25 Mar 2015
  8. Decided15/00111/PPD

    Erect house and garage

    2A Peninerine Isle Of South Uist

    Received 27 Mar 2015
  9. Decided15/00112/PPD

    Extension to existing Keder polytunnel

    East Camp Balivanich Isle Of Benbecula

    Received 26 Mar 2015
  10. Decided15/00113/PPD

    Renovation & extension to existing house

    233 Upper Bruernish Northbay Isle Of Barra HS9 5UY

    Received 25 Mar 2015
  11. Decided15/00114/AGRIC

    Erect agricultural building

    Agricultural Building 55 South Bragar Bragar Isle Of Lewis

    Received 27 Mar 2015
  12. Decided15/00116/PPD

    Alter and extend house

    17 South Dell Ness Isle Of Lewis HS2 0SP

    Received 30 Mar 2015
  13. Decided15/00117/PPD

    Erect storage barn to store road de-icing rock salt and creation of secure compound with two temporary office units and parking area

    Salt Barn Marybank Isle Of Lewis

    Received 30 Mar 2015
  14. Decided15/00115/FULTEL

    Erection of antenna mast (approx.12m)

    SSC Antenna Mast Pier Miavaig Uig Isle Of Lewis

    Received 30 Mar 2015
  15. Decided15/00118/FFSCSC

    Replace the 12 100m circle pens with 12 120m circle pens in an altered position that will allow for better operations at the site and an increase in the maximum biomass

    Marine Harvest Marine Site Marulaig Bay Fish Farm North Glendale Lochboisdale Isle Of South Uist

    Received 31 Mar 2015
  16. Decided15/00119/TEL

    Install cabinet for fixed broadband electronic communications equipment

    Telecommunications Equipment Tong Road Tong Isle Of Lewis

    Received 24 Mar 2015
  17. Decided15/00120/PPD

    Erect house, install air source heat pump & roof solar panels

    Taigh Nan Dealbh Bornish Isle Of South Uist

    Received 2 Apr 2015
  18. Decided15/00121/PPD

    New recycling warehouse building, Iso tank bund with shelter, yard hard standing to accommodate vehicle movements, additional parking provision, all associated drainage including interceptor tanks and recycling skip area

    B A S F Pharma Callanish Ltd The Factory Breasclete Isle Of Lewis HS2 9ED

    Received 2 Apr 2015
  19. Decided15/00122/PPD

    External painting to rear elevation of building

    An Lanntair Kenneth Street Stornoway Isle Of Lewis HS1 2DS

    Received 7 Apr 2015
  20. Decided15/00123/SCR_L

    Winning/working minerals

    Traigh Sanda Sand Pit Eoropie Ness Isle Of Lewis

    Received 7 Apr 2015
  21. Decided15/00124/PPD

    Application under Section 42 to vary Condition 3 of consent 07/00256 (amend condition to retain caravans on site over summer season)

    Caravan Park Horgabost Isle Of Harris HS3 3HR

    Received 8 Apr 2015
  22. Decided15/00126/PAN

    Erect 8 wind turbine generators (approx 126.5m to tip) with associated infrastructure to include site access, tracks, crane hardstandings, temporary construction compound,a sub station/control building and underground cabling

    Sidhean Mor Wind Farm Pentland Road To Achmore Achmore Isle Of Lewis

    Received 7 Apr 2015
  23. Decided15/00127/PPD

    Erect domestic garage

    Garage 33 Parkend Sandwick Isle Of Lewis

    Received 8 Apr 2015
  24. Decided15/00128/FULTEL

    Radwin antennas and one wireless access point to be fitted onto two poles attached to the ferry terminal building at a height of approx 7m AGL. One external access point to be mounted onto CalMac's DOT Matrix sign at slipway entrance at a height of approx 5m AGL.

    Ceann A Gharraidh Waiting Room Coilleag Eriskay Isle Of South Uist

    Received 9 Apr 2015

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Na h-Eileanan Siar

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Na h-Eileanan Siar, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage