Council planning record

Construction of a 70 MWe electrolytic hydrogen production facility and associated ancillary infrastructure including water supply and wastewater pipeline on

Land South Of Marypark Ballindalloch Moray

DecidedReference: 25/00203/EIAMoray

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Last Advertised In Press Date

    Published milestoneCouncil source
  5. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Expiry Date for Comments

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Actual Committee Date

    Published milestoneCouncil source
  11. Decision Issued Date

    Published milestoneCouncil source
  12. Decision Made Date

    Published milestoneCouncil source
  13. Latest Neighbour Consultation Date

    Published milestoneCouncil source

Application summary

Status
Decided
Application type
Environmental Impact Assessment
Received
24 Feb 2025
Validated
3 Mar 2025
Determination deadline
3 Jul 2025
Local authority
Moray

Application overview

Construction of a 70 MWe electrolytic hydrogen production facility and associated ancillary infrastructure including water supply and wastewater pipeline on

Proposal details

Reference
25/00203/EIA
Alternative references
100691635-001
Ward
Speyside Glenlivet

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land South Of Marypark Ballindalloch Moray

This record has no verified map location.

View council map

Documents 123 of 123

DocumentPublishedAction
DECISION NOTICE - REFUSEDDecision · PDF15 Oct 2025View
REPORTCommittee Report · PDF31 Jul 2025View
INFORMATION PACKCommittee Report · PDF31 Jul 2025View
DRAINAGE GENERAL ARRANGEMENTRefused Plan · PDF24 Jul 2025View
SITE LAYOUT DRAWINGRefused Plan · PDF9 May 2025View
NATURE POSITIVE BIODIVERSITY REPORTSupporting Document · PDF2 Apr 2025View
BIODIVERSITY METRIC CALC (WITHOUT OFF SITE)Supporting Document2 Apr 2025View
BIODIVERSITY METRIC CALC (WITH OFF SITE)Supporting Document2 Apr 2025View
LANDSCAPE AND VISUAL IMPACT ASSESSMENT (LVIA) - VOLUME 3, APPENDIX F.1 (PART 1)Supporting Document · PDF12 Mar 2025View
HARD LANDSCAPING LAYOUTRefused Plan · PDF12 Mar 2025View
VOLUME 4: FIGURESSupporting Document · PDF26 Feb 2025View
APPENDIX F2: LANDSCAPE AND VISUAL IMPACT ASSESSMENT (LVIA) METHODOLOGYSupporting Document · PDF25 Feb 2025View
SPEYSIDE HYDROGEN EIA VOLUME 1 - NON-TECHNICAL SUMMARYSupporting Document · PDF25 Feb 2025View
VOLUME 2: EIAR CHAPTER 19 - CONCLUSION AND SCHEDULE OF MITIGATIONSupporting Document · PDF25 Feb 2025View
VOLUME 3 - APPENDIX A1: OUTLINE CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLANSupporting Document · PDF25 Feb 2025View
VOLUME 3 - APPENDIX J1: FLOOD RISK ASSESSMENTSupporting Document · PDF25 Feb 2025View
APPENDIX J4: WATER QUALITY IMPACT ASSESSMENTSupporting Document · PDF25 Feb 2025View
