Council planning record

Erect 29 wind turbines consisting of 18 turbines of an overall height from base to tip not exceeding 225m 8 turbines of an overall height from base to tip not exceeding 200m and 3 turbines of an overall height from base to not exceeding 149.9m associated infrastructure includes external transformer housing crane pads turbine foundations access tracks 2 substations underground electricity cables anemometry mast

Rothes III Wind Farm Moray

UnknownReference: 19/00156/S36Moray

Application location

Rothes III Wind Farm Moray

This record has no verified map location.

View council map

Application summary

Status
Unknown
Application type
Dealt With By Scottish Executive
Received
12 Feb 2019
Validated
14 Mar 2019
Determination deadline
29 Mar 2019
Local authority
Moray

Application overview

Erect 29 wind turbines consisting of 18 turbines of an overall height from base to tip not exceeding 225m 8 turbines of an overall height from base to tip not exceeding 200m and 3 turbines of an overall height from base to not exceeding 149.9m associated infrastructure includes external transformer housing crane pads turbine foundations access tracks 2 substations underground electricity cables anemometry mast

Proposal details

Reference
19/00156/S36
Alternative references
ECU0000474
Ward
Speyside Glenlivet
Agent
Natural Power Consultants Limited

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 286 of 286

DocumentPublishedAction
DECISION LETTERDecision · PDF24 Oct 2022View
SITE LAYOUTDrawing · PDF24 Oct 2022View
PLI REPORTReport · PDF24 Oct 2022View
ENVIRONMENTAL HEALTH - UPDATEDConsultation Response · PDF28 Sept 2021View
ENVIRONMENTAL HEALTHConsultation Response · PDF8 Sept 2020View
VIEWPOINT 19: B9102 BETWEN BLACKSBOAT BRIDGE AND CARDHUSupporting Document · PDF14 Apr 2020View
VIEWPOINT 19: B9102 BETWEEN BLACKSBOAT BRIDGE AND CARDHU - COMPARIATIVE VISUALIA Very Important Note · PDF14 Apr 2020View
VIEWPOINT 19: B9102 BETWEEN BLACKSBOAT BRIDGE AND CARDHU - ORIGINAL PROPOSAL LAYSupporting Document · PDF14 Apr 2020View
SUPPLEMENTAL TRANSPORT INFORMATIONSupporting Document · PDF14 Apr 2020View
ADDITIONAL VIEWPOINT ASSESSMENTSupporting Document · PDF14 Apr 2020View
ENVIRONMENTAL HEALTHConsultation Response · PDF18 Feb 2020View
APPENDIX 1.1 CONSULTEE RESPONSESSupporting Document · PDF15 Jan 2020View
APPENDIX 1.2 SEPA RESPONSESupporting Document · PDF15 Jan 2020View
APPENDIX 9.1 HERITAGE ASSETS WITHIN THE WIDER STUDY AREASupporting Document · PDF15 Jan 2020View
APPENDIX 10.1 ROTHES III GEOTECHNICAL DESK STUDYSupporting Document · PDF15 Jan 2020View
APPENDIX 10.2 ROTHES III AI PEAT STABILITY ASSESSMENTSupporting Document · PDF15 Jan 2020View
APPENDIX 10.3 ROTHES III PEAT AMANGEMENT PLANSupporting Document · PDF15 Jan 2020View
APPENDIX 10.4 ROTHES III BORROW PIT REPORTSupporting Document · PDF15 Jan 2020View
APPENDIX 10.5 CARBON BALANCE ASSESSMENTSupporting Document · PDF15 Jan 2020View
APPENDIX 10.6 WATERCOURSE CROSSING ASSESSMENTSupporting Document · PDF15 Jan 2020View
APPENDIX 10.7 PRIVATE WATER SUPPLY RISK ASSESSMENTSupporting Document · PDF15 Jan 2020View
APPENDIX 10.8 OUTLINE MITIGATIONSupporting Document · PDF15 Jan 2020View
APPENDIX 12.1 ABNORMAL LOADS ASSESSMENT COMBINEDSupporting Document · PDF15 Jan 2020View
APPENDIX 14.1 AVIATION CONSULTEE RESPONSE INCLUDING EIAR CONSULTEE RESPONSESSupporting Document · PDF15 Jan 2020View
CHAPTER 1 - INTRODUCTIONSupporting Document · PDF15 Jan 2020View
CHAPTER 2 - POLICIT CONTEXTSupporting Document · PDF15 Jan 2020View
CHAPTER 3 - DESIGN EVOLUTIONSupporting Document · PDF15 Jan 2020View
CHAPTER 4 - DESCRIPTION OF DEVELOPMENTSupporting Document · PDF15 Jan 2020View
CHAPTER 5 - APPROACH TO EIASupporting Document · PDF15 Jan 2020View
CHAPTER 6 - ECOLOGY ASSESSMENTSupporting Document · PDF15 Jan 2020View
CHAPTER 8 - LANDSCAPE AND VISUAL IMPACT ASSESSMENTSupporting Document · PDF15 Jan 2020View
CHAPTER 9 - CULTURAL HERITAGESupporting Document · PDF15 Jan 2020View
CHAPTER 10 - HYDROLOGY GELOGY AND HYDROGEOLOGYSupporting Document · PDF15 Jan 2020View
CHAPTER 11 - FORESTRYSupporting Document · PDF15 Jan 2020View
CHAPTER 12 - TRAFFIC AND TRANSPORTSupporting Document · PDF15 Jan 2020View
CHAPTER 13 - NOISE ASSESSMENTSupporting Document · PDF15 Jan 2020View
CHAPTER 14 - AVIATION AND INFRASTRUCTURE (INC SHADOW FLICKER)Supporting Document · PDF15 Jan 2020View
CHAPTER 15 - COCIOECONOMICSSupporting Document · PDF15 Jan 2020View
CHAPTER 16 - ACCESSSupporting Document · PDF15 Jan 2020View
CHAPTER 17 - SUMMARYSupporting Document · PDF15 Jan 2020View
ROTHES III COVER DEC 2019Supporting Document · PDF15 Jan 2020View
VOLUME 2 - CONTENTSSupporting Document · PDF15 Jan 2020View
VOLUME 2 - PREFACESupporting Document · PDF15 Jan 2020View
VOLUME 3A - CONTENTSSupporting Document · PDF15 Jan 2020View
VOLUME 3A - PREFACESupporting Document · PDF15 Jan 2020View
VOLUME 3B - CONTENTSSupporting Document · PDF15 Jan 2020View
VOLUME 3B - PREFACESupporting Document · PDF15 Jan 2020View
VOLUME 4 - CONTENTSSupporting Document · PDF15 Jan 2020View
VOLUME 4 - PREFACESupporting Document · PDF15 Jan 2020View
ROTHES III - ADDITIONAL INFORMATION - NON-TECHCNICAL SUMMARYSupporting Document · PDF15 Jan 2020View
TRANSPORTATION MANAGERConsultation Response · PDF6 Jan 2020View
FIGURES 1.2 SITE LAYOUTSupporting Document · PDF20 Dec 2019View
FIGURES 1.3 - PROPOSED DEVELOPMENT AREASupporting Document · PDF20 Dec 2019View
FIGURE 1.1 REGIONAL CONTEXTSupporting Document · PDF20 Dec 2019View
FIGURE 3.1 - CONSTRAINTS TO SITE DESIGNSupporting Document · PDF20 Dec 2019View
FIGURE 3.2 - TURBINE LAYOUT DESIGN EVOLUTION OPTIONS A B C AND DSupporting Document · PDF20 Dec 2019View
FIGURE 3.4 - VIEWPOINT 5 - A95 EAST OF CRAIGELLACHIESupporting Document · PDF20 Dec 2019View
FIGURE 3.3 - VIEWPOINT 2 - A96 EAST OF ELGINSupporting Document · PDF20 Dec 2019View
FIGURE 3.5 - VIEWPOINT 6- A95 SOUTH OF ABERLOURSupporting Document · PDF20 Dec 2019View
FIGURE 3.6 - VIEWPOINT 13 - THE DUKE OF GORDN MONUMENT ELGINSupporting Document · PDF20 Dec 2019View
FIGURE 4.1A - INDICATIVE TURBINE SPECIFICATION 149.9M TIP HEIGHTSupporting Document · PDF20 Dec 2019View
FIGURE 4.1B - INDICATIVE TURBINE SPECIFICATION 175M TIP HEIGHTSupporting Document · PDF20 Dec 2019View
