Council planning record

Installation of an air source heat pump (ASHP) in the back garden. This will replace the existing gas boiler. The property is end-terrace and the heat pump will be fitted at ground level approximately 1 metre away from the boundary (wooden fence) of the adjoining property. There should be no alterations to the exterior of the building other than the entry point behind the ASHP. The ASHP model is: Daikin Altherma Monobloc EDLA-E 4kW

7 Oak Close Bulwark Chepstow Monmouthshire NP16 5RL

DecidedReference: DM/2024/00684Monmouthshire County Council

Last published check: 22 Sept 2026, 07:37. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  5. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Decision Issued Date

    Published milestoneCouncil source
  10. Decision Made Date

    Published milestoneCouncil source
  11. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided
Application type
Householder
Received
24 May 2024
Validated
7 Jun 2024
Determination deadline
2 Aug 2024
Local authority
Monmouthshire County Council

Application overview

Installation of an air source heat pump (ASHP) in the back garden. This will replace the existing gas boiler. The property is end-terrace and the heat pump will be fitted at ground level approximately 1 metre away from the boundary (wooden fence) of the adjoining property. There should be no alterations to the exterior of the building other than the entry point behind the ASHP. The ASHP model is: Daikin Altherma Monobloc EDLA-E 4kW

Proposal details

Reference
DM/2024/00684
Alternative references
PP-13095377
Ward
Bulwark And Thornwell
Parish
Chepstow Town Council

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

7 Oak Close Bulwark Chepstow Monmouthshire NP16 5RL

This record has no verified map location.

View council map

Documents 10 of 10

DocumentPublishedAction
OFFICER REPORTReport · PDF12 Aug 2024View
HOUSEHOLDER APPROVAL DECISION NOTICEDecision · PDF12 Aug 2024View
COMMENT - CHEPSTOW TOWN COUNCILConsultee Comment · PDF5 Jul 2024View
APPLICATIONFORMREDACTEDApplication Form · PDF24 May 2024View
LOCATION PLANDrawing · PDF24 May 2024View
SITE PLAN 1Drawing · PDF24 May 2024View
SITE PLAN 2Drawing · PDF24 May 2024View
EDLA04_06_08 DIMENSIONSPhoto · PDF24 May 2024View
EDLA04_06_08 - SPECSBackGround Papers · PDF24 May 2024View
PROPOSED SITE PLANDrawing · PDF24 May 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approve
HOUSEHOLDER APPROVAL DECISION NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.