NATURE POSITIVE BIODIVERSITY REPORTSupporting Document · PDF25 Feb 2025View
PLANNING STATEMENTSupporting Document · PDF25 Feb 2025View
PRELIMINARY INCIDENT MANAGEMENT PLANSupporting Document · PDF25 Feb 2025View
VOLUME 2: EIAR CHAPTER 16 - WATER RESOURCESSupporting Document · PDF25 Feb 2025View
VOLUME 4: FIGURESSupporting Document · PDF25 Feb 2025View
COMPRESSOR BUILDING FLOOR AND ROOF PLANS SECTION AND 3D VIEWRefused Plan · PDF24 Feb 2025View
HARD LANDSCAPING PLANRefused Plan · PDF24 Feb 2025View
LOCATION PLANRefused Plan · PDF24 Feb 2025View
SOUTHERN ELECTROLYSER BUILDING - NORTHEAST AND SOUTHWEST ELEVATIONSRefused Plan · PDF24 Feb 2025View
ADMIN AND CONTROL BUILDING ELEVATIONSRefused Plan · PDF24 Feb 2025View
ADMIN AND CONTROL BUILDING FLOOR PLANSRefused Plan · PDF24 Feb 2025View
SPEYSIDE HYDROGEN ADMIN AND CONTROL BUILDING ROOF PLANRefused Plan · PDF24 Feb 2025View
ADMIN AND CONTROL BUILDING SECTIONSRefused Plan · PDF24 Feb 2025View
VISUALS - AERIAL 2Supporting Document · PDF24 Feb 2025View
NIGHT AERIAL 1Supporting Document · PDF24 Feb 2025View
CARBON BALANCE ASSESSMENTSupporting Document · PDF24 Feb 2025View
CARBON MANAGEMENT AND REPORTING PLANSupporting Document · PDF24 Feb 2025View
COMMUNITY WEALTH BUILDING PLANSupporting Document · PDF24 Feb 2025View
COMPRESSOR BUILDING ELEVATIONSRefused Plan · PDF24 Feb 2025View
DESIGN AND ACCESS STATEMENTSupporting Document · PDF24 Feb 2025View
DNO BUILDING ELEVATIONSRefused Plan · PDF24 Feb 2025View
DNO BUILDING ROOF AND FLOOR PLAN AND SECTIONSRefused Plan · PDF24 Feb 2025View
DRAINAGE DETAILS SHEET 1Refused Plan · PDF24 Feb 2025View
DRAINAGE DETAILS SHEET 2Refused Plan · PDF24 Feb 2025View
DRAINAGE DETAILS SHEET 3Refused Plan · PDF24 Feb 2025View
DRAINAGE DETAILS SHEET 4Refused Plan · PDF24 Feb 2025View
DRAINAGE DETAILS SHEET 5Refused Plan · PDF24 Feb 2025View
DRAINAGE DETAILS SHEET 6Refused Plan · PDF24 Feb 2025View
DRAINAGE DETAILS SHEET 7Refused Plan · PDF24 Feb 2025View
DRAINAGE DETAILS SHEET 8Refused Plan · PDF24 Feb 2025View
DRAINAGE STRATEGYSupporting Document · PDF24 Feb 2025View
VOLUME 2: EIAR CHAPTER 10 - LANDSCAPE AND VISUALSupporting Document · PDF24 Feb 2025View
VOLUME 2: EIAR CHAPTER 11 - MATERIALS AND WASTESupporting Document · PDF24 Feb 2025View
VOLUME 2: EIAR CHAPTER 12 - NOISE AND VIBRATIONSupporting Document · PDF24 Feb 2025View
VOLUME 2: EIAR CHAPTER 13 - POPULATION AND HUMAN HEALTHSupporting Document · PDF24 Feb 2025View
VOLUME 2: EIAR CHAPTER 14 - SOILSSupporting Document · PDF24 Feb 2025View
VOLUME 2: EIAR CHAPTER 15 - TRANSPORT AND MOVEMENTSupporting Document · PDF24 Feb 2025View
VOLUME 2: EIAR CHAPTER 17 - ACCIDENTS AND DISASTERSSupporting Document · PDF24 Feb 2025View
VOLUME 2: EIAR CHAPTER 18 - CUMULATIVE EFFECTSSupporting Document · PDF24 Feb 2025View
