Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Berry Burn Wind Farm Dunphail Forres Moray
Berry Burn Wind Farm Dunphail Forres Moray
This record has no verified map location.
View council mapProposed wind farm extension at
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| 26/00405/DISCON - CONDS 11, 12 & 26 DISCHARGEDCorrespondence from Council · PDF | 25 May 2026 | View |
| 26/00405/DISCON - COND11 EXTENSION HABITAT MANAGEMENT PLAN - ACCEPTEDSupporting Document · PDF | 3 Apr 2026 | View |
| 26/00405/DISCON - COND 11 FIGURE 1 - SITE PLAN AND TERMS OF REFERENCE - ACCEPTEDDrawing · PDF | 3 Apr 2026 | View |
| 26/00405/DISCON - COND 11 FIGURE 2 - 2019 WILDFIRE EXTENT - ACCEPTEDDrawing · PDF | 3 Apr 2026 | View |
| 26/00405/DISCON - COND 11 FIGURE 3 - BOG RESTORATION REWETTING AREA - ACCEPTEDDrawing · PDF | 3 Apr 2026 | View |
| 26/00405/DISCON - COND 11 FIGURE 4 - RESTORATION PROPOSALS FOR GRIPS AND GULLIESDrawing · PDF | 3 Apr 2026 | View |
| 26/00405/DISCON - COND 11 FIGURE 5 - WOODLAND REPLANTING AREA - ACCEPTEDDrawing · PDF | 3 Apr 2026 | View |
| 26/00405/DISCON - COND11 FIGURE A1 POST WILDLIFE VEGETATION MONITORING SAMPLE PODrawing · PDF | 3 Apr 2026 | View |
| 26/00405/DISCON - COND 12 HABITAT MANAGEMENT GROUPSupporting Document · PDF | 3 Apr 2026 | View |
| 26/00405/DISCON - COND 26 FIGURE 1 LOCATION - ACCEPTEDDrawing · PDF | 3 Apr 2026 | View |
| 26/00405/DISCON - COND 26 FIGURE 2 PLANTING AREAS - ACCEPTEDDrawing · PDF | 3 Apr 2026 | View |
| 26/00405/DISCON - COND 26 FIGURE 3 TREE REMOVAL - ACCEPTEDDrawing · PDF | 3 Apr 2026 | View |
| 26/00405/DISCON - COND 26 FIGURE 4 ROADSIDE PLANTING - ACCEPTEDDrawing · PDF | 3 Apr 2026 | View |
| 26/00405/DISCON - COND 26 WOODLAND CREATION AND REPLANTING PLAN - ACCEPTEDSupporting Document · PDF | 3 Apr 2026 | View |
| 26/00405/DISCON - LOCATION PLAN - ACCEPTEDDrawing · PDF | 3 Apr 2026 | View |
| 25/01325/DISCON - DISCHARGE OF CONDS 9,28 & 32 - ACCEPTEDCorrespondence from Council · PDF | 3 Dec 2025 | View |
| 25/00218/DISCON - DISCHARGE OF CONDS 15, 17, 25 & 27 - ACCEPTEDCorrespondence from Council · PDF | 12 May 2025 | View |
| ANNEXE 3 SITE BOUNDARY AND SITE LAYOUTDecision · PDF | 8 Dec 2021 | View |
| ANNEX 4 - HABITAT REGULATIONS APPRAISALDecision · PDF | 8 Dec 2021 | View |
| DECISION LETTERDecision · PDF | 8 Dec 2021 | View |
| REPORTCommittee Report | 29 Mar 2021 | View |
| APPENDIX 1Committee Report | 29 Mar 2021 | View |
| APPENDIX 2Committee Report · PDF | 29 Mar 2021 | View |
| TRANSPORTATION MANAGERConsultation Response · PDF | 3 Mar 2021 | View |
| ENVIRONMENTAL HEALTHConsultation Response | 24 Sept 2020 | View |
| CONTAMINATED LANDConsultation Response · PDF | 22 Sept 2020 | View |
| ENVIRONMENTAL PROTECTIONConsultation Response · PDF | 21 Sept 2020 | View |
| FLOOD RISK MANAGEMENTConsultation Response · PDF | 16 Sept 2020 | View |
| FIGURE 7.6A - CUMULATIVE SITES IN CLVIA SEARCHSupporting Document · PDF | 27 Aug 2020 | View |
| FIGURE 7.5B - ASSESSED VISUAL RECEPTOR LOCATIONSSupporting Document · PDF | 27 Aug 2020 | View |
| FIGURE 7.7A - CUMULATIVE ZTV - PROPOSED DEVELOPMENT WITH ALL CLVIA BASELINE SITESupporting Document · PDF | 27 Aug 2020 | View |
| FIGURE 7.6B - CUMULATIVE SITES INCLUDING CLVIA BASELINESupporting Document · PDF | 27 Aug 2020 | View |
| FIGURE 7.7D - CUMULATIVE ZTV - PROPOSED DEVELOPMENT WITH BOGNIE FARM & CLUNY FARSupporting Document · PDF | 27 Aug 2020 | View |
| FIGURE 7.7C - PROPOSED DEVELOPMENT WITH THE OPERATIONAL BERRY BURN WIND FARMSupporting Document · PDF | 27 Aug 2020 | View |
| FIGURE 7.7B - PROPOSED DEVELOPMENT WITH OPERATIONAL UNDER CONSTRUCTION CLVIA BASSupporting Document · PDF | 27 Aug 2020 | View |