FIGURE 6.1A - HABITAT SURVEY RESULTS (MAP 1)Supporting Document · PDF20 Dec 2019View
FIGURE 6B - PHASE 1 HABITAT SURVEY RESULTS (MAP 2)Supporting Document · PDF20 Dec 2019View
FIGURE 6.1C - PHASE 1 HABITAT SURVEY RESULTS (MAP 3)Supporting Document · PDF20 Dec 2019View
FIGURE 6.1D - PHASE 1 HABITAT SURVEY RESULTS (MAP 4)Supporting Document · PDF20 Dec 2019View
FIGURE 6.1E - PHASE 1 HABITAT SURVEY RESULTS (MAP 5)Supporting Document · PDF20 Dec 2019View
FIGURE 6.1F - PHASE 1 HABITAT SURVEY RESULTS (OVERVIEW MAP)Supporting Document · PDF20 Dec 2019View
FIGURE 6..2A - NVC SURVEY RESULTSSupporting Document · PDF20 Dec 2019View
FIGURE 6..2B - NVC SURVEY RESULTS (MAP 2)Supporting Document · PDF20 Dec 2019View
FIGURE 6..2C - NVC SURVEY RESULTS (MAP 3)Supporting Document · PDF20 Dec 2019View
FIGURE 6..6D - NVC SURVEY RESULTS (MAP 4)Supporting Document · PDF20 Dec 2019View
FIGURE 6..2E - NVC SURVEY RESULTS (MAP 6)Supporting Document · PDF20 Dec 2019View
FIGURE 6..2EF- NVC SURVEY RESULTS (MAP 1B - DETAILED AREA)Supporting Document · PDF20 Dec 2019View
FIGURE 7.3 - STUDY AREA 2014 AND 2015Supporting Document · PDF20 Dec 2019View
FIGURE 7.1 - PROPOSED INFRSTRUCTURE LAYOUTSupporting Document · PDF20 Dec 2019View
FIGURE 8.1 - ZTV TO TIP HEIGHT *STUDY AREA)Supporting Document · PDF20 Dec 2019View
FIGURE 8.2 - ZONE OF THEORETICAL VISIBILITY TO TIP HEIGHT (STUDY AREA)Supporting Document · PDF20 Dec 2019View
FIGURE 8.3 - ZTV TO TIP HEIGHT (EXTRACT)Supporting Document · PDF20 Dec 2019View
FIGURE 8.4 - ZTV TO TIP HEIGHT (STUDY AREA)Supporting Document · PDF20 Dec 2019View
FIGURE 8.4A - THEORETICAL VISIBILITY OF AVIATION LIGHTING BY INTENSITYSupporting Document · PDF20 Dec 2019View
FIGURE 8.5 - DESIGNATES LANDSCAPESSupporting Document · PDF20 Dec 2019View
FIGURE 8.6 - LANDSCAPE CHARACTERSupporting Document · PDF20 Dec 2019View
FIGURE 8.7 - VISUAL RECEPTORSSupporting Document · PDF20 Dec 2019View
FIGURE 8.8 - WIND FARMS CONSIDERED IN THE CUMULATIVE ASSESSMENTSupporting Document · PDF20 Dec 2019View
FIGURE 8.9 - CUMULATIVE ZTV WITH EXISTING UDER CONSTRUCTION WIND FARMSSupporting Document · PDF20 Dec 2019View
FIGURE 8.10 - CUMULATIVE ZRV WITH EXISTING ROTHES I AND IISupporting Document · PDF20 Dec 2019View
FIGURE 8.11 - CUMULATIVE ZTV SCENARIO 2 BASELINE AND CONSENTED WIND FARMSSupporting Document · PDF20 Dec 2019View
FIGURE 8.12 - CUMULATIVE ZTV SCENARIO 3 - SCENARION 2 WITH SUBMITTED WIND FARMSSupporting Document · PDF20 Dec 2019View
FIGURE 8.13A - CUMULATIVE ZTV WITH EXISTING ROTHES 1 AND II AND CONSENTED KELLASSupporting Document · PDF20 Dec 2019View
FIGURE 8.13B - CUMULATIVE ZTV WITH HILL OF TOWIE I AND IISupporting Document · PDF20 Dec 2019View
FIGURE 8.13C - CUMULATIVE ZTV WITH PH I AND II AND BERRY BURNSupporting Document · PDF20 Dec 2019View
FIGURE 8.13C - CUMULATIVE ZTV WITH PH1 AND II AND BERRY BURNSupporting Document · PDF20 Dec 2019View
FIGURE 8.13D - CUMULATIVE ZTV WITH GALSH GOUR APPLICATION SITESupporting Document · PDF20 Dec 2019View
FIGURE 8.13E - CUMULATIVE ZTV WITH CLASH GOUR AMENDED PROPOSALSupporting Document · PDF20 Dec 2019View
FIGURE 8.14 - VIEW POINT 1 - A941 SOUTH OF LOSSIEMOUTHSupporting Document · PDF20 Dec 2019View
FIGURE 8.15 - VIEWPOINT 2 - A96 EAST OF ELGINSupporting Document · PDF20 Dec 2019View
FIGURE 8.16 - VIEWPOINT 3 - B9106 AULTMORESupporting Document · PDF20 Dec 2019View
FIGURE 8.17 - VIEWPOINT 4 - BEN AIGANSupporting Document · PDF20 Dec 2019View
FIGURE 8.18 - VIEWPOINT 5 - A95 EAST OF CRAIGELLACHIESupporting Document · PDF20 Dec 2019View
FIGURE 8.19 - VIEWPOINT 6 - A95 SOUTH OF ABERLOURSupporting Document · PDF20 Dec 2019View
FIGURE 8.20 - VIEWPOINT 7 BENRINNESSupporting Document · PDF20 Dec 2019View
FIGURE 8.21 - CIEWPOINT 8 CAIRN A GHILLE SUMIT HILLS OF CROMDALESupporting Document · PDF20 Dec 2019View
FIGURE 8.22 - VIEWPOINT 9 DALLAS CASTLESupporting Document · PDF20 Dec 2019View
NOTICESupporting Document · PDF19 Dec 2019View
PLANNING STATEMENTSupporting Document · PDF19 Dec 2019View
LETER FROM DPEA RE PUBLIC INQUIRIESCorrespondence to Council19 Dec 2019View
TRANSPORTATION MANAGERConsultation Response · PDF30 May 2019View
PRIVATE WATER SUPPLIESConsultation Response · PDF11 Apr 2019View
ABERDEENSHIRE ARCHAEOLOGY SERVICEConsultation Response · PDF5 Apr 2019View
MORAY FLOOD RISK MANAGEMENTConsultation Response · PDF5 Apr 2019View
CONTAMINATED LANDConsultation Response · PDF5 Apr 2019View
BUILDING STANDARDS MANAGERConsultation Response · PDF3 Apr 2019View
ABERDEENSHIRE ARCHAEOLOGY SERVICEConsultation Response20 Mar 2019View
10 - HYDROLOGY GEOLOGYSupporting Document · PDF21 Feb 2019View
APPENDIX 10.1 - GEOTECHNICAL DESK STUDYSupporting Document · PDF21 Feb 2019View
APPENDIX 10.2 - PEAT STABILITY ASSESSMENTSupporting Document · PDF21 Feb 2019View
APPENDIX 10.3 - PEAT MANAGEMENT PLANSupporting Document · PDF21 Feb 2019View
APPENDIX 10.4 - BORROW PIT REPORTSupporting Document · PDF21 Feb 2019View
APPENDIX 10.5 - CARBON BALANCE ASSESSMENTSupporting Document · PDF21 Feb 2019View
APPENDIX 10.6 WATERCOURSE CROSSING ASSESSMENTSupporting Document · PDF21 Feb 2019View
APPENDIX 10.7 - PRIVATE WATER SUPPLYSupporting Document · PDF21 Feb 2019View
APPENDIX 10.8 - MITIGATIONSupporting Document · PDF21 Feb 2019View
FIGURE 10.1 - HYDROLOGICAL CHARACTERISTICSSupporting Document · PDF21 Feb 2019View
FIGURE 10.2 - FLOW ACCUMULATIONSupporting Document · PDF21 Feb 2019View
FIGURE 10.3 - TOPOGRAPHICAL WETNESS INDEXSupporting Document · PDF21 Feb 2019View
FIGURE 10.4 - PREDOMINANT SOIL TYPESSupporting Document · PDF21 Feb 2019View
FIGURE 10.5 - CARBON AND PEATLAND SOILSSupporting Document · PDF21 Feb 2019View
FIGURE 10.6 - INTERPOLATED PEAT DEPTHSSupporting Document · PDF21 Feb 2019View
FIGURE 10.7 - SUPERFICIAL GEOLOGYSupporting Document · PDF21 Feb 2019View
FIGURE 10.8 - SOLID GEOLOGYSupporting Document · PDF21 Feb 2019View
FIGURE 10.9 - POTENTIAL GWDTESupporting Document · PDF21 Feb 2019View
FIGURE 10.10 - GEOMORPHOLOGICAL MAPSupporting Document · PDF21 Feb 2019View
FIGURE 10.11 - SLOPE ANGLESupporting Document · PDF21 Feb 2019View
FIGURE 10.12 - ENVIRONMENTAL IMPACT ZONESSupporting Document · PDF21 Feb 2019View
FIGURE 10.13 - PEAT STABILITY RISKSupporting Document · PDF21 Feb 2019View
FIGURE 10.14 - PEAT CORE AND SHEAR VANE LOCATIONSSupporting Document · PDF21 Feb 2019View