VOLUME 2: EIAR CHAPTER 5 - AIR QUALITYSupporting Document · PDF24 Feb 2025View
VOLUME 2: EIAR CHAPTER 7 - TERRESTRIAL ECOLOGYSupporting Document · PDF24 Feb 2025View
VOLUME 2: EIAR CHAPTER 9 - CULTURAL HERITAGESupporting Document · PDF24 Feb 2025View
APPENDIX C1: PRELIMINARY AQUATIC ECOLOGY ASSESSMENTSupporting Document · PDF24 Feb 2025View
APPENDIX C2: AQUATIC ECOLOGY BASELINE ASSESSMENTSupporting Document · PDF24 Feb 2025View
VOLUME 3 - APPENDIX C3: INVASICE NON-NATIVE SPECIES BIOSECURITY MANAGEMENT PLANSupporting Document · PDF24 Feb 2025View
APPENDIX E1: HISTORIC ENVIRONMENT DESK BASED ASSESSMENTSupporting Document · PDF24 Feb 2025View
APPENDIX F1: LANDSCAPE AND VISUAL IMPACT ASSESSMENTSupporting Document · PDF24 Feb 2025View
LANDSCAPE AND VISUAL IMPACT ASSESSMENT (LVIA) - VOLUME 3, APPENDIX F.1 (PART 2)Supporting Document · PDF24 Feb 2025View
APPENDIX G1: NOISE SURVEY CALIBRATION CERTFICATESSupporting Document · PDF24 Feb 2025View
APPENDIX G2: NOISE SURVEY MEASUREMENT DATASupporting Document · PDF24 Feb 2025View
APPENDIX H1: SOIL RESOURCE SURVEY REPORTSupporting Document · PDF24 Feb 2025View
APPENDIX I1: OUTLINE CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP)Supporting Document · PDF24 Feb 2025View
APPENDIX I2: ROAD SAFETY AUDITSupporting Document · PDF24 Feb 2025View
APPENDIX J2: GROUNDWATER RESOURCE IMPACT ASSESSMENTSupporting Document · PDF24 Feb 2025View
VOLUME 3 - APPENDIX J3: HYDROMORPHOLOGY IMPACT ASSESSMENTSupporting Document · PDF24 Feb 2025View
APPENDIX K1: LONGLIST OF DEVELOPMENTSSupporting Document · PDF24 Feb 2025View
VOLUME 2: EIAR CHAPTER 8 - CLIMATE RESILIENCESupporting Document · PDF24 Feb 2025View
PROPOSED GROUND LEVELSRefused Plan · PDF24 Feb 2025View
GROUND VIEW 2 YEARSSupporting Document · PDF24 Feb 2025View
GROUND VIEW 20 YEARSSupporting Document · PDF24 Feb 2025View
GROUND VIEW 20 YEARS - NIGHT VIEWSupporting Document · PDF24 Feb 2025View
LANDSCAPE MITIGATION PLANRefused Plan · PDF24 Feb 2025View
MV SUBSTATION ELEVATIONSRefused Plan · PDF24 Feb 2025View
MV SUBSTATION FLOOR PLANRefused Plan · PDF24 Feb 2025View
MV SUBSTATION ROOF PLANRefused Plan · PDF24 Feb 2025View
MV SUBSTATION SECTIONSRefused Plan · PDF24 Feb 2025View
NORTHERN ELECTROLYSER BUIDLING SE AND NW ELEVATIONSRefused Plan · PDF24 Feb 2025View
NORTHERN ELECTROLYSER BUILDING FLOOR PLANRefused Plan · PDF24 Feb 2025View
NORTHERN ELECTROLYSER BUILDING ROOF PLANRefused Plan · PDF24 Feb 2025View
NORTHERN ELECTROLYSER BUILDING SECTIONSRefused Plan · PDF24 Feb 2025View
NORTHERN ELECTROLYSER BUILDING SW AND NE ELEVATIONSRefused Plan · PDF24 Feb 2025View
PRE-APPLICATION CONSULTATION REPORTSupporting Document · PDF24 Feb 2025View
PRELIMINARY ARBOROCULTURAL APPRAISALSupporting Document · PDF24 Feb 2025View
