Council planning record

Proposed wind farm comprising of 7 wind turbines 6 of a maximum height base to tip not exceeding 149.9m and 1 of maximum height not exceeding 134m external transformer housing site tracks crane pad foundations underground electricity cable control building temporary construction and compound 2 borrow pits associated works/infrastructure and health and safety signage at

Paul's Hill II Wind Farm Ballindalloch Moray

UnknownReference: 18/00523/S36Moray

Application location

Paul's Hill II Wind Farm Ballindalloch Moray

This record has no verified map location.

View council map

Application summary

Status
Unknown
Application type
Dealt With By Scottish Executive
Received
16 Apr 2018
Validated
25 Apr 2018
Determination deadline
25 Aug 2018
Local authority
Moray

Application overview

Proposed wind farm comprising of 7 wind turbines 6 of a maximum height base to tip not exceeding 149.9m and 1 of maximum height not exceeding 134m external transformer housing site tracks crane pad foundations underground electricity cable control building temporary construction and compound 2 borrow pits associated works/infrastructure and health and safety signage at

Proposal details

Reference
18/00523/S36
Ward
Speyside Glenlivet
Agent
Natural Power Consultants Limited

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 187 of 187

DocumentPublishedAction
DECISION NOTICEDecision · PDF11 Dec 2020View
DAVID PARKER PL1 PRECOGNITION NOISE 05.11.19 CHANGESSupporting Document · PDF15 Nov 2019View
DAVID PARKER PL1 PRECOGNITION NOISE REV 05.11.19Supporting Document · PDF15 Nov 2019View
DB1 THE WIND SHEAR EXPONENT COMPAIRING MEASURED AGAINSTSupporting Document · PDF15 Nov 2019View
DB2 BOWDLER WIND SHEAR AND ITS EFFECT ON NOISE ASSESSMENTSupporting Document · PDF15 Nov 2019View
DB3 BOWDLER ET AL IOA BULLETIN MARCH-APRIL 2009Supporting Document · PDF15 Nov 2019View
DB4 COX ET WHERE ETSU IS SILENTSupporting Document · PDF15 Nov 2019View
DB5_WTN2017 EIDERS 055Supporting Document · PDF15 Nov 2019View
DB6 INFO ICE61400-11{ED3.0}Supporting Document · PDF15 Nov 2019View
DB7 HANNAH L NZA2007 (A)Supporting Document · PDF15 Nov 2019View
DB8 INVESTIGATION OF A MICROPHONE HEIGHT CORRECTION FOR LONG RANGE WIND FARM NOISupporting Document · PDF15 Nov 2019View
DB10 IOA STATEMENT ON WIND FARM NOUSE ASSESSMENT 19.12.2014Supporting Document · PDF15 Nov 2019View
DB11 LELOUDAS ET AL 2007Supporting Document · PDF15 Nov 2019View
DB12 OHLIND THESISSupporting Document · PDF15 Nov 2019View
DB13 REF INFO NOTE 120403 IOA SHEAR METHODOLOGYSupporting Document · PDF15 Nov 2019View
DB14 REF PR 20.05.13IOA GUIEDELINES - REF 20.05.13 IOA GUIDELINESSupporting Document · PDF15 Nov 2019View
DB15 REFLOACONSULTATION 20.14.19Supporting Document · PDF15 Nov 2019View
DB16 REF RESPONSE TO IOAAM CONSULTATION QUESTIONNAIRESupporting Document · PDF15 Nov 2019View
DB18 STUDY REPORT COMPARISON OF THEARTICLEAN ETSUW111001 FINALSupporting Document · PDF15 Nov 2019View
DB19 STIGWOOD M IOA GOOD PARCTICE GUIDE AMPLITUTE MODULATION WIND FARM NOISE CONSupporting Document · PDF15 Nov 2019View
DB20 SUMMARY ETSU IOA ARTCILESupporting Document · PDF15 Nov 2019View
DB22 VAN DEN BERG 17 THESISSupporting Document · PDF15 Nov 2019View
DB23 NZ6808-2010 THECHNICAL STANDARDS 325-328Supporting Document · PDF15 Nov 2019View
DB24 INTERNOISE 2017 MIKE STIGWOOD MAS ENVIRONMENTALSupporting Document · PDF15 Nov 2019View
DB25 HANSEN E AL 2012Supporting Document · PDF15 Nov 2019View
DB26 DECC REPORT 2293 R1 REPORT FINAL 06.04.11 - HOW NOISE IMPACTSSupporting Document · PDF15 Nov 2019View
DB28 M O'CONNER ARTICLESupporting Document · PDF15 Nov 2019View
DB29 PAULS HILL WIND FARM NOISE MEASUREMENTS MONITORING UPDATE N04320103Supporting Document · PDF15 Nov 2019View
DB30 WIND FARM NOISE RECORDED ALMOST 9KM AWAY - FLINDERS NEWSSupporting Document · PDF15 Nov 2019View
DOCUMENT 1 CREDENTIALS AND METHODOLOGY STATEMENT - DT THOMAS GOUGHSupporting Document · PDF15 Nov 2019View
DOCUMENT 3 NATURAL POWER - NON TECHNICAL SUMMARY SEPT 2001Supporting Document · PDF15 Nov 2019View
DOCUMENT 4 CORGLASS FARM SITE LAYOUTSupporting Document · PDF15 Nov 2019View
DOCUMENT 5 MALT WHISKY TRAIL BROCHURESupporting Document · PDF15 Nov 2019View
DOCUMENT 6 SPIRIT OF SPEYSIDE WHISKY FESTIVAL MAPSupporting Document · PDF15 Nov 2019View
DOCUMENT 7 SPIRIT OF SPEYSIDE WHISKY FESTIVAL MAP WITH OVERALL COMBINED CUMULATISupporting Document · PDF15 Nov 2019View
NOISE INQUIRY SESSIONS DOCUMENT REFERENCE LIST 06.11.19Supporting Document · PDF15 Nov 2019View
PRE INQUIRY MEETING MINUTEAppeal Correspondence26 Mar 2019View
TRANSPORTATION MANAGERConsultation Response · PDF2 Nov 2018View
ABERDEENSHIRE ARCHAEOLOGY SERVICEConsultation Response · PDF3 Sept 2018View
ENVIRONMENTAL HEALTHConsultation Response · PDF17 Aug 2018View
TRANSPORTATION MANAGER - HOLDINGConsultation Response · PDF23 May 2018View
BUILDING STANDARDS MANAGERConsultation Response · PDF16 May 2018View
PRIVATE WATER SUPPLIESConsultation Response · PDF10 May 2018View
MORAY FLOOD RISK MANAGEMENTConsultation Response · PDF8 May 2018View
CONTAMINATED LANDConsultation Response · PDF4 May 2018View
VOLUME 3 - FIGURE 6.13A CUMULATIVE ZTV WITH PH1 AND BERRYBURNSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 6.13B CUMULATIVE ZTV WITH ROTHES I AND IISupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 6.13C CUMULATIVE ZTV WITH HILL OF TOWIE I AND IISupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 6.13D CUMULATIVE ZTV WITH DORENELL AND CLASHINDARROCHSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 6.13E CUMULATIVE ZTV WITH DORENELL VARIATION AND EXTENSIONSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 6.13F CUMULATIVE ZTV WITH MEIKLE HILL AND KELLASSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 6.13G CUMULATIVE ZTV WITH HILL OF GLASCHYLE AND CAIRN DUHIESupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 6.13H CUMULATIVE ZTV SCENARIO 1(OPERATIONALIN CONSTRUCTION WSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 6.13J CUMULATIVE ZTV SCENARIO 2(OPERATIONALIN CONSTRUCTION ANSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 6.13K CUMULATIVE ZTV SCENARIO 3(OPERATIONALIN CONSTRUCTION COSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 6.14A VISUALISATION 1 TORMORE DISTILLERYSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 6.14B VISUALISATION 2 BEN AIGANSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 6.14C VISUALISATION 3 BEN RINNESSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 6.14D VISUALISATION 4 MINOR ROAD KNOCKANDO TO DALLASSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 6.14E VISUALISATION 5 CARN A GHILE CHEARRSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 6.14F VISUALISATION 6 ARCHIESTOWNSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 6.14G VISUALISATION 7 UPPER KNOCKANDOSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 6.14H VISUALISATION 8 CARN DIAMHSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 6.14J VISUALISATION 9 A95 BETWEEN ABERLOUR AND BALLINDALLOCHSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 6.14K VISUALISATION 10 A95 MEMORIAL AT JUNCTION WITH B9008Supporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 6.15A TO 6.15D PH2 SEQUENTIAL ROUTE WIREFRAMES VPS 1 - 4Supporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE7.3 PH2 ELECTROFISHING AND MACROINVERTEBRATE SURVEY LOCATIONSSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE7.5A PH2 2014 AND 2017 NVC SURVEY RESULTS ABD TNS 1Supporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE7.5B PH2 2014 AND 2017 NVC SURVEY RESULTS ABD TNS 2Supporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE7.5C PH2 2014 AND 2017 NVC SURVEY RESULTS AND TNS 3Supporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 8.1 VP LOCATIONS AND VIEWSHEDS 2017Supporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 8.2.PH2 STUDY AREA - RAPTOR AND BK SURVEYSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 8.4 PH2 BREEDING SEASON VP SURVEY RESULTS 2014-2015Supporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 8.5 PH2 NON BREEDING SEASON VP SURVEY RESULTS 2014-2015Supporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 9.1A CH ASSETS WITHIN INNER STUDY AREASupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 9.1B CH ASSETS ALONG PROPOSED ACCESS ROUTE AND GRID CONNECTIONSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 9.2 CH EXTERNAL RECEPTORS WITHIN OUTER STUDY AREASupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 9.3 CULTURAL HERITAGE VISUALISATION SM340 LAGMORE WEST, CHAMBESupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 9.4 CULTURAL HERITAGE VISUALISATION SM339 LAGMORE EAST, CHAMBESupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 9.5 CULTURAL HERITAGE VISUALISATION SM334 MARIONSBURGH, CHAMBESupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 9.6 CULTURAL HERITAGE VISUALISATION SM1225 KNOCKANDO KIRKYARDSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 9.7 CULTURAL HERITAGE VISUALISATION LB8449 BALLINDALLOCH CASTLSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 9.8 CULTURAL HERITAGE VISUALISATION 6 LB8449 BALLINDALLOCH CASSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 9.9 CULTURAL HERTITAGE VISUALISATION LB8450 BALLINDALLOCH CASTSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 10.1 HYDROLOGICAL CHARACTERISTICSSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 10.2 FLOW ACCUMULATIONSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 10.3 TOTOGRAPHICAL WETNESS INDEXSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 10.4 GROUNDWATER FLOODING POTENTIALSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 10.5 PEAT DEPTH (HYDROLOGYSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 10.6 SHEAR VANE LOCATIONSSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 10.7 PEAT CORE LOCATIONSSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 10.8 SLOPE CONSTRAINTSSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 10.9 GEOMORPHOLOGYSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 10.10 ENVIRONMENTAL IMPACT ZONESSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 10.11 SOLID GEOLOGYSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 10.12 SUPERFICIAL GEOLOGYSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 10.13 PEAT STABILITY HAZARD ZONESSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 10.14 PRIVATE WATER SUPPLIESSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 10.15 GWDTE AREASSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 10.16 GWDTE AREAS WITH CONTRIBUTION ZONESSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 11.1 PH2 INVERNESS RADAR TO TURBINE TIP HEIGHTSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 13.1 PAULS HILL II NOISE CONTOURSSupporting Document · PDF17 Apr 2018View
VOLUME 3 - FIGURE 13.2 PAULS HILL II CUMULATIVE NOISE CONTOURSSupporting Document · PDF17 Apr 2018View
VOLUME 3 - CONTENTSSupporting Document · PDF17 Apr 2018View
VOLUME 3 - PREFACESupporting Document · PDF17 Apr 2018View
VOLUME 4 - 1.2 SCOPING OPINION FROM ECU APPENDIXSupporting Document · PDF17 Apr 2018View
