Scotland · Local authority

Moray
Planning applications.

Explore collected planning applications and decisions for Moray. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
7,667Searchable applications
240Recorded as pending
95%Approval rate · 6,590 approved or refused records
322Refused applications

6,268 approved · 322 refused · 591 withdrawn. Received dates in our records: 20 Feb 2017 to 12 Oct 2026. Most recent record check: 13 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas18 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Decided22/00210/APP

    Demolish conservatory and erect replacement extension to rear at

    9 Wittet Drive Elgin Moray IV30 1SE

    Received 15 Feb 2022
  2. Decided22/00211/APP

    Change of use and alteration of first floor from offices to two flats at

    98 High Street Forres Moray IV36 1NX

    Received 15 Feb 2022
  3. Decided22/00214/LBC

    Alteration of first floor from offices to two flats at

    98 High Street Forres Moray IV36 1NX

    Received 16 Feb 2022
  4. Decided22/00215/APP

    Erect dwellinghouse on

    Land Adjacent To Easter Covesea Cottage Duffus Moray

    Received 16 Feb 2022
  5. Decided22/00220/APP

    Erect dwellinghouse on

    Plot 2 The Paddock Tombain Aberlour Moray

    Received 17 Feb 2022
  6. Decided22/00221/APP

    Extension to dwelling

    27 Brinuth Place Elgin Moray IV30 6YW

    Received 17 Feb 2022
  7. Decided22/00222/APP

    Sun lounge added approved property ref 09/01266/FUL on

    Plot 8 Meadow View Garmouth Moray

    Received 17 Feb 2022
  8. Decided22/00223/APP

    Erection of general purpose agricultural building at

    Badnafrave Farm Ballindalloch Moray AB37 9ES

    Received 17 Feb 2022
  9. Decided22/00224/APP

    Relocate and amend design of dwellinghouse approved under ref 08/02006/FUL on site

    Adjacent To Steading Muir Of Ruthrie Aberlour Moray

    Received 17 Feb 2022
  10. Decided22/00227/APP

    Erect 3no glamping pods at

    Blackmyre Farm Dallas Forres Moray IV36 2RZ

    Received 18 Feb 2022
  11. Unknown22/00237/PNOT

    Upgrade access tracks at

    Gateside Wood Mulben Keith Moray

    Received 21 Feb 2022
  12. Decided22/00238/APP

    Erect dwellinghouse on

    Site 3 Bydand Walk Keith Moray

    Received 21 Feb 2022
  13. Decided22/00239/APP

    Construction of new pot ale processing plant and associated reception office and associated roads and hardstandings on

    Site 12 Elgin Business Park Elgin Moray

    Received 21 Feb 2022
  14. Decided22/00242/APP

    Alter and extend dwellinghouse at

    68 Murrayfield Fochabers Moray IV32 7EZ

    Received 21 Feb 2022
  15. Decided22/00247/LBC

    Alterations and refurbishment to existing semi detached property to form one additional dwelling at

    The Old Hall And Hall Cottage Forres Moray IV36 2QU

    Received 22 Feb 2022
  16. Decided22/00248/ADV

    Erect replacement gantry signs at

    Tesco Stores Ltd High Street Buckie Moray AB56 4AB

    Received 22 Feb 2022
  17. Decided22/00249/APP

    Erection of a marquee building from April to July at

    Glenfiddich Distillery Castle Road Dufftown Keith Moray AB55 4DH

    Received 22 Feb 2022
  18. Decided22/00260/APP

    Replacement boiler at

    Ardgye House Elgin Moray IV30 8UP

    Received 23 Feb 2022
  19. Decided22/00261/LBC

    Form opening in internal load bearing wall at

    81 High Street Fochabers Moray IV32 7DH

    Received 23 Feb 2022
  20. Decided22/00263/APP

    Erect barrier at

    Coleburn Distillery Longmorn Elgin Moray IV30 8SN

    Received 24 Feb 2022
  21. Decided22/00264/LBC

    Erect an external sign at

    Coleburn Distillery Longmorn Elgin Moray IV30 8SN

    Received 24 Feb 2022
  22. Decided22/00265/LBC

    Installation of external sign at

    Excise Cottage Longmorn Elgin Moray IV30 8SN

    Received 24 Feb 2022
  23. Decided22/00266/APP

    Erect a barrier at

    Coleburn Distillery Longmorn Elgin Moray IV30 8SN

    Received 24 Feb 2022
  24. Decided22/00267/ADV

    Erect sign at main entrance at

    Coleburn Distillery Longmorn Elgin Moray IV30 8SN

    Received 24 Feb 2022

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Moray

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Moray, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage