Time Limit The development to which this permission relates must be begun not later than the expiration of three years beginning with the date on which this permission is granted. Reason: In order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended).
Approved Plans The development hereby approved shall be carried out in complete accordance with the plans and specifications detailed below and shall relate to no other plans: a. Location Plan JCHMSA-PHS-ZZ_ZZ-D-A-07001 REV P01 dated 8th May 2026 b. Existing site plan JCHMSA-PHS-XX-00-D-A-07004 -PO1 dated 8th May 2026 c. Proposed site plan JCHMSA-PHS-XX-00-D-A-07005 REV PO1 dated 8th May 2026 d. Existing elevations JCHMSA-PHS-XX-ZZ-D-A-07007 REV P01 dated 8th May 2026 e. Proposed elevations JCHMSA-PHS-XX-ZZ-D-A-07008 REV P01 dated 8th May 2026 f. Existing block plan JCHMSA-PHS-ZZ-ZZ-D-A-07002 REV P01 dated 8th May 2026 g. Proposed block plan JCHMSA-PHS-ZZ-ZZ-D-A-07003 REV P01 dated 8th May 2026 h. Proposed floor plan JCHMSA-PHS-ZZ-ZZ-D-A-07006 REV P01 dated 8th May 2026 Reason: For the avoidance of doubt and to ensure that the development is carried out as approved.
Temporary Permission - Buildings The building hereby permitted shall be removed and the land restored to its former condition on or before 9th June 2031 in accordance with a programme of works to be submitted to and approved in writing by the Local Planning Authority. Reason: The building is not considered suitable for permanent retention on the site by virtue of its scale, design and location having regard for Policies DC1, CS4 and CS5 of the Local Plan and section 12 of the NPPF.
Biodiversity Gain Plan The reinstatement of the site following the removal of the temporary building hereby approved shall not commence until a Biodiversity Gain Plan has been submitted to and approved in writing by the Local Planning Authority. Reason: As required under the statutory framework introduced by Schedule 7A of the Town and Country Planning Act 1990.
Biodiversity Net Gain Maintenance Plan The reinstatement of the site following the removal of the temporary modular building hereby permitted shall be carried out in accordance with the approved Biodiversity Gain Plan to ensure that there is a minimum 10% net gain in biodiversity within a 30-year period as a result of the development and the Biodiversity Gain Plan shall be implemented in full. No reinstatement of the site following the removal of the temporary modular building shall commence until a Biodiversity Monitoring Plan to ensure that there is a minimum 10% net gain in biodiversity within a 30-year period as a result of the removal of the temporary modular building has been submitted to and agreed in writing by the Local Planning Authority. The Biodiversity Management Plan shall include 30-year objectives, management responsibilities, maintenance schedules and a methodology to ensure the submission of monitoring reports. Monitoring reports will be submitted to the Local Planning Authority during years 2, 5, 7, 10, 20 and 30 from commencement of development unless otherwise stated in the Biodiversity Management Plan, demonstrating how the BNG is progressing towards achieving its objectives, evidence of arrangements and any rectifying measures needed to be undertaken to address a shortfall in predicted levels of gain. Reason: In the interests of ensuring measurable net gains to biodiversity and in accordance with paragraphs 180 and 186 of the National Planning Policy Framework.
Low level lighting Any external lighting to be installed below 2 metres in height within the courtyard area as part of this proposal shall be low level lighting (below 1 lux 5 metres from the light source) unless otherwise agreed with the Local Planning Authority. Reason : - To protect and enhance the ecology of the site and ensure the survival and protection of important species and those protected by legislation that could be adversely affected by the development having regard to Policy CS4 of the Local Plan and Section 15 of the NPPF.
Reason for approval The application is satisfactory in that the design and appearance of the proposed temporary modular building accords with the principles of the National Planning Policy Framework (NPPF) and, where appropriate, the Council has worked with the applicant in a positive and proactive way in line with paragraph 38 of the NPPF (2024). In addition, the proposed temporary modular building accords with the local policy requirements (Policy CS4 and CS5 & DC1 of the Council's Local Development Framework). In particular, the proposed temporary modular building is designed so that the appearance is complementary to the existing buildings within the hospital grounds and will not have a detrimental impact on the appearance of the existing building or wider street scene. The design and location of the temporary modular building is considered not to result in a detrimental impact on the amenity of the existing users of the nearby hospital buildings or on highway safety. The application is therefore considered to be acceptable, fully in accordance with the relevant policy guidance and there are no material considerations which indicate that the application should be refused.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.