Council planning record

Approval of details required by conditions 6 (external materials), 13 (Badger Survey), 15 (Great Crested Newt compensation), 17 ( Biodiversity Enhancement Scheme and Management Plan), 18 (Landscape Management and Maintenance Plan), 19 (hard and soft landscape works), 20 (Arboricutural Method Statement), 21 (estate roads, redways and footways) and 22 (finished floor and ground levels) of permission ref. 20/03372/FULMMA

Tattenhoe Park (Phase 2) Snelshall Street H7 To H8 Milton Keynes

Decision MadeReference: 21/03799/DISCONMilton Keynes City Council

Last published check: 8 Oct 2026, 00:04. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Decision Notice Sent Date

    Published milestoneCouncil source

Application summary

Status
Decision Made
Application type
Approval of details reserved by condition
Received
Not published
Validated
Not published
Determination deadline
Not published
Local authority
Milton Keynes City Council

Application overview

Approval of details required by conditions 6 (external materials), 13 (Badger Survey), 15 (Great Crested Newt compensation), 17 ( Biodiversity Enhancement Scheme and Management Plan), 18 (Landscape Management and Maintenance Plan), 19 (hard and soft landscape works), 20 (Arboricutural Method Statement), 21 (estate roads, redways and footways) and 22 (finished floor and ground levels) of permission ref. 20/03372/FULMMA

Proposal details

Reference
21/03799/DISCON
Ward
Tattenhoe (Historic 2026)
Parish
Shenley Brook End
Agent
Edward Watson

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Tattenhoe Park (Phase 2) Snelshall Street H7 To H8 Milton Keynes

This record has no verified map location.

Documents 168 of 168

DocumentPublishedAction
C00209 TATTENHOE PARK S38 AGREEMENT PLAN AGREEMENT 2APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE S38 CONSTRUCTION DETAILSAPPCONIN - Condition Submitted Details · PDF14 Mar 2022View
Section 38 Street Lighting Layout Sht 2 of 2 Milton KeynesAPPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE FINISHES PLOTS 1-5, 91-95, 165, 175, 282-286 AND 298APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
EXTERNAL WORKS PLOTS 124 - 126, 142 - 149 & 160APPSUPER - Superseded Plans · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE LONGITUDINAL SECTIONS ROAD 12 AND 12AAPPCONIN - Condition Submitted Details · PDF21 Dec 2021View
Landscape Plan Whole SiteAPPSUPER - Superseded Plans · PDF21 Dec 2021View
BIRD & BAT BOX LOCATIONS PLOTS 7 - 97APPCONIN - Condition Submitted Details · PDF14 Mar 2022View
Section 38 Street Lighting Layout Sht 1 of 2 Milton KeynesAPPCONIN - Condition Submitted Details · PDF21 Dec 2021View
Arboricultural Method StatementAPPCONIN - Condition Submitted Details · PDF14 Mar 2022View
Landscape Plan Plots 98 - 136 Plots 138 - 144APPSUPER - Superseded Plans · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE DRAINAGE PLOTS 16-21, 29-33, 66-70, 83-89, 248-253, 261-272 AND 275-276APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
Landscape Plan Plots 34-65, 71-72 204-219,229-231,236-241APPSUPER - Superseded Plans · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE LONGITUDINAL SECTIONS ROAD 11APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE S38 CONSTRUCTION DETAILSAPPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE DRAINAGE PLOTS 176-203 AND 220-224APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE LEVELS PLOTS 296 AND 301-318APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE FINISHES PLOTS 98-131APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MANHOLE SCHEDULESAPPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE LEVELS PLOTS 230-238, 242-249 AND 252-257APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE LONGITUDINAL SECTIONS ROAD 1APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
Landscape Plan Plots 19 -28, 89 - 97 272 -273APPSUPER - Superseded Plans · PDF21 Dec 2021View
Landscape Plan Plots 231-236 242-247,254-257 POSAPPSUPER - Superseded Plans · PDF21 Dec 2021View
Landscape Plan Plots 137, 151 - 157 165 - 175APPSUPER - Superseded Plans · PDF21 Dec 2021View
EXTERNAL WORKS PLOTS 4 - 6, 149 - 153, 158 - 164 & 166 - 175APPCONIN - Condition Submitted Details · PDF11 Mar 2022View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE FINISHES PLOTS 116, 129-143 AND 151-157APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
EXTERNAL WORKS PLOTS 258 - 263, 272 - 281 & 309 - 313APPSUPER - Superseded Plans · PDF21 Dec 2021View
Landscape Plan Plots 254, 258-263, 275-281 and POS Sheet 10 of 16APPCONIN - Condition Submitted Details · PDF14 Mar 2022View
Senior Engineer - Highways Adoptions commentsAPPCONR - Consultation Responses4 Jan 2022View
EXTERNAL WORKS PLOTS 204 - 219, 225 - 233 & 241APPCONIN - Condition Submitted Details · PDF11 Mar 2022View
Landscape Plan Plot 1 - 6, 164, 284 - 292APPSUPER - Superseded Plans · PDF21 Dec 2021View
Landscape Plan Plots 301 - 318 Sheet 11 of 16APPCONIN - Condition Submitted Details · PDF14 Mar 2022View
MATERIALS PLANAPPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE DRAINAGE PLOTS 116, 129-143 AND 151-157APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
Landscape Plan Plots 145-150 158 - 163 Sheet 2 of 16APPCONIN - Condition Submitted Details · PDF14 Mar 2022View
EXTERNAL WORKS PLOTS 258 - 263, 272 - 281 & 309 - 313APPCONIN - Condition Submitted Details · PDF11 Mar 2022View
EXTERNAL WORKS PLOTS 176 - 203, 220 - 224APPCONIN - Condition Submitted Details · PDF11 Mar 2022View
Landscape Plan Plots 145-150 158 - 163APPSUPER - Superseded Plans · PDF21 Dec 2021View
EXTERNAL WORKS PLOTS 21 - 27 & 89 - 97APPCONIN - Condition Submitted Details · PDF11 Mar 2022View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE LEVELS PLOTS 116, 129-143 AND 151-157APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE LEVELS PLOTS 7-17, 70 AND 73-79APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE DRAINAGE PLOTS 204-219, 225-233 AND 241APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
Landscape Plan Plots 272 - 274, 282 - 283 294-300, 308-311, POS Sheet 6 of 16APPCONIN - Condition Submitted Details · PDF14 Mar 2022View
EXTERNAL WORKS BOUNDARY FENCE DETAILSAPPCONIN - Condition Submitted Details · PDF14 Mar 2022View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE DRAINAGE PLOTS 4-6, 149-153, 158-164 AND 166-175APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE FINISHES PLOTS 5-6, 282-295, 297-300 AND 306APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
EXTERNAL WORKS PLOTS 16 - 21, 29 - 33, 66 - 70, 83 - 89, 248 - 253, 261 - 272 & 275 - 276APPSUPER - Superseded Plans · PDF21 Dec 2021View
Landscape Plan Plot 1 - 6, 164, 284 - 292 Sheet 4 of 16APPCONIN - Condition Submitted Details · PDF14 Mar 2022View
Quotation for Tattenhoe Park LEAP - Supply & Install V4APPCONIN - Condition Submitted Details · PDF15 Mar 2022View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE DRAINAGE PLOTS 98-131APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE FINISHES PLOTS 258-263, 272-281 AND 309-313APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
EXTERNAL WORKS PLOTS 5 - 6, 282 - 295, 297 - 300 & 306APPSUPER - Superseded Plans · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE FINISHES PLOTS 296 AND 301-318APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE FINISHES PLOTS 21-27 AND 89-97APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
Landscape Plan 292-296, 299-311 Sheet 7 of 16APPCONIN - Condition Submitted Details · PDF14 Mar 2022View
C00209 TATTENHOE PARK S38 AGREEMENT PLAN AGREEMENT 1APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
Landscape Plan Plots 7-19,32-33,(part of) 34-41,69-70,73-79APPSUPER - Superseded Plans · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE LEVELS PLOTS 258-263, 272-281 AND 309-313APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
Pre-construction Badger Survey (Letter from AECOM 24th February 2020)APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
BIRD & BAT BOX LOCATIONS PLOTS 98 - 175APPCONIN - Condition Submitted Details · PDF14 Mar 2022View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE FINISHES PLOTS 230-238, 242-249 AND 252-257APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
GCN Licensing OfficerAPPCONR - Consultation Responses17 Mar 2022View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE LONGITUDINAL SECTIONS ROADS 3A, 4 AND 4AAPPCONIN - Condition Submitted Details · PDF21 Dec 2021View
EXTERNAL WORKS HEDGEHOG HIGHWAY & SCREEN WALL DETAILSAPPCONIN - Condition Submitted Details · PDF14 Mar 2022View
Landscape Architect commentsAPPCONR - Consultation Responses17 Jan 2022View
Landscape Plan Plots 7-19,32-33,(part of) 34-41,69-70,73-79 Sheet 8 of 16APPCONIN - Condition Submitted Details · PDF14 Mar 2022View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE LONGITUDINAL SECTIONS ROAD 8 AND 9APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
Landscape Plan Plots 204-219 226-241 and POSAPPSUPER - Superseded Plans · PDF21 Dec 2021View
C00209 TATTENHOE PARK MANHOLE SCHEDULESAPPCONIN - Condition Submitted Details · PDF21 Dec 2021View
REFUSE VEHICLE TRACKING SHEET 1APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE FINISHES PLOTS 7-17, 70 AND 73-79APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE LEVELS PLOTS 1-5, 91-95, 165, 175, 282-286 AND 298APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
EXTERNAL WORKS PLOTS 296 & 301 - 318APPCONIN - Condition Submitted Details · PDF11 Mar 2022View
EXTERNAL WORKS PLOTS 124 - 126, 142 - 149 & 160APPCONIN - Condition Submitted Details · PDF11 Mar 2022View
EXTERNAL WORKS PLOTS 116, 129 - 143 & 151 - 157APPSUPER - Superseded Plans · PDF21 Dec 2021View
SERVICES OVERLAY PLOTS 98 - 175APPCONIN - Condition Submitted Details · PDF14 Mar 2022View
Management PlanAPPCONIN - Condition Submitted Details · PDF31 Mar 2022View
SERVICES OVERLAY PLOTS 204 - 281APPCONIN - Condition Submitted Details · PDF14 Mar 2022View
EXTERNAL WORKS PLOTS 7 - 17, 70 & 73 - 79APPCONIN - Condition Submitted Details · PDF11 Mar 2022View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE DRAINAGE PLOTS 1-5, 91-95, 165, 175, 282-286 AND 298APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE LEVELS PLOTS 124-126, 142-149 AND 160APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
LLFAAPPCONR - Consultation Responses · PDF12 Jan 2022View
TIMBER FRAME BIRD AND BAT BOXESAPPCONIN - Condition Submitted Details · PDF14 Mar 2022View
EXTERNAL WORKS PLOTS 4 - 6, 149 - 153, 158 - 164 & 166 - 175APPSUPER - Superseded Plans · PDF21 Dec 2021View