| FIGURE 7.7I - CUMULATIVE TV - PROPOSED DEVELOPMENT WITH HUNTHILL WIND FARMSupporting Document · PDF | 27 Aug 2020 | View |
| FIGURE 7.7H - CUMULATIVE TV - PROPOSED DEVELOPMENT WITH CAIRN DUHIE WIND FARMSupporting Document · PDF | 27 Aug 2020 | View |
| FIGURE 7.7G - CUMULATIVE TV - PROPOSED DEVELOPMENT WITH ROTHES I AND II WIND FARSupporting Document · PDF | 27 Aug 2020 | View |
| FIGURE 7.7F - CUMULATIVE TV - PROPOSED DEVELOPMENT WITH PAULS HILL I WIND FARMSupporting Document · PDF | 27 Aug 2020 | View |
| FIGURE 7.7E - CUMULATIVE TV - PROPOSED DEVELOPMENT WITH HILL OF GLASCHYLE WIND FSupporting Document · PDF | 27 Aug 2020 | View |
| FIGURE 7.7M - CUMULATIVE TV - PROPOSED DEVELOPMENT WITH ROTHES III WIND FARMSupporting Document · PDF | 27 Aug 2020 | View |
| FIGURE 7.7L - CUMULATIVE TV - PROPOSED DEVELOPMENT WITH PAULS HILL II WIND FARMSupporting Document · PDF | 27 Aug 2020 | View |
| FIGURE 7.7K - CUMULATIVE TV - PROPOSED DEVELOPMENT WITH CLASH GOUR SCENARIO A SSupporting Document · PDF | 27 Aug 2020 | View |
| FIGURE 7.7J - CUMULATIVE TV - PROPOSED DEVELOPMENT WITH KELLAS & MEIKLE HILL WISupporting Document · PDF | 27 Aug 2020 | View |
| FIGURE 7.5A - POTENTIAL VISUAL RECEPTOR LOCATIONS -Supporting Document · PDF | 25 Aug 2020 | View |
| NON TECHNICAL SUMMARYSupporting Document · PDF | 23 Aug 2020 | View |
| NON TECHNICAL SUMMARY - APPENDIX 1Supporting Document · PDF | 23 Aug 2020 | View |
| NON TECHNICAL SUMMARY - APPENDIX 2Supporting Document · PDF | 23 Aug 2020 | View |
| PRE APPLICATION CONSULATION REPORT - APPENDICIESSupporting Document · PDF | 23 Aug 2020 | View |
| PRE APPLICATION CONSULATION REPORT - MAIN TEXTSupporting Document · PDF | 23 Aug 2020 | View |
| PLANNING STATEMENTSupporting Document · PDF | 23 Aug 2020 | View |
| CHAPTER 1 - INTRODUCTIONSSupporting Document · PDF | 23 Aug 2020 | View |
| CHAPTER 2 - SITE DESCRIPTIONSupporting Document · PDF | 23 Aug 2020 | View |
| CHAPTER 3 - ALTERANTIVES AND DESIGN EVOLUTIONSupporting Document · PDF | 23 Aug 2020 | View |
| CHAPTER 4 - DESCRIPTION OF PROPOSED DEVELOPMENTSupporting Document · PDF | 23 Aug 2020 | View |
| CHAPTER 5 - PLANNING AND ENERGY POLICYSupporting Document · PDF | 23 Aug 2020 | View |
| CHAPTER 6 - EIA METHODOLOGY & APPROACHSupporting Document · PDF | 23 Aug 2020 | View |
| CHAPTER 7 - LANDSCAPE AND VISUAL IMPACT ASSESSMENTSupporting Document · PDF | 23 Aug 2020 | View |
| CHAPTER 8 - CULTURAL HERITAGESupporting Document · PDF | 23 Aug 2020 | View |
| CHAPTER 9 - ORNITHOLOGYSupporting Document · PDF | 23 Aug 2020 | View |
| CHAPTER 10 - ECOLOGYSupporting Document · PDF | 23 Aug 2020 | View |
| CHAPTER 11 - HYDROLOGY & HYDROGEOLOGYSupporting Document · PDF | 23 Aug 2020 | View |
| CHAPTER 12 - GEOLOGY & PEATSupporting Document · PDF | 23 Aug 2020 | View |
| CHAPTER 13 - ACCESS TRAFFIC & TRANSPORTSupporting Document · PDF | 23 Aug 2020 | View |
| CHAPTER 14 - NOISESupporting Document · PDF | 23 Aug 2020 | View |
| CHAPTER 15 - AVIATIONSupporting Document · PDF | 23 Aug 2020 | View |
| CHAPTER 16 - TELECOMMUNICATIONSSupporting Document · PDF | 23 Aug 2020 | View |
| CHAPTER 17 - SOCIO- ECONOMICSSupporting Document · PDF | 23 Aug 2020 | View |
| CHAPTER 18 - CARBON BALANCESupporting Document · PDF | 23 Aug 2020 | View |
| CHAPTER 19 - SUMMARY OF MITIGATIONSupporting Document · PDF | 23 Aug 2020 | View |
| VOLUME 1 - CONTENTS PAGESupporting Document · PDF | 23 Aug 2020 | View |
