Scotland · Local authority

Moray
Planning applications.

Explore collected planning applications and decisions for Moray. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
7,046Searchable applications
229Recorded as pending
95%Approval rate · 6,043 approved or refused records
283Refused applications

5,760 approved · 283 refused · 549 withdrawn. Received dates in our records: 4 Oct 2017 to 8 Oct 2026. Most recent record check: 11 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas18 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Decided19/00182/APP

    Site a temporary static caravan on the site during the construction of house at

    Covesea Links Golf Course Lossiemouth Elgin Moray IV30 5QS

    Received 19 Feb 2019
  2. Decided19/00183/APP

    Demolish existing conservatory erect first floor extension and internal alterations at

    Auchinhandoch Dufftown Keith Moray AB55 4DR

    Received 19 Feb 2019
  3. Decided19/00184/APP

    Extend dwellinghouse at

    12 Headland Rise Burghead Elgin Moray IV30 5HA

    Received 19 Feb 2019
  4. Decided19/00185/APP

    Erect a domestic garage at

    36 Hill Street Elgin Moray IV30 1AL

    Received 19 Feb 2019
  5. Decided19/00186/APP

    Proposed sun lounge at

    26 Binn View Buckie Moray AB56 4HL

    Received 20 Feb 2019
  6. Decided19/00189/PNOT

    Extend forestry track at

    Lonehill Road Knockando Estate Knockando Aberlour Moray AB38 7SD

    Received 19 Feb 2019
  7. Decided19/00191/APP

    Extend dwellinghouse at

    Wester Califer Forres Moray IV36 2RN

    Received 21 Feb 2019
  8. Decided19/00192/APP

    Construct 2no bay garage block at

    W G Catto Funeral Directors Linkwood Road Elgin Moray IV30 6RE

    Received 21 Feb 2019
  9. Decided19/00193/APP

    Erect dwellinghouse and detached garage on

    Site At Chapel Lane Lossiemouth Moray

    Received 21 Feb 2019
  10. Decided19/00195/APP

    Alter and extend dwellinghouse at

    35 Duff Street Hopeman Elgin Moray IV30 5RZ

    Received 22 Feb 2019
  11. Decided19/00197/APP

    Proposed alterations and extension at

    206 Seatown Cullen Buckie Moray AB56 4SJ

    Received 22 Feb 2019
  12. Decided19/00198/APP

    Erect agricultural building at

    Mossend Farm Mosstowie Miltonduff Elgin Moray IV30 8TU

    Received 22 Feb 2019
  13. Decided19/00199/LBC

    Proposed alterations and extension at

    206 Seatown Cullen Buckie Moray AB56 4SJ

    Received 22 Feb 2019
  14. Decided19/00201/APP

    Erect dwellinghouse on site within

    Garden Ground Of Boat Of Fiddich Craigellachie Aberlour Moray AB38 9RQ

    Received 22 Feb 2019
  15. Decided19/00202/APP

    Alter and extend dwellinghouse at

    Essil Farm Fochabers Moray IV32 7LE

    Received 22 Feb 2019
  16. Decided19/00203/APP

    Proposed sun room to rear at

    18 Broomhill Road Keith Moray AB55 5EX

    Received 25 Feb 2019
  17. Decided19/00204/APP

    Demolish existing garage and erect replacement garage at

    2 James Street Buckie Moray AB56 1RL

    Received 25 Feb 2019
  18. Decided19/00206/LBC

    Provide disabled access through existing boundary wall memorial grounds at

    War Memorial Balvenie Street Dufftown Moray

    Received 25 Feb 2019
  19. Decided19/00208/APP

    Internal alterations and change of use of office to escape room at

    14 Harrow Inn Close Elgin Moray IV30 1BP

    Received 27 Feb 2019
  20. Decided19/00209/APP

    Revise house design approved under refs: 11/01585/APP and 14/01585/APP on

    Site At Hillockhead Dallas Moray

    Received 27 Feb 2019
  21. Decided19/00210/APP

    Change of use from fish mongers to video production company at

    5 Culbard Street Elgin Moray IV30 1JT

    Received 27 Feb 2019
  22. Decided19/00211/APP

    Change of use of farm sheds to whisky cask warehouses at

    Viewfield Farm Craigellachie Aberlour Moray AB38 9QT

    Received 27 Feb 2019
  23. Unknown19/00212/PNOT

    Erect an agricultural store at

    Heldonside Elgin Moray IV30 8TZ

    Received 27 Feb 2019
  24. Decided19/00213/APP

    Change of use from playing fields to allotment site (revised access arrangements to previous consent 17/00143/APP) at

    Pinefield Playing Field Perimeter Road Elgin Moray

    Received 22 Feb 2019

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Moray

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Moray, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage