Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Teindland Forest Orton Fochabers Moray
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceErect up to 12 wind turbines 8 with maximum tip height of up to 230m and 4 with a maximum tip height of 200m associated foundations crane hardstandings BESS compund containing approximtely 19 battery containers with total capacity 85MW export capacity combination of new and upgraded tracks erect a metrological mast network of underground cabling new substation compound and one construction and store compound at
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsTeindland Forest Orton Fochabers Moray
This record has no verified map location.
View council map| Document | Published | Action |
|---|---|---|
| PRIVATE WATER SUPPLY - UPDATEDConsultation Response · PDF | 15 Oct 2025 | View |
| PRIVATE WATER SUPPLIES - HOLDINGConsultation Response · PDF | 10 Oct 2025 | View |
| TRANSPORTATION MANAGER - HOLDINGConsultation Response · PDF | 4 Sept 2025 | View |
| DEVELOPER OBLIGATIONSConsultation Response · PDF | 13 Aug 2025 | View |
| VOLUME 3 - TA A8.3 HERITAGE ASSESSTS WITHIN OUTER STUDY AREASupporting Document · PDF | 12 Aug 2025 | View |
| VOLUME 3 - TA A8.2 HERITAGE ASSESTS WITHIN OUTER STUDY AREASupporting Document · PDF | 12 Aug 2025 | View |
| VOLUME 3 - A2.1 SCOPING REPORTSupporting Document · PDF | 12 Aug 2025 | View |
| VOLUME 3 - A2.2 SCOPING OPINIONSupporting Document · PDF | 12 Aug 2025 | View |
| VOLUME 3 - A2.3 GATE CHECK REPORTSupporting Document · PDF | 12 Aug 2025 | View |
| VOLUME 3 - A4.1 FORESTRYSupporting Document · PDF | 12 Aug 2025 | View |
| VOLUME 3 - A4.2 OUTLINE CONSTRUCTION ENVIONMENTAL MANAGEMENT PLANSupporting Document · PDF | 12 Aug 2025 | View |
| VOLUME 3 - A5.1 METHODOLOGYSupporting Document · PDF | 12 Aug 2025 | View |
| VOLUME 3 - A5.2 NON SIGNIFICANT EFFECTSSupporting Document · PDF | 12 Aug 2025 | View |
| VOLUME 3 - A5.3 ILLUSTRATIVE VIEWSSupporting Document · PDF | 12 Aug 2025 | View |
| VOLUME 3 - A8.1 HERITAGE ASSESTS WITHIN INNER STUDY AREASupporting Document · PDF | 12 Aug 2025 | View |
| VOLUME 3 - A9.1 NOISE SURVEY RECORD SHEETSSupporting Document · PDF | 12 Aug 2025 | View |
| VOLUME 3 - A9.2 CONSTRUCTION NOISE PARAMETERSSupporting Document · PDF | 12 Aug 2025 | View |
| VOLUME 3 - A10.1 CARBON CALCULATOR INPUTSSupporting Document · PDF | 12 Aug 2025 | View |
| VOLUME 3 - A11.1 ABNORMAL LOAD ASSESSMENTSSupporting Document · PDF | 12 Aug 2025 | View |
| VOLUME 3 - A12.1 PEAT ASSESSMENT REPORTSupporting Document · PDF | 12 Aug 2025 | View |
| VOLUME 3 - A12.2 WATERCOURSE CROSSING INVENTORYSupporting Document · PDF | 12 Aug 2025 | View |
| VOLUME 3 - A13.1 INITIAL AVIATION ASSESSMENT & ADDENDUMSupporting Document · PDF | 12 Aug 2025 | View |
| VOLUME 3 - A13.3 AVIATION LIGHTING ASSESSMENTSupporting Document · PDF | 12 Aug 2025 | View |
| VOLUME 3 - A15.1 BATTERY SAFETY MANAGEMENT PLANSupporting Document · PDF | 12 Aug 2025 | View |
| VOLUME 3 -COVER PAGE & TABLE OF CONTENTSSupporting Document · PDF | 12 Aug 2025 | View |
| VOLUME 2A FIGURES - FIGURE 1.1 SITE LOCATIONSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A FIGURES - FIGURE 1.2 SITE BOUNDARYSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A FIGURES - FIGURE 3..2 ONSITE CONTRAINTSSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A FIGURES - FIGURE 3..3A SCOPING LAYOUTSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A FIGURES - FIGURE 3..3C DESIGN CHILLSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A FIGURES - FIGURE 3..3D DESIGN FREEZESupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A FIGURES - FIGURE 4.1 SITE LAYOUTSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A FIGURES - FIGURE 4.2 INDICATIVE TURBINE ELEVATIONS 200M TO TIPSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A FIGURES - FIGURE 4.2 INDICATIVE TURBINE ELEVATIONS 230M TO TIPSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES - FIGURE 4.23 TYPICAL TURBINE FOUNDATIONSSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES - FIGURE 4.4 TYPICAL CRANE PAD HARDSTADINGSSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES - FIGURE 4.5 TYPICAL CABLE TRENCH DETAILSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES - FIGURE 4.6 TYPICAL SUBSTATION LAYOUT & ELEVATIONSSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 4.7 TYPICAL BESS LAYOUTSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 4.8 TYPICAL CONTROL BUILDING & BESS ELEVATIONSSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 4.9 TYPICAL CONSTRUCTION COMPOUNDSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 4.10 TYPICAL TRACK DETAILSSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 4.11 TYPICAL WATERCOURSAE CROSSONGSSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 4.12 PROPOSED SITE ENTRANCESupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 4.13 TYPICAL METEOROLOGICAL MASTSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 5.1 ZTV BAREGROUNDSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 5.2 ZTVSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 5.3 TOPOGRAPHY & LANDCOVERSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 5.4 LANDSCAPE CHARTERSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 5.5 LANDSAPE CHARTER & ZTVSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 5.6 VISULA RECEPTORSSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 5.7 NIGHT TIMESupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 5.8 AVIATION LIGHTING ZTVSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 5.9 CUMULATIVE SITESSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 5.10 CULULATIVE ZTV- OPERATIONAL & CONSENTEDSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 5.11 CUMULATIVE ZTV - PLANNINGSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 6.2 LEPO WOODLAND WITHIN EXTENDED SURVEY BOUNARYSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 6.3 STATIC DETECTO LOCATIONSSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 6.5 DESIGNATED SITESSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 7.1 VANTAGE POINT LOCATIONS & VIEWSHEDSSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 7.2 BASELINE ORNITHOLOGY SURVEY AREASSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 7.3 SITE REGIONAL CONTEXT (NATURAL HEROTAGE ZONES)Supporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 7.4 STAUTORY DESIGNATED SITES WITH ORNITHOLOGY FEATURESSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 8.1 INNER STUDY AREASupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 8.2 ABNORMAL LOAD DELIVERY ROUTESupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 8.3 OUTER STUDY AREA WITH ZTV WITHOUT SCREENINGSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 8.4 OUTER STUDY AREA WITH ZTV WITH SCREENINGSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 9.1 NCPSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 11.1 STUDY AREASupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 11.2 TRAFFIC COUNTER LOCATIONSSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 11.3 ABNORMAL LOADS ROUTESupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 12.1Supporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 12.2Supporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 12.3Supporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 12.4Supporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 14.1 CORE PATHS & RECREATIONAL ROUTES WITHIN 5KMSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A - FIGURES 15.1 SHADOW FLICKER ASSESSMENTSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2A COVER PAGE AND TOCSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2B - CH1 CHURCH OF DUNDURCASS OLD PARISH CHURCHSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2B - CH2 BOGTON STONE CIRCLE 250M NW OF (SM 1215)Supporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2B - CH3 GORDON CAST AND CASTLE TOWERSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2B - CH4 ROTHES CASTLESupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2B - CH5 INNES HOUSE & GDLSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2B COVER PAGESupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2B - VP01 A941 NW OF ROTHESSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2B - VP02 PROVOST CHIRTIE DRIVE ROTHESSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2B - VP03 ROTHES GOLF COURSESupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2B - VP04 SPEYSIDE WAY NEAR WOODHEAD OF CAIRNTYSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2B - VP05 BEN AIGENSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2B - VP06 EATHR PILLARSSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2B - VP07 SPEYSIDE WAY FOCHABERSSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2B - VP08 MULBENSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2B - VP09 CRAIGELLACHIESupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2B - VP10 A941 AT ELGINSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2B - VP11 A96 WEST OF MOSSTODLOCHSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2B - VP12 MILTONDUFFSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2B - VP13 DUFFUS CASTLESupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2B - VP14 BEN RINNESSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2B - VP15 MEIKLE BALLOCH HILLSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2B - VP16 INCHBERRYSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2B - VP17 GORDON CASTLE WALLED GARDENSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2B - VP18 SPEY BAYSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2B - VP19 A95 SW OF CHARLESTON OF ABERLOURSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 2B - VP20 DUKE OF GORDON MONUMENTSupporting Document · PDF | 8 Aug 2025 | View |
| VOLUME 4 COVER PAGE & TABLE OF CONTENTSSupporting Document · PDF | 8 Aug 2025 | View |
| ENVIRONMENTAL IMPACT ASSESSMENT REPORT NON-TECHNICAL SUMMARYSupporting Document · PDF | 8 Aug 2025 | View |
| MORAY FLOOD RISK MANAGEMENTConsultation Response · PDF | 5 Aug 2025 | View |
| PLANNING STATEMENTSupporting Document · PDF | 4 Aug 2025 | View |
| COVERING LETTERCorrespondence to Council · PDF | 4 Aug 2025 | View |
| DESIGN AND ACCESS STATEMENTSupporting Document · PDF | 4 Aug 2025 | View |
| PRE APPLICATION CONSULATIONSupporting Document · PDF | 4 Aug 2025 | View |
| EIA REPORT - IINTRODUCTIONSupporting Document · PDF | 4 Aug 2025 | View |
| EIA REPORT - SITE SECTIONSSupporting Document · PDF | 4 Aug 2025 | View |
| EIA REPORT - DEVELOPMENT DESCRIPTIONSupporting Document · PDF | 4 Aug 2025 | View |
| EIA REPORT - LANDSCAPE & VISUAL IMPACT ASSESSMENTSupporting Document · PDF | 4 Aug 2025 | View |
| EIA REPORT - ORNITHOLOGYSupporting Document · PDF | 4 Aug 2025 | View |
| EIA REPORT - CULTURAL HERITAGESupporting Document · PDF | 4 Aug 2025 | View |
| EIA REPORT - NOISESupporting Document · PDF | 4 Aug 2025 | View |
| EIA REPORT - CLIMATE CHANGESupporting Document · PDF | 4 Aug 2025 | View |
| EIA REPORT - TRAFFICSupporting Document · PDF | 4 Aug 2025 | View |
| EIA REPORT - HYDROLOGYSupporting Document · PDF | 4 Aug 2025 | View |
| EIA REPORT - AVIATIONSupporting Document · PDF | 4 Aug 2025 | View |
| EIA REPORT - OTHER ISSUESSupporting Document · PDF | 4 Aug 2025 | View |
| EIA REPORT - MITIGATION SUMMARYSupporting Document · PDF | 4 Aug 2025 | View |
| EIA REPORT - GLOSSARY OF TERMSSupporting Document · PDF | 4 Aug 2025 | View |
| EIA REPORT - COVER PAGE AND TABLE OF CONTENTSSupporting Document · PDF | 4 Aug 2025 | View |
| EIA REPORT VOL 4 - EIA REPORT NON- TECHNICAL SUMMARYSupporting Document · PDF | 4 Aug 2025 | View |
| EIA REPORT VOL 4 - COVER PAGE & TABLE OF CONTENTSSupporting Document · PDF | 4 Aug 2025 | View |
| ABERDEENSHIRE ARCHAEOLOGY SERVICEConsultation Response · PDF | 24 Jul 2025 | View |
| CONTAMINATED LANDConsultation Response · PDF | 24 Jul 2025 | View |
Documents open on the council website. Browse council documents if a link has changed.
We haven’t collected any decision conditions for this application.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.