| VOLUME 1 - COVERSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 2.1 - SITE BOUNDARYSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 4.1 - PROPOSED SITE LAYOUTSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 4.2 - SITE ACCESS & JUNCTIONS TOMNAMOON TO TOMINTOULSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 4.3 - TYPICAL TURBINE DIMENTIONSSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 4.4 - TYPICAL TURBINE FOUNDATION DIMENSIONSSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 4.5 - INDICATIVE CRANE HARDSTANDING DIMENSIONSSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 4.6 - INDICATIVE TRACK DESIGN CROSS SECTIONSSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 4.7 - INDICATIVE PLAN & ELEVATION OF SUBSTATIONSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 4.8 - INDICATIVE CABLE TRENCH DETAILSSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 4.9 - LOCATION OF WATERCOURSE CROSSING AND CATCHMENTSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 4.10 - TYPICAL TRACK WATERCORSE CROSSINGSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 4.11 - PRELIMINARY T7-T8 CABLE ROUTING & LOCATION OF RIVER LOSSIE CROSSINSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 4.12 - INDICATIVE CONSTRUCTION COMPOUND LAYOUTSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 4.13 - INDICATIVE LAYOUT OF BORROW PIT (BP1)Supporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 4.14 - INDICATIVE LAYOUT OF BORROW PIT (BP2)Supporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 4.15 - TYPICAL ANEMOMETER MAST ARRANGEMENTSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 5.1 - SSP ONSHORE WIND FARM SPATIAL FRAMEWORKSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 5.2 - MONRAY COUNCIL GUIDACNE FOR LARGE TYPOLOGIES & FOR RXTENSIONS & REPSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.4B - VIEWPOINTS AND ZTVSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.1 - CULTURAL HERITAGE BASELINE AND STUDY AREASSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.2A - HERITAGE ASSETS IN INNER STUDY AREASupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.2B - HERITAGE ASSETS IN INNER STUDY AREASupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.2C - HERITAGE ASSETS IN INNER STUDY AREASupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.2D - HERITAGE ASSETS IN INNER STUDY AREASupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.2E - HERITAGE ASSETS IN INNER STUDY AREASupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.2F - HERITAGE ASSETS IN INNER STUDY AREASupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.2G - HERITAGE ASSETS IN INNER STUDY AREASupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.2H - HERITAGE ASSETS IN INNER STUDY AREASupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.2I - HERITAGE ASSETS IN INNER STUDY AREASupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.2J - HERITAGE ASSETS IN INNER STUDY AREASupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.3 - HERITAGE ASSETS IN OUTER STUDY AREASupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 9.1 - TERMS OF REFERENCESupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 9.2A - ORNITHOLOGICAL STUDYSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 9.2B - STATUTORY DESIGNATED SITESSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 9.3 - VANTAGE POINTS SURVEY PLANSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 10.1 - TEREMS OF REFERENCESupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 10.2 - EXTENT OF WILDFIRE AND DRAIANGE NETWORKSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 10.4B - PRE 2019 WILDFIRE FORESTRYSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 10.7 - EHMP MEASURESSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 11.1 - SURFACE WATER CHATCHEMENTSSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 11.2 - ABSTRACTIONS * DISCHARGESSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 11.3 - WATERCOURSE CROSSINGSSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 12.1 - BEDROCK GEOLOGY (INC BH LOCATIONS)Supporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 12.2 - SUPERFUCAIAL DESPOSITS (INC BH LOCATIONS)Supporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 12.3 - SOILSSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 12.4.1- 12.4.3 - PEAT DEPTH & GEOMORPHOLOGYSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 12.4.4 - 12.4.7 - PEAT DEPTH & GEOMORPHOLOGYSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 12.5.1 - 12.5.7 - SURFACE FIRMNESSSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 12.6 - LAND CAPABILITY FOR AGRICULTURESupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 12.7 - PLHRA - SLOPE GRADIENTSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 12.8 - PLHRA - PEAT DEPTHSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 12.9 - PLHRA - SUBSTRATESupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 12.10- PLHRA - SLOPE SHAPESupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 12.11- PLHRA - DRAIANGE PROXIMITYSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 12.12- PLHRA - HISTORIC INSTABILITYSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 12.13- PLHRA - LIKELIHOOD OF PEAT INSTABILITY (HAZARD)Supporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 12.14- PLHRA - POTENTIAL ADVERSE CONSEQUENCES (EXPOSURE) ZONESSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 12.15- PLHRA - PEAT LANDSLIDE RISK (HAZARD RANKING)Supporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 12.16 - DITCH BACKFILLING SUITABLITY SERVEU OVERVIEWSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 12.16.1 - 12.16.6 - DFITCH BACKFILLING SUITABLITY SURVEY RESULTSSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 12.16.7 - 12.16.12 - DFITCH BACKFILLING SUITABLITY SURVEY RESULTSSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 13.1 - SITE LOCATION STUDY AREA & COUNT SITESSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 13.2 - ABNORMAL INDIVISIBLE LOAD ROUTESupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 13.3 - SITE ACCESSSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 14.1 - NOISE CONTOURS FOR OPERATIONAL BERRYBURN WIND FARM & PROPOSED DEVESupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 14.2 - CUMULATIVE NOISE CONTOURSSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 15.1 - VFR 250K CHART EXTRACT - LARGE SCALESupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 15.2 - VFR 250K CHART EXTRACT - SMALL SCALESupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 16.1 - PROXIMITY TO FIXED LINK TO SITE BOUNDARYSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 17.1 - ASSESSMENT STUDY AREASupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 17.2 - ALL TOURISM AND RECREATION ASSETSSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 17.3 - PRINCIPLE SETTLEMENTS & TRANSPORT CONNECTIONSSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 17.4 - VISITOR ATTRACTIONS & ACTIVITIESSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 17.5 - VISITOR ATTRACTIONS & ACRTIVITIES (DISTILLERIES ETC)Supporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 17.6 - LONG DISTANCE WALKING ROUTES PRINCIPLE CYCLING ROUTESSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 17.7 - CORE PATHS RIGHTS OF WAY & PROMOTED PATH NETWORKSSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 17.8 - PRINCIPLE WATERWAYS & LOCHSSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 17.9 - ESTATESSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 17.10 - EVENTS AND FESTIVALSSupporting Document · PDF | 23 Aug 2020 | View |
| VOLUME 2 - CONTENTS PAGESupporting Document · PDF | 23 Aug 2020 | View |