11 - FORESTRYSupporting Document · PDF21 Feb 2019View
FIGURE 11.1 - FOREST OVERVIEWSupporting Document · PDF21 Feb 2019View
FIGURE 11.2 - FOREST STUDY AREASupporting Document · PDF21 Feb 2019View
FIGURE 11.3 - AGE CLASS STRUCTURE (20121)Supporting Document · PDF21 Feb 2019View
FIGURE 11.4 - SPECIES COMPOSITION (2021)Supporting Document · PDF21 Feb 2019View
FIGURE 11.5 - BASELINE FELLING PLAN (2021)Supporting Document · PDF21 Feb 2019View
FIGURE 11.6 - BASELINE RESTOCK SPECIESSupporting Document · PDF21 Feb 2019View
FIGURE 11.7 - WIND FARL FELLING PLAN (2021)Supporting Document · PDF21 Feb 2019View
FIGURE 11.8A - WIND FARM SPECIES PLAN (2031)Supporting Document · PDF21 Feb 2019View
FIGURE 11.8B - WIND FARM FUTURE SPECIESSupporting Document · PDF21 Feb 2019View
12 - TRAFFIC AND TRANSPORTSupporting Document · PDF21 Feb 2019View
APPENDIX 12.1 - ABNORMAL LOADS ASSESSMENTSupporting Document · PDF21 Feb 2019View
APPENDIX 12.2 - RAW DATA - MINOR ROADSSupporting Document · PDF21 Feb 2019View
APPENDIX 12.3 - DFT TRAFFIC COUNTS RAW DATASupporting Document · PDF21 Feb 2019View
APPENDIX 12.4 - CONVERSION CALCULATIONSSupporting Document · PDF21 Feb 2019View
APPENDIX 12.5 - GROWTH CALCULATIONSSupporting Document · PDF21 Feb 2019View
FIGURES 12.1Supporting Document · PDF21 Feb 2019View
13 - NOISE ASSESSMENTSupporting Document · PDF21 Feb 2019View
FIGURE 13.1Supporting Document · PDF21 Feb 2019View
14 - AVIATION AND EXISTING INFRASTRUCURESupporting Document · PDF21 Feb 2019View
APPENDIX 14.1 - CONSULTATION RESPONSE NOT IN SCOPING OPINIONSupporting Document · PDF21 Feb 2019View
FIGURE 14.1 - THEORETICAL VISIBILITY FROM INVERNESS APIRPORT RADASSupporting Document · PDF21 Feb 2019View
15 - SOCIOECONOMIC CONTEXTSupporting Document · PDF21 Feb 2019View
5 - APPROACH TO EIARSupporting Document · PDF19 Feb 2019View
6 - ECOLOGYSupporting Document · PDF19 Feb 2019View
APPENDIX 6.1 ECOLOGY TECHNICAL APPENDIXSupporting Document · PDF19 Feb 2019View
FIGURE 6.1 SITE LOCATION AND CONTEXTSupporting Document · PDF19 Feb 2019View
7 - ORNITHOLOGYSupporting Document · PDF19 Feb 2019View
APPENDIX 8.1 LVIA METHODOLOGYSupporting Document · PDF19 Feb 2019View
APPENDIX 8.2 LANDSCAPE ASSESSMENTSupporting Document · PDF19 Feb 2019View
APPENDIX 8.3 VISUAL ASSESSMENTSupporting Document · PDF19 Feb 2019View
APPENDIX 8.4 CUMULATIVE LANSCAPE AND VISUAL IMPACT ASSESSMENTSupporting Document · PDF19 Feb 2019View
APPENDIX 8.5 RVAASupporting Document · PDF19 Feb 2019View
FIGURE 8.1 ZTV TO TIP HEIGHT (STUDY AREA)Supporting Document · PDF19 Feb 2019View
FIGURE 8.02 ZTV TO TIP HEIGHTSupporting Document · PDF19 Feb 2019View
FIGURE 8.3 ZTV TO TIP HEIGHTSupporting Document · PDF19 Feb 2019View
FIGURE 8.4 ZTV TO HUB HEIGHT (STUDY AREA)Supporting Document · PDF19 Feb 2019View
FIGURE 8.4A AVIATION LIGHTING ZTVSupporting Document · PDF19 Feb 2019View
FIGURE 8.5 DESIGNATION LANDSCAPESSupporting Document · PDF19 Feb 2019View
FIGURE 8.6 LANDSCAPE CHARACTERSSupporting Document · PDF19 Feb 2019View
FIGURE 8.7 VISUAL RECEPTORSSupporting Document · PDF19 Feb 2019View
FIGURE 8.8 WIND FARMS CONSIDERED IN CUMULATIVE ASSESSMENTSupporting Document · PDF19 Feb 2019View