Application FormAPPFRWEB - Application Form - Web Form · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE S38 CONSTRUCTION DETAILSAPPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE DRAINAGE PLOTS 258-263, 272-281 AND 309-313APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
EXTERNAL WORKS PLOTS 21 - 27 & 89 - 97APPSUPER - Superseded Plans · PDF21 Dec 2021View
Landscape Plan Plots 204-219 226-241 and POS Sheet 14 of 16APPCONIN - Condition Submitted Details · PDF14 Mar 2022View
EXTERNAL WORKS PLOTS 34 - 65, 71 - 73, 204 - 219 229 - 230 & 237 - 241APPSUPER - Superseded Plans · PDF21 Dec 2021View
EXTERNAL WORKS PLOTS 16 - 21, 29 - 33, 66 - 70, 83 - 89, 248 - 253, 261 - 272 & 275 - 276APPCONIN - Condition Submitted Details · PDF11 Mar 2022View
SERVICES OVERLAY PLOTS 1 - 6, 282 - 318APPCONIN - Condition Submitted Details · PDF14 Mar 2022View
EXTERNAL WORKS PLOTS 204 - 219, 225 - 233 & 241APPSUPER - Superseded Plans · PDF21 Dec 2021View
EXTERNAL WORKS PLOTS 296 & 301 - 318APPSUPER - Superseded Plans · PDF21 Dec 2021View
EXTERNAL WORKS PLOTS 116, 129 - 143 & 151 - 157APPCONIN - Condition Submitted Details · PDF11 Mar 2022View
EXTERNAL WORKS PLOTS 34 - 65, 71 - 73, 204 - 219 229 - 230 & 237 - 241APPCONIN - Condition Submitted Details · PDF11 Mar 2022View
Landscape Plan Plots 176-228 Sheet 13 of 16APPCONIN - Condition Submitted Details · PDF14 Mar 2022View
EXTERNAL WORKS PLOTS 1 - 5, 91 - 95, 165, 175, 282 - 286 & 298APPCONIN - Condition Submitted Details · PDF11 Mar 2022View
EXTERNAL WORKS PLOTS 176 - 203, 220 - 224APPSUPER - Superseded Plans · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE LEVELS PLOTS 204-219, 225-233 AND 241APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
Ecologist - Revised CommentsAPPCONR - Consultation Responses · PDF30 Mar 2022View
Landscape Plan Plots 272 - 274, 282 - 283 294-300, 308-311, POSAPPSUPER - Superseded Plans · PDF21 Dec 2021View
South Midlands Great Crested Newt District Licensing Scheme Certificate NSP063MKCAPPCONIN - Condition Submitted Details · PDF21 Dec 2021View
Landscape Plan Plots 301 - 318APPSUPER - Superseded Plans · PDF21 Dec 2021View
EXTERNAL WORKS PLOTS 230 - 238, 242 - 249 & 252 - 257APPSUPER - Superseded Plans · PDF21 Dec 2021View
Biodiversity Enhancement Scheme and Management PlanAPPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE LEVELS PLOTS 5-6, 282-295, 297-300 AND 306APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE LONGITUDINAL SECTIONS DRAINAGE OUTSIDE OF ADOPTED ROADSAPPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE LEVELS PLOTS 4-6, 149-153, 158-164 AND 166-175APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE LEVELS PLOTS 16-21, 29-33, 66-70, 83-89, 248-253, 261-272 AND 275-276APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
Landscape Plan Plots 29-33, 66-68 80-88,248-253,264-271 Sheet 9 of 16APPCONIN - Condition Submitted Details · PDF14 Mar 2022View
Landscape Plan Plots 98 - 136 Plots 138 - 144 Sheet 1 of 16APPCONIN - Condition Submitted Details · PDF14 Mar 2022View
C00209 TATTENHOE PARK S104 CONSTRUCTION DETAILSAPPCONIN - Condition Submitted Details · PDF21 Dec 2021View
Landscape Plan Whole Site Sheet 16 of 16APPCONIN - Condition Submitted Details · PDF14 Mar 2022View
REFUSE VEHICLE TRACKING SHEET 2APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK S104 CONSTRUCTION DETAILSAPPCONIN - Condition Submitted Details · PDF21 Dec 2021View
EXTERNAL WORKS PLOTS 7 - 17, 70 & 73 - 79APPSUPER - Superseded Plans · PDF21 Dec 2021View
Application Cover LetterAPPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE FINISHES PLOTS 16-21, 29-33, 66-70, 83-89, 248-253, 261-272 AND 275-276APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
REFUSE VEHICLE TRACKING SHEET 3APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE LONGITUDINAL SECTIONS ROADS 7 AND 7AAPPCONIN - Condition Submitted Details · PDF21 Dec 2021View
Landscape Plan Plots 34-65, 71-72 204-219,229-231,236-241 Sheet 12 of 16APPCONIN - Condition Submitted Details · PDF14 Mar 2022View
LLFAAPPCONR - Consultation Responses · PDF13 Jan 2022View
Materials Plan AppendixAPPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE FINISHES PLOTS 204-219, 225-233 AND 241APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE LEVELS PLOTS 34-65, 71-73, 204-219, 229-230 AND 237-241APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