| VOLUME 2 - COVERSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.8A - VIEWPOINT LOCATIONSSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.8B - VIEWPOINT LOCATION 1 LOCHINDORB NEAR B9007Supporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.8C - VIEWPOINT LOCATION 1 LOCHINDORB NEAR B9007Supporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.8D - VIEWPOINT LOCATION 1 LOCHINDORB NEAR B9007Supporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.9A - VIEWPOINT 2 LOCATION PLANSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.9B-C - VIEWPOINT 2 DAVA WAY NEAR KNOCK OF BRAEMORAYSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.9D - VIEWPOINT 2 DAVA WAY NEAR KNOCK OF BRAEMORAYSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.9E - VIEWPOINT 2 DAVA WAY NEAR KNOCK OF BRAEMORAYSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.10A - VIEWPOINT 3 LOCATION PLANSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.10B-E - VIEWPOINT 3 DALLASBROUGHTSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.10F- VIEWPOINT 3 DALLASBROUGHTSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.10G- VIEWPOINT 3 DALLASBROUGHTSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.11A - VIEWPOINT 4 LOCATION PLANSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.11B-E - VIEWPOINT 4 TOMDOW A940Supporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.11F- VIEWPOINT 4 TOMDOW A940Supporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.11G- VIEWPOINT 4 TOMDOW A940Supporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.12A - VIEWPOINT 5 LOCATION PLANSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.12B-C - VIEWPOINT 5 A96 WEST OF FORRESSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.12D - VIEWPOINT 5 A96 WEST OF FORRESSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.12E - VIEWPOINT 5 A96 WEST OF FORRESSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.13A - VIEWPOINT 6 LOCATION PLANSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.13B-C- VIEWPOINT 6 NORTH OF DALLASSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.13D- VIEWPOINT 6 NORTH OF DALLASSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.13E- VIEWPOINT 6 NORTH OF DALLASSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.14A - VIEWPOINT 7 LOCATION PLANSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.14B-E- VIEWPOINT 7 AULTAHUISH ON DALLAS-KNOCKANDO ROADSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.14F- VIEWPOINT 7 AULTAHUISH ON DALLAS-KNOCKANDO ROADSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.14G- VIEWPOINT 7 AULTAHUISH ON DALLAS-KNOCKANDO ROADSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.15A - VIEWPOINT 8 LOCATION PLANSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.15B-C - VIEWPOINT 8 PIKEY HILLSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.15D - VIEWPOINT 8 PIKEY HILLSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.15E - VIEWPOINT 8 PIKEY HILLSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.16A - VIEWPOINT 9 LOCATION PLANSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.16B- VIEWPOINT 9 CREAGAN A CHAISESupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.16C- VIEWPOINT 9 CREAGAN A CHAISESupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.16D- VIEWPOINT 9 CREAGAN A CHAISESupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.17A - VIEWPOINT 10 LOCATION PLANSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.17B-C- VIEWPOINT 10 BEN RINNESSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.17D- VIEWPOINT 10 BEN RINNESSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.17E- VIEWPOINT 10 BEN RINNESSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.18A - VIEWPOINT 11 LOCATION PLANSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.18B - VIEWPOINT 11 BEN AIGANSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.18C - VIEWPOINT 11 BEN AIGANSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.18D - VIEWPOINT 11 BEN AIGANSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.19A -VIEWPOINMT 12 LOCATION PLANSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.19B -VIEWPOINMT 12 CALCOTS ROAD ELGINSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.19C -VIEWPOINMT 12 CALCOTS ROAD ELGINSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.19D -VIEWPOINMT 12 CALCOTS ROAD ELGINSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.20A - VIEWPOINT 13 LOCATION PLANSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.20B - VIEWPOINT 13 FINDHORNSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.20C - VIEWPOINT 13 FINDHORNSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.20D - VIEWPOINT 13 FINDHORNSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.21A - VIEWPOINT 14 LOCATION PLANSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.21B - VIEWPOINT 14 CARNNA GUAILLESupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.21C - VIEWPOINT 14 CARNNA GUAILLESupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.21D - VIEWPOINT 14 CARNNA GUAILLESupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.22A - VIEWPOINT 15 LOCATION PLANSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.22B-C - VIEWPOINT 15 NEAR HATTON CAIRN CHARLESTOWN OF ABEERLOURSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.22D - VIEWPOINT 15 NEAR HATTON CAIRN CHARLESTOWN OF ABEERLOURSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 7.22E - VIEWPOINT 15 NEAR HATTON CAIRN CHARLESTOWN OF ABEERLOURSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.4A - WL1 LOCATION PLANSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.4B - WL1 MOY HOUSESupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.4C - WL1 MOY HOUSESupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.5A - WL2 LOCATION PLANSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.5B- WL2 GRANGE HALLSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.5C - WL2 GRANGE HALLSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.6A WL3 LOCATION PLANSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.6B WL3 INVERERNE HOUSESupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.6C WL3 INVERERNE HOUSESupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.7A - WL4 LOCATION PLANSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.7B - WL4 RELUGASSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.7C - WL4 RELUGASSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.8A - WL5 LOCATION PLANSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.8B - WL5 BRODIE CASTLESupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.8C- WL5 BRODIE CASTLESupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.9A - WL6 LOCATION PLANSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.9B- WL6 DARNAWAY CASTLESupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.9C - WL6 DARNAWAY CASTLESupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.10A - WL7 LOCATION PLANSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.10B- WL7 GRANT PARK AND CLUNY HILLSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.10C - WL7 GRANT PARK AND CLUNY HILLSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.11A - PM1 LOCATION PLANSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.11B - PM1 VIEW TOWARDS LOCHINDORB CASTLE FROM MINOR ROAD SW OF LOCHINDOSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.11C- PM1 VIEW TOWARDS LOCHINDORB CASTLE FROM MINOR ROAD SW OF LOCHINDORSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURE 8.11D - PM1 VIEW TOWARDS LOCHINDORB CASTLE FROM MINOR ROAD SW OF LOCHINDOSupporting Document · PDF | 23 Aug 2020 | View |