FIGURE 8.9 CUMULATIVE ZTV WITH EXISTING UNDER CONSTRUCTION WINF FARMSSupporting Document · PDF19 Feb 2019View
FIGURE 8.10 CUMULATIVE ZTV WITH EXISTING ROTHED I AND IISupporting Document · PDF19 Feb 2019View
FIGURE 8.11 CUMULATIVER ZTV SCENARIO BASELINE WITH CONSENTED WIND FARMSSupporting Document · PDF19 Feb 2019View
FIGURE 8.12 CUMULATIVE ZTV SCENARION 3 - SCENARION 2 WITH SUBMITTED WIND FARMSSupporting Document · PDF19 Feb 2019View
FIGURE 8.13A CUMULATIVE ZTV WITH EXISTING ROTHES I II AND CONSENTED KELLAS & MESupporting Document · PDF19 Feb 2019View
FIGURE 8.13B CUMULATIVE ZTV WITH HILL OF TOWIE I & IISupporting Document · PDF19 Feb 2019View
FIGURE 8.13C CUMULATIVE ZTV WITH PHI AND II ANF BERRY BURNSupporting Document · PDF19 Feb 2019View
FIGURE 8.14 VISUALISATION 1 A941 SOUTH OF LOSSIEMOUTHSupporting Document · PDF19 Feb 2019View
FIGURE 8.15 VISUALISATION 2 A96 EAST OF ELGINSupporting Document · PDF19 Feb 2019View
FIGURE 8.16 VISUALISATION 3 B9106 AULTMORESupporting Document · PDF19 Feb 2019View
FIGURE 8.17 VISUALISATION 4 BEN AIGANSupporting Document · PDF19 Feb 2019View
FIGURE 8.18 VISUALISATION 5 A95 EAST OF CRAIGELLACHIESupporting Document · PDF19 Feb 2019View
FIGURE 8.19 VISUALISATION 6 A95 SOUTH OF ABERLOURSupporting Document · PDF19 Feb 2019View
FIGURE 8.20 VISUALISATION 7 BEN RINNESSupporting Document · PDF19 Feb 2019View
FIGURE 8.21 VISUALISATION 8 CARN A GHILLE CHEARR SUMMIT HILLS OF CROMDATESupporting Document · PDF19 Feb 2019View
FIGURE 8.22 VISUALISATION 9 DALLAS CASTLESupporting Document · PDF19 Feb 2019View
FIGURE 8.23 VISUALISATION 10 MINOR ROAD KNOCKANDO TO DALLASSupporting Document · PDF19 Feb 2019View
FIGURE 8.24 VISUALISATION 11 B9102 WEST OF ARCHIESTOWNSupporting Document · PDF19 Feb 2019View
FIGURE 8.25 VISUALISATION 12 OLD MILITARY ROAD BALMORE TO CAWDORSupporting Document · PDF19 Feb 2019View
FIGURE 8.26 VISUALISATION 13 THE DUKE OF GORDON MONUMENT ELGINSupporting Document · PDF19 Feb 2019View
FIGURE 8.27 VISUALISATION 14 CARN NA LOINESupporting Document · PDF19 Feb 2019View
FIGURE 8.28 VISUALISATION 15 CARN DIAMHSupporting Document · PDF19 Feb 2019View
FIGURE 8.29 VISUALISATION 16 CNAP CHAOCHAN AITINNSupporting Document · PDF19 Feb 2019View
FIGURE 8.30 VISUALISATION 17 BYNACK MORESupporting Document · PDF19 Feb 2019View
FIGURE 8.31 VISUALISATION 18 BLACKSBOAT BRIDGESupporting Document · PDF19 Feb 2019View
FIGURE 8.32 PROPERTIES CONSIDERED IN THE RESIDENTIAL VISUAL AMENITY ASSESSMENTSupporting Document · PDF19 Feb 2019View
FIGURE 8.33 RVAA WIRELINE PROPERTY 1 LYLE OF KNOCKANDOSupporting Document · PDF19 Feb 2019View
FIGURE 8.34 RVAA WIRELINE PROPERTY 2 KNOCKANGORESupporting Document · PDF19 Feb 2019View
FIGURE 8.35 RVAA WIRELINE PROPERTY 3 BALCKHILLOCKSupporting Document · PDF19 Feb 2019View
FIGURE 8.36 RVAA WIRELINE PROPERTY 4 BRACKENHOWESSupporting Document · PDF19 Feb 2019View
FIGURE 8.37 RVAA WIRELINE PROPERTY 5 BURNSIDE OF BALLINTOMBSupporting Document · PDF19 Feb 2019View
FIGURE 8.38 RVAA WIRELINE PROPERTY 6 LYNESSupporting Document · PDF19 Feb 2019View
FIGURE 8.39 RVAA WIRELINE PROPERTY 7 MOSS STREET PROPERTYSupporting Document · PDF19 Feb 2019View