Landscape Architect comments - revisedAPPCONR - Consultation Responses · PDF31 Mar 2022View
EXTERNAL WORKS PLOTS 1 - 5, 91 - 95, 165, 175, 282 - 286 & 298APPSUPER - Superseded Plans · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE FINISHES PLOTS 4-6, 149-153, 158-164 AND 166-175APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
EXTERNAL WORKS PLOTS 98 - 131APPCONIN - Condition Submitted Details · PDF11 Mar 2022View
Landscape Plan Plots 176-228APPSUPER - Superseded Plans · PDF21 Dec 2021View
LANDSCAPE MANAGEMENT PLAN (Countryside Properties)APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
BIRD & BAT BOX LOCATIONS PLOTS 204 - 261APPCONIN - Condition Submitted Details · PDF14 Mar 2022View
Countryside Officer - GCNAPPCONR - Consultation Responses7 Jan 2022View
SERVICES OVERLAY PLOTS 7 - 97APPCONIN - Condition Submitted Details · PDF14 Mar 2022View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE DRAINAGE PLOTS 230-238, 242-249 AND 252-257APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
Landscape Strategy Whole SiteAPPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE DRAINAGE PLOTS 5-6, 282-295, 297-300 AND 306APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
EXTERNAL WORKS PLOTS 98 - 131APPSUPER - Superseded Plans · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE DRAINAGE PLOTS 34-65, 71-73, 204-219, 229-230 AND 237-241APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
EXTERNAL WORKS PLOTS 230 - 238, 242 - 249 & 252 - 257APPCONIN - Condition Submitted Details · PDF11 Mar 2022View
Landscape Plan Plots 231-236 242-247,254-257 POS Sheet 15 of 16APPCONIN - Condition Submitted Details · PDF14 Mar 2022View
Landscape Plan Whole Site Lighting & Play Area EasementsAPPCONIN - Condition Submitted Details · PDF14 Mar 2022View
00007327 Tattenhoe Park LEAP - Quote CADAPPCONIN - Condition Submitted Details · PDF15 Mar 2022View
Landscape Plan Plots 29-33, 66-68 80-88,248-253,264-271APPSUPER - Superseded Plans · PDF21 Dec 2021View
EXTERNAL WORKS PLOTS 5 - 6, 282 - 295, 297 - 300 & 306APPCONIN - Condition Submitted Details · PDF11 Mar 2022View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE FINISHES PLOTS 176-203 AND 220-224APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
Arboricultural Impact Assessment Report Part 2APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE DRAINAGE PLOTS 7-17, 70 AND 73-79APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE LONGITUDINAL SECTIONS ROAD 9A,10 AND 10AAPPCONIN - Condition Submitted Details · PDF21 Dec 2021View
Decision NoticeAPPDNOT - Decision Notice · PDF16 Jun 2022View
Landscape Plan Plots 19 -28, 89 - 97 272 -273 Sheet 5 of 16APPCONIN - Condition Submitted Details · PDF14 Mar 2022View
Landscape Plan Plots 254, 258-263, 275-281 and POSAPPSUPER - Superseded Plans · PDF21 Dec 2021View
LLFAAPPCONR - Consultation Responses · PDF16 Mar 2022View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE S38 CONSTRUCTION DETAILSAPPSUPER - Superseded Plans · PDF21 Dec 2021View
Landscape Plan Plots 137, 151 - 157 165 - 175 Sheet 3 of 16APPCONIN - Condition Submitted Details · PDF14 Mar 2022View
Arboricultural Impact Assessment Report Part 1APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
BIRD & BAT BOX LOCATIONS PLOTS 1 - 6, 282 - 318APPCONIN - Condition Submitted Details · PDF14 Mar 2022View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE DRAINAGE PLOTS 296 AND 301-318APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE FINISHES PLOTS 124-126, 142-149 AND 160APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE LEVELS PLOTS 98-131APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE LONGITUDINAL SECTIONS ROADS 2, 2A AND 3APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE LEVELS PLOTS 176-203 AND 220-224APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE LONGITUDINAL SECTIONS ROADS 5, 6 AND 6AAPPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE DRAINAGE PLOTS 21-27 AND 89-97APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE FINISHES PLOTS 34-65, 71-73, 204-219, 229-230 AND 237-241APPCONIN - Condition Submitted Details · PDF21 Dec 2021View
Landscape Plan 292-296, 299-311APPSUPER - Superseded Plans · PDF21 Dec 2021View
C00209 TATTENHOE PARK MAIN INFRASTRUCTURE DRAINAGE PLOTS 124-126, 142-149 AND 160APPCONIN - Condition Submitted Details · PDF21 Dec 2021View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Split
Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.