| VOLUME 3 CONTENTS PAGESupporting Document · PDF | 23 Aug 2020 | View |
| VOLUME 3 COVERSupporting Document · PDF | 23 Aug 2020 | View |
| VOLUME 4 COVERSupporting Document · PDF | 23 Aug 2020 | View |
| VOLUME 4 CONTENTS PAGESupporting Document · PDF | 23 Aug 2020 | View |
| TECHNICAL APPENDIX 4.1 OUTLINER CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLANSSupporting Document · PDF | 23 Aug 2020 | View |
| TECHNICAL APPENDIX 4.2 OUTLINE CONSTRUCTION METHOD STATEMENTSupporting Document · PDF | 23 Aug 2020 | View |
| TECHNICAL APPENDIX 7.1 TECHNICAL METHODOLOGIES FOR VISUAL REPRESENTATIONSupporting Document · PDF | 23 Aug 2020 | View |
| TECHNICAL APPENDIX 7.2 HIGH LEVELS LVIA SCOPING APPRAISALSupporting Document · PDF | 23 Aug 2020 | View |
| TECHNICAL APPENDIX 7.3 CUMULATIVE SITES INCLUDED IN THE CLVIA BASELINESupporting Document · PDF | 23 Aug 2020 | View |
| TECHNICAL APPENDIX 7.4 LANDSCAPE ASSESSMENT TABLESupporting Document · PDF | 23 Aug 2020 | View |
| TECHNICAL APPENDIX 7.5 THE CAIRNGORM NATIONAL PARK SPECIAL LANDSCAPE QUALITIESSupporting Document · PDF | 23 Aug 2020 | View |
| TECHNICAL APPENDIX 7.6 VISUAL ASSESSMENT TABLESSupporting Document · PDF | 23 Aug 2020 | View |
| TECHNICAL APPENDIX 7.7 CUMULATIVE LANDSCAPE ASSESSMENT TABLESSupporting Document · PDF | 23 Aug 2020 | View |
| TECHNICAL APPENDIX 7.8 CUMULATIVE VISUAL ASSESSMENT TABLESSupporting Document · PDF | 23 Aug 2020 | View |
| TECHNICAL APPENDIX 8.1 GAZETTEER OF HERITAGE ASSETS WITHIN THE INNES STUDAY AREASupporting Document · PDF | 23 Aug 2020 | View |
| TECHNICAL APPENDIX 9.1 ORNITHOLOGYSupporting Document · PDF | 23 Aug 2020 | View |
| TECHNICAL APPENDIX 11.2 CAR LICENCE ABRSTATIONS AND DISCHARGESSupporting Document · PDF | 23 Aug 2020 | View |
| TECHNICAL APPENDIX 11.3 GWDTE SEPA CHECKLISTSupporting Document · PDF | 23 Aug 2020 | View |
| TECHNICAL APPENDIX 11.4 WATERCOURSE CROSSING ASSESSMENTSupporting Document · PDF | 23 Aug 2020 | View |
| TECHNICAL APPENDIX 12.1 SELECTED BOREHOLES LOGSupporting Document · PDF | 23 Aug 2020 | View |
| TECHNICAL APPENDIX 12.2 PEAT SURVEY REPORTSupporting Document · PDF | 23 Aug 2020 | View |
| TECHNICAL APPENDIX 12.3 OUTLINE PEAT MANAGEMENT PLANSupporting Document · PDF | 23 Aug 2020 | View |
| TECHNICAL APPENDIX 12.4 PLHRA REPORTSupporting Document · PDF | 23 Aug 2020 | View |
| TECHNICAL APPENDIX 12.5 PLHRA INPUT TO GEOTCHNICAL RISKSupporting Document · PDF | 23 Aug 2020 | View |
| TECHNICAL APPENDIX 12.6 SEPA CONSULTEE CORRESPONDENCESupporting Document · PDF | 23 Aug 2020 | View |
| TECHNICAL APPENDIX 13.1 TRANSPORT ASSESSMENT PART 1Supporting Document · PDF | 23 Aug 2020 | View |
| TECHNICAL APPENDIX 13.1 TRANSPORT ASSESSMENT PART 2Supporting Document · PDF | 23 Aug 2020 | View |
| TECHNICAL APPENDIX 13.1 TRANSPORT ASSESSMENT PART 3Supporting Document · PDF | 23 Aug 2020 | View |
| TECHNICAL APPENDIX 14.1 NOISE GLOSSARYSupporting Document · PDF | 23 Aug 2020 | View |
| TECHNICAL APPENDIX 14.2 ISO 9613-2 NOISE PREDICATION PARAMATERSSupporting Document · PDF | 23 Aug 2020 | View |
| TECHNICAL APPENDIX 17.1 SOCIO-ECONOMIC TABLESSupporting Document · PDF | 23 Aug 2020 | View |
| TECHNICAL APPENDIX 17.2 COMPARATIVE RESEARCH REVIEWSupporting Document · PDF | 23 Aug 2020 | View |
| TECHNICAL APPENDIX 17.3 RECREATION AUDIT & IMPACTSupporting Document · PDF | 23 Aug 2020 | View |
| FIGURES 7.1 -7.4 ASupporting Document · PDF | 23 Aug 2020 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.