VOLUME 4 - 1.3 PAULS HILL WIND FARM CONSENT APPENDIXSupporting Document · PDF17 Apr 2018View
VOLUME 4 - 6 LVIA APPENDICESSupporting Document · PDF17 Apr 2018View
VOLUME 4 - 9 CULTURAL HERITAGE APPENDICESSupporting Document · PDF17 Apr 2018View
VOLUME 4 - 10.1 GEOTECHNICAL DESK STUDY APPENDIXSupporting Document · PDF17 Apr 2018View
VOLUME 4 - 10.2 PEAT STABILITY ASSESSMENT APPENDIXSupporting Document · PDF17 Apr 2018View
VOLUME 4 - 10.3 PEAT MANAGEMENT PLAN APPENDIXSupporting Document · PDF17 Apr 2018View
VOLUME 4 - 10.4 BORROW PIT SEARCH REPORT APPENDIXSupporting Document · PDF17 Apr 2018View
VOLUME 4 - 10.5 CARBON BALANCE ASSESSMENT APPENDIXSupporting Document · PDF17 Apr 2018View
VOLUME 4 - 10.6 WATERCROSSING ASSESSMENT APPENDIXSupporting Document · PDF17 Apr 2018View
VOLUME 4 - 10.7 PRIVATE WATER SUPPLY RISK ASSESSMENT APPENDIXSupporting Document · PDF17 Apr 2018View
VOLUME 4 - 10.8 GWDTE APPENDIXSupporting Document · PDF17 Apr 2018View
VOLUME 4 - 11 AVIATION AND EXISTING INFRASTRUCTURE APPENDICESSupporting Document · PDF17 Apr 2018View
VOLUME 4 - 12.1 TRAFFIC COUNT LOCATIONS APPENDIXSupporting Document · PDF17 Apr 2018View
VOLUME 4 - 12.2 AND 12.3 TRAFFID AND TRANSPORT DATA APPENDICESSupporting Document · PDF17 Apr 2018View
VOLUME 4 - CONTENTSSupporting Document · PDF17 Apr 2018View
VOLUME 4 - PREFACESupporting Document · PDF17 Apr 2018View
SECTION 36 REQUESTCorrespondence to Council · PDF17 Apr 2018View
PAC REPORTSupporting Document · PDF16 Apr 2018View
PLANNING DESIGN AND ACCESS STATEMENTSupporting Document · PDF16 Apr 2018View
VOLUME 2.1 - NON TECHNICAL SUMMARYSupporting Document · PDF16 Apr 2018View
VOLUME 2 - INTRODUCTIONSupporting Document · PDF16 Apr 2018View
VOLUME 2.2 - POLICY CONTECTSSupporting Document · PDF16 Apr 2018View
VOLUME 2.3 - SITE SELECTION AND DESIGN EVOLUTIONSupporting Document · PDF16 Apr 2018View
VOLUME 2.4 - DESCRIPTION OF DEVELOPMENTSupporting Document · PDF16 Apr 2018View
VOLUME 2.5 - APPROACH TO ESSupporting Document · PDF16 Apr 2018View
VOLUME 2.6 - LANDSCAPE AND VISUAL IMPACT ASSESSMENTSupporting Document · PDF16 Apr 2018View
VOLUME 2.8 - ORNITHOLOGYSupporting Document · PDF16 Apr 2018View
VOLUME 2.9 - CULTURAL HERITAGESupporting Document · PDF16 Apr 2018View
VOLUME 2.10 - HYDROLOGYSupporting Document · PDF16 Apr 2018View
VOLUME 2.11 - AVIATION AND EXISTING INFRASTRUCTURESupporting Document · PDF16 Apr 2018View
VOLUME 2.12 - TRAFFIC AND TRANSPORTSupporting Document · PDF16 Apr 2018View
VOLUME 2.13 - HUMAN HEALTH AND POPULATIONSupporting Document · PDF16 Apr 2018View
VOLUME 2.14 - SUMMARYSupporting Document · PDF16 Apr 2018View
VOLUME 2 - CONTENTSSupporting Document · PDF16 Apr 2018View
VOLUME 2 - PREFACESupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 1.1 REGIONAL CONTEXTSupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 1.2 SITE LAYOUTSupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 1.3 PROPOSED DEVELOPEMT AREASupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 3.1 PAULS HILL II SITE CONSTRAINTSSupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 3.2 PH2 REDESIGN OPTIONSSupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 3.3A PH2 DESIGN EVOLUTION OPTIONS A B CSupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 3.3B PH2 DESIGN EVOLUTION OPTIONS A B CSupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 4.1 ON SITE CONTROL BUILDING LAYOUTSupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 4.2 CONSTRUCTION COMPOUNDSupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 4.3A TURBINE SPECIFICATIONS 134M TO TIPSupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 4.3B TURBINE SPECIFICATIONS 149.9M TO TIPSupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 4.4 TRANSFORMER HOUSINGSupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 4.5 CRANE HARDSTANDING AREASupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 4.6 FOUNDATION SPECIFICATIONSSupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 4.7 ZEPHIR HOUSINGSupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 4.8 TRACK CONSTRUCTIONSupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 4.9 TRACK CROSS DRAINAGESupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 4.10 CABLE TRENCH (2 CABLES)Supporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 4.11 ON SITE CONTROL BUILDING - ELEVATIONSSupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 4.12 INDICATIVE DIRECTIONAL SIGNAGE DISPLAY OPTIONSSupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 4.13 TURBINE SIGNAGESupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 6.1 ZTV TO BLADE TIPSupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 6.2 ZTV TI TIP HEIGHT WITHIN CNPA NPSupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 6.3 BANDED ZTV TO HUBSupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 6.4 LANDSCAPE CHARACTERSupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 6.5 LANDSCAPE DESIGNATIONSSupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 6.6 RVAA PROPERTIESSupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 6.7A RESIDENTIAL 360 � WIREFRAME VP1 GLENARDER?Supporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 6.7B RESIDENTIAL 360 � WIREFRAME VP2 CONGLASS FARM BUILDING GRSupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 6.7C RESIDENTIAL 360 � WIREFRAME VP3 LEAKIN FARM BUILDING GROUSupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 6.7D RESIDENTIAL 90� PHOTOWIRE OVERLAY VP4 CORGLASS FARM HOLIDSupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 6.7E RESIDENTIAL 90� PHOTOWIRE OVERLAY VP5 CORGLASS FARM PARKISupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 6.8 RESIDENTAIL RECEPTORS SETTLEMENT LOCATIONS MAPSupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 6.8A SETTLEMENT WIREFRAME VP1 ARCHIESTOWNSupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 6.8B SETTLEMENT WIREFRAME VP2 UPPER KNOCKANDOSupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 6.8C SETTLEMENT WIREFRAME VP3 CRAIGELLACHIESupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 6.8D SETTLEMENT WIREFRAME VP4 DALLASSupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 6.9 SEQUENTIAL RECEPTOR LOCATION MAPSupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 6.10A SEQUENTIAL ROUTE ZTV - A95Supporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 6.10B SEQUENTIAL ROUTE ZTV - B9102Supporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 6.10C SEQUENTIAL ROUTE ZTV - MINOR ROAD DALLAS TO KNOCKANDOSupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 6.10D SEQUENTIAL ROUTE ZTV - MORAY CORE PATHS SP19Supporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 6.10E SEQUENTIAL ZTV - SPAYSIDE WAYSupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 6.10F SEQUENTIAL ZTV - B970Supporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 6.11 CUMULATIVE SEARCH AREA 60KMSupporting Document · PDF16 Apr 2018View
VOLUME 3 - FIGURE 6.12 CUMULATIVE BASELINESupporting Document · PDF16 Apr 2018View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Standard Consultation Date

    Published milestoneCouncil source
  5. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Issued Date

    Published milestoneCouncil source
  7. Decision Made Date

    Published milestoneCouncil source

Decision & conditions

Objections
DECISION NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.