FIGURE 8.40 RVAA WIRELINE PROPERTY 8 NORTH ROBERTSOWNSupporting Document · PDF19 Feb 2019View
FIGURE 8.41 RVAA WIRELINE PROPERTY 9 NEWLANDS-ROBERSTONWSupporting Document · PDF19 Feb 2019View
FIGURE 8.42 RVAA WIRELINE PROPERTY 10 ALLACHROWSupporting Document · PDF19 Feb 2019View
FIGURE 8.43 RVAA WIRELINE PROPERTY 11 ARCHIESTOWN ASupporting Document · PDF19 Feb 2019View
FIGURE 8.44 RVAA WIRELINE PROPERTY 12 ARCHIESTOWN BSupporting Document · PDF19 Feb 2019View
FIGURE 8.45 RVAA WIRELINE PROPERTY 13 ARCHIESTOWN CSupporting Document · PDF19 Feb 2019View
FIGURE 8.46 RVAA WIRELINE PROPERTY 14 ARCHIESTOWN DSupporting Document · PDF19 Feb 2019View
FIGURE 8.47 RVAA WIRELINE PROPERTY 15 ARCHIESTOWN ESupporting Document · PDF19 Feb 2019View
FIGURE 8.48 SETTLEMENT WIRELINE CHARLESOWN OF ABERLOURSupporting Document · PDF19 Feb 2019View
FIGURE 8.49 SETTLEMENT WIRELINE ARCHIESTOWNSupporting Document · PDF19 Feb 2019View
FIGURE 8.50 SETTLEMENT WIRELINE CRAIGELLACHIESupporting Document · PDF19 Feb 2019View
FIGURE 8.51 SETTLEMENT WIRELINE DALLASSupporting Document · PDF19 Feb 2019View
FIGURE 8.52 SETTLEMENT WIRELINE ELGINSupporting Document · PDF19 Feb 2019View
FIGURE 8.53 SETTLEMENT WIRELINE UPPER KNOCKANDO AND CARDHUSupporting Document · PDF19 Feb 2019View
9 - CULTURAL HERITAGESupporting Document · PDF19 Feb 2019View
APPENDIX 9.1 CULTURAL HERITAGE ASSETS WITHIN THE INNER STUDY AREASupporting Document · PDF19 Feb 2019View
APPENDIX 9.2CULTURAL HERITAGE ASSETS WITHIN THE OUTER STUDY AREASupporting Document · PDF19 Feb 2019View
FIGURE 9.1 CULTURAL HERITAGE INNER STUDY AREASupporting Document · PDF19 Feb 2019View
FIGURE 9.2CULTURAL HERITAGE CONSTRAINTS WITHIN THE OUTER STUDY AREASupporting Document · PDF19 Feb 2019View
FIGURE 9.3 CULTURAL HERITAGE VISUALISATION 1 ROTHES CASTLESupporting Document · PDF19 Feb 2019View
FIGURE 9.4 CULTURAL HERITAGE VISUALISATION 2 KNOCKNDO KIRKYARDSupporting Document · PDF19 Feb 2019View
FIGURE 9.5 CULTURAL HERITAGE VISUALISATION 3 KNOCKANDO HOUSESupporting Document · PDF19 Feb 2019View
PLANNING DESIGN AND ACCESS STATEMENTSupporting Document · PDF19 Feb 2019View
VOLUM 1 NON TECHNICAL SUMMARYSupporting Document · PDF19 Feb 2019View
PRE APPLICATION CONSULTATION REPORTSupporting Document · PDF19 Feb 2019View
VOLUME 3BSupporting Document · PDF19 Feb 2019View
VOLUME 4Supporting Document · PDF19 Feb 2019View
VOLUME 2Supporting Document · PDF19 Feb 2019View
VOLUME 3ASupporting Document · PDF19 Feb 2019View
VOLUME 2 CONTENTSSupporting Document · PDF19 Feb 2019View
VOLUME 3A CONTENTSSupporting Document · PDF19 Feb 2019View
VOLUME 3B CONTENTSSupporting Document · PDF19 Feb 2019View
VOLUME 4 CONTENTSSupporting Document · PDF19 Feb 2019View
A3 BACK COVERSupporting Document · PDF19 Feb 2019View
VOLUME 2 FRONT COVERSupporting Document · PDF19 Feb 2019View
VOLUME 3A COVERSupporting Document · PDF19 Feb 2019View
VOLUME 3B COVERSupporting Document · PDF19 Feb 2019View
VOLUME 4 FRONT COVERSupporting Document · PDF19 Feb 2019View
SUMMARY RESIDUAL EFFECTS AND MITIGATIONSupporting Document · PDF19 Feb 2019View
16 - ACCESSSupporting Document · PDF19 Feb 2019View