PROPOSED LOCATION PLANRefused Plan · PDF24 Feb 2025View
RAW WATER AND EFFLUENT DISCHARGE PIPES LONGITUDINAL SECTIONSRefused Plan · PDF24 Feb 2025View
RAW WATER AND EFFLUENT DISCHARGE PIPES PLANRefused Plan · PDF24 Feb 2025View
RAW WATER AND EFFLUENT DISCHARGE PIPES KIOSK DETAILS 2Refused Plan · PDF24 Feb 2025View
RAW WATER BOOSTER STATION DETAILSRefused Plan · PDF24 Feb 2025View
SECURITY CABIN - PLANS, SECTIONS AND ELEVATIONSRefused Plan · PDF24 Feb 2025View
EXTERNAL WORKS ? SECURITY FENCE GENERAL ARRANGEMENTRefused Plan · PDF24 Feb 2025View
SITE ELEVATION ? SHEET 1 OF 2Refused Plan · PDF24 Feb 2025View
SITE ELEVATION - SHEET 2 OF 2Refused Plan · PDF24 Feb 2025View
SITE SECTIONS - SHEET 1 OF 2Refused Plan · PDF24 Feb 2025View
SITE SECTIONS - SHEET 2 OF 2Refused Plan · PDF24 Feb 2025View
SOUTHERN ELECTROLYSER BUILDING - SOUTHEAST AND NORTHWEST ELEVATIONSRefused Plan · PDF24 Feb 2025View
SOUTHERN ELECTROLYSER BUILDING - FLOOR PLANRefused Plan · PDF24 Feb 2025View
SOUTHERN ELECTROLYSER BUILDING - ROOF PLANRefused Plan · PDF24 Feb 2025View
SOUTHERN ELECTROLYSER BUILDING - SECTIONSRefused Plan · PDF24 Feb 2025View
EXTERNAL WORKS - SWEPT PATH ANALYSIS - SHEET 1Refused Plan · PDF24 Feb 2025View
EXTERNAL WORKS - VEHICLE SWEPT PATH - SHEET 2Refused Plan · PDF24 Feb 2025View
EXTERNAL WORKS - VEHICLE SWEPT PATH - SHEET 3Refused Plan · PDF24 Feb 2025View
TRANSPORT STATEMENTSupporting Document · PDF24 Feb 2025View
CIVIL ENGINEERING - TYPICAL CONSTRUCTION DETAILS - SHEET 1Refused Plan · PDF24 Feb 2025View
CIVIL ENGINEERING - TYPICAL CONSTRUCTION DETAILS - SHEET 2Refused Plan · PDF24 Feb 2025View
CIVIL ENGINEERING - TYPICAL FENCING DETAILS - SHEET 1Refused Plan · PDF24 Feb 2025View
CIVIL ENGINEERING - TYPICAL FENCING DETAILS - SHEET 2Refused Plan · PDF24 Feb 2025View
CIVIL ENGINEERING - TYPICAL FENCING DETAILS - SHEET 3Refused Plan · PDF24 Feb 2025View
APPENDIX B1: CONSTRUCTION DUST RISK ASSESSMENTSupporting Document · PDF24 Feb 2025View
APPENDIX B2: ROAD SOURCE MODEL VERIFICATIONSupporting Document · PDF24 Feb 2025View
VOLUME 3 - APPENDIX D1: PRELIMINARY ECOLOGICAL APPRAISAL REPORTSupporting Document · PDF24 Feb 2025View
APPENDIX E2: HISTORIC EIA TABLESSupporting Document · PDF24 Feb 2025View
WAREHOUSE/WORKSHOP BUILDING - ELEVATIONSRefused Plan · PDF24 Feb 2025View
WAREHOUSE/WORKSHOP BUILDING - FLOOR AND ROOF PLANSRefused Plan · PDF24 Feb 2025View
WAREHOUSE/WORKSHOP BUILDING - SECTIONSRefused Plan · PDF24 Feb 2025View
VOLUME 2: EIAR CHAPTERS 1-4 - INTRODUCTORY CHAPTERSSupporting Document · PDF24 Feb 2025View
VOLUME 3 - APPENDIX D3: BREEDING BIRD SURVEY REPORTSupporting Document · PDF24 Feb 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Refuse
DECISION NOTICE - REFUSED
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.