Council planning record

Part single storey part two storey extension to rear, single storey extension to front and installation of access doors to side

32, Paddock Wood, Middlesbrough, TS8 0SA

Application Approve with ConditionsReference: 26/0239/FULMiddlesbrough Borough Council

Last published check: 1 Oct 2026, 20:04. Check the council record for more recent changes.

Application location

32, Paddock Wood, Middlesbrough, TS8 0SA

This record has no verified map location.

Application summary

Status
Application Approve with Conditions
Application type
Full Planning
Received
1 Jun 2026
Validated
Not published
Determination deadline
24 Sept 2026
Local authority
Middlesbrough Borough Council

Application overview

Part single storey part two storey extension to rear, single storey extension to front and installation of access doors to side

Proposal details

Reference
26/0239/FUL
Ward
Coulby Newham
Agent
Mr Neil Keenan
UPRN
100110128755

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 14 of 14

DocumentPublishedAction
Existing floor plans Dwg no. 001ADrawing1 Jun 2026View
Existing elevations Dwg no. 002ADrawing1 Jun 2026View
Proposed floor plans Dwg no. 003ADrawing1 Jun 2026View
Proposed elevations Dwg no. 004ADrawing1 Jun 2026View
Existing and proposed roof plan Dwg no. 005ADrawing1 Jun 2026View
Location plan Dwg no. 006ADrawing1 Jun 2026View
Existing and proposed site plan Dwg no. 007ADrawing1 Jun 2026View
Application form redactedApplication Form1 Jun 2026View
Proposed floor plans Dwg no. 003 REV BRevised Drawing5 Jun 2026View
Proposed elevations Dwg no. 004 REV BRevised Drawing5 Jun 2026View
26-102-003-D-P Proposed Floor Plans Rev DRevised Drawing2 Sept 2026View
26-102-004-D-P Proposed Elevations Rev DRevised Drawing2 Sept 2026View
Officer ReportReport21 Sept 2026View
Decision NoticeDecision21 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received date

    Published milestoneCouncil source
  2. Registration date

    Published milestoneCouncil source
  3. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Dispatch date

    Published milestoneCouncil source
  6. Decision date

    Published milestoneCouncil source
  7. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve with Conditions
Decision Notice
Planning conditions
  1. Time Limit The development to which this permission relates must be begun not later than the expiration of three years beginning with the date on which this permission is granted. Reason: In order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended).
  2. Approved Plans The development hereby approved shall be carried out in complete accordance with the plans and specifications detailed below and shall relate to no other plans: a) Location Plan (Dwg no 006A) received 1st June 2026 b) Existing and proposed site plan (Dwg no. 007A) received 1st June 2026 c) Proposed Elevations Rev D (Dwg no. 26-102-004-D-P) received 2nd September 2026 d) Proposed Floor Plans Rev D (Dwg no. 26-102-003-D-P) received 2nd September 2026 Reason: For the avoidance of doubt and to ensure that the development is carried out as approved.
  3. Materials - Matching The materials to be used in the construction of the external surfaces (including walls, roof & windows) of the development hereby permitted shall match those used in the existing building or shall be in accordance with details which have first been submitted to and approved in writing by the Local Planning Authority. Thereafter the development shall be carried out in accordance with the approved details. Reason: To ensure the use of appropriate materials in the interests of the visual amenities of the area having regard for Policies DC1, CS4 and CS5 of the Local Plan and section 12 of the NPPF.
  4. Reason for Approval This application is satisfactory in that the design of the proposed extensions accords with the principles of the National Planning Policy Framework (NPPF) and, where appropriate, the Council has worked with the applicant in a positive and proactive way in line with the NPPF, including through the negotiation of amendments to the roof form and fenestration of the scheme. In addition the extensions accord with the local policy requirements (Policies CS5 & DC1 of the Council's Local Development Framework, and Policies CR2 and CR3 of the emerging Publication Local Plan). In particular the extensions are designed so that their appearance is complementary to the existing dwellinghouse and so that they will not have a detrimental impact on the amenity of any adjoining or nearby resident. The extensions will not prejudice the character and appearance of the area and will not significantly affect any landscaping nor prevent adequate and safe access to the dwelling. The application is therefore considered to be an acceptable form of development, fully in accordance with the relevant policy guidance and there are no material considerations which would indicate that the development should be refused.
  5. Environmental Construction Management This informative is aimed at ensuring there are no breaches of environmental legislation on the site throughout the construction phase of the development and contractors and developers should adhere to the following advice. For any further information and advice relating to environmental construction management please contact the authorities Environmental Protection Service. • All demolition, construction works and ancillary operations, including deliveries to and dispatch from the site should be restricted to between the hours: o 08.00 to 18.00 Monday to Friday o 09.00 to 13.00 Saturday o Not at all on Sundays and Bank Holidays. • All work should be carried out in such a manner so as to comply with the general recommendations of British Standards BS 5228-1:2009 + A1:2014 and BS 5228-2:2009 + A1:2014, a code of practice for "Noise and Vibration Control on Construction and Open Sites". • Best practicable means should be employed at all times in order to minimise noise, vibration, dust, odour and light emissions. Information on the control of dust from construction sites can be found using the following link. Construction-Dust-Guidance-Jan-2024.pdf (iaqm.co.uk) • All plant and machinery should be operated, sited and maintained in order to minimise disturbance. All items of machinery powered by internal combustion engines should be properly silenced and/or fitted with effective and well maintained mufflers in accordance with manufacturers instructions. • There should be no bonfires on the site
  6. Rights of Access/Encroachment This planning approval does not permit any person to access another person’s land/property to enable the works to be completed, without their consent. Any encroachment into another person’s land/property above or below ground is a civil matter to be resolved between the relevant parties.
  7. Building Regulations Compliance with Building Regulations will be required. Before commencing works it is recommended that discussions take place with the Building Control section of this Council. You can contact Building Control on 01642 729375 or by email at buildingcontrol@middlesbrough.gov.uk. Where a building regulations approval is obtained which differs from your planning permission, you should discuss this matter with the Local Planning Authority to determine if the changes require further consent under planning legislation.
  8. Deliveries to Site It should be ensured that, during construction, deliveries to the site do not obstruct the highway. If deliveries are to be made which may cause an obstruction, then early discussion should be had with the Highway Authority on the timing of these deliveries and measures that may be required so as to mitigate the effect of the obstruction to the general public.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.