FIGURE 16.1 CURRENT ACCESS ROUTESSupporting Document · PDF19 Feb 2019View
FIGURE 16.2 POTENTIAL ACCESS LINKSupporting Document · PDF19 Feb 2019View
1 - CHAPTER 1 - INTRODUCTIONSupporting Document · PDF14 Feb 2019View
APPENDIX 1.1 - SCOPING REPORTSupporting Document · PDF14 Feb 2019View
APPENDIX 1.2 - SCOPING OPINIONSupporting Document · PDF14 Feb 2019View
APPENDIX 1.3 - ROTHES I AND II PLANNING CONSENTSSupporting Document · PDF14 Feb 2019View
FIGURE 1.1 REGIONAL CONTECTSupporting Document · PDF14 Feb 2019View
FIGURE 1.2 SITE LAYOUTSupporting Document · PDF14 Feb 2019View
FIGURE 1.3 PROPOSED DEVELOPMENTSupporting Document · PDF14 Feb 2019View
2 - POLICY CONTEXTSupporting Document · PDF14 Feb 2019View
3 - SITE SELECTION AND DESIGN EVOLUTIONSupporting Document · PDF14 Feb 2019View
FIGURE 3.1 - CONSTRAINTS TO SITE DESIGNSupporting Document · PDF14 Feb 2019View
FIGURE 3.2- TURBINE LAYOUT DESIGN EVOLUTION OPTIONS A B AND CSupporting Document · PDF14 Feb 2019View
FIGURE 3.3 - TURBINE LAYOUT EVOLUTION WIRELINES VP2 A96 EAST OF ELGINSupporting Document · PDF14 Feb 2019View
FIGURE 3.4 - TURBINE LAYOUT EVOLUTION WIRELINES VP5 A95 EASR OF CRAIGELLACHIESupporting Document · PDF14 Feb 2019View
FIGURE 3.5 - TURBINE LAYOUT EVOLUTION WIRELINESSupporting Document · PDF14 Feb 2019View
FIGURE 3.6 - TURBINE LAYOUT EVOLUTION WIRELINES VP13 THE DUKE OF GORDON MONUMENTSupporting Document · PDF14 Feb 2019View
4 - DESCRIPTION OF DEVELOPMENTSupporting Document · PDF14 Feb 2019View
FIGURE 4.1 - TYPLICAL ON SITE SUBMSTATION LAYOUT PLANDrawing · PDF14 Feb 2019View
FIGURE 4.1B - TYPLICAL ON SITE SUBMSTATION ELEVATIONSDrawing · PDF14 Feb 2019View
FIGURE 4.2 - TYPLICAL CONSTRUCTION COMPOUNDDrawing · PDF14 Feb 2019View
FIGURE 4.3A - INDICATIVE TURBINE SPECIFICATION 149.9M TIP HEIGHTDrawing · PDF14 Feb 2019View
FIGURE 4.3B- INDICATIVE TURBINE SPECIFICATION 200M TIP HEIGHTDrawing · PDF14 Feb 2019View
FIGURE 4.3C - INDICATIVE TURBINE SPECIFICATION 225M TO TIP HEIGHTDrawing · PDF14 Feb 2019View
FIGURE 4.4 - TYPLICAL TURBINE TRANSFORMER HOUSINGDrawing · PDF14 Feb 2019View
FIGURE 4.5 - TYPLICAL CRANE HARDSTANDING AREADrawing · PDF14 Feb 2019View
FIGURE 4.6 - TYPLICAL TURBINE FOUNDATION SPECIFICATIONDrawing · PDF14 Feb 2019View
FIGURE 4.7 - TYPICAL ZEPHIR HOUSINGDrawing · PDF14 Feb 2019View
FIGURE 4.8 - TYPICAL TRACK CONSTRUCTIONDrawing · PDF14 Feb 2019View
FIGURE 4.9 - TYPLICAL TRACK CROSS DRAINAGEDrawing · PDF14 Feb 2019View
FIGURE 4.10 - TYPICAL CABLE TRENCH SECTION(2 CABLES)Drawing · PDF14 Feb 2019View
FIGURE 4.11 - TURBINE SIGNAGEDrawing · PDF14 Feb 2019View
FIGURE 4.12 - INDICATIVE DIRECTIONAL DISPLAY OPTIONSDrawing · PDF14 Feb 2019View
FIGURE 4.13 - INDICATIVE STORAGE SHED PLAN AND ELEVATIONSDrawing · PDF14 Feb 2019View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Expiry Date for Comments

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source
  6. Decision Made Date

    Published milestoneCouncil source
  7. Standard Consultation Date

    Published milestoneCouncil source
  8. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Objections
DECISION LETTER
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.