Council planning record

Enlargement of 2no. windows and installation of new door to South elevation

TRINITY METHODIST CHURCH, Stainsby Road, Middlesbrough, TS5 4JS

Application Approve with ConditionsReference: 25/0675/FULMiddlesbrough Borough Council

Last published check: 4 Oct 2026, 12:43. Check the council record for more recent changes.

Application location

TRINITY METHODIST CHURCH, Stainsby Road, Middlesbrough, TS5 4JS

This record has no verified map location.

Application summary

Status
Application Approve with Conditions
Application type
Full Planning
Received
23 Dec 2025
Validated
Not published
Determination deadline
17 Feb 2026
Local authority
Middlesbrough Borough Council

Application overview

Enlargement of 2no. windows and installation of new door to South elevation

Proposal details

Reference
25/0675/FUL
Alternative references
PP-14583069
Ward
Ayresome
UPRN
10007598486

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 9 of 9

DocumentPublishedAction
Design & access statementSupporting Documents23 Dec 2025View
Existing & proposed floor plans Dwg no. 2025/T/01Drawing23 Dec 2025View
Existing & proposed South elevation Dwg no. 2025/T/03Drawing23 Dec 2025View
Location plan Dwg no. 2025/T/04Drawing23 Dec 2025View
Application form redactedApplication Form23 Dec 2025View
Consultee Notification ListConsultation Notification List24 Dec 2025View
Neighbour Notification ListNeighbour Notification List24 Dec 2025View
Decision Notice10 Feb 2026View
Officer ReportReport10 Feb 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Dispatch date

    Published milestoneCouncil source
  7. Decision date

    Published milestoneCouncil source
  8. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve with Conditions
Decision Notice
Planning conditions
  1. Time Limit The development to which this permission relates must be begun not later than the expiration of three years beginning with the date on which this permission is granted. Reason: In order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended).
  2. Approved Plans The development hereby approved shall be carried out in complete accordance with the plans and specifications detailed below and shall relate to no other plans: a) Location plan (Dwg no. 2025/T/04) received 23rd December 2025 b) Existing & proposed floor plans (Dwg no. 2025/T/01) received 23rd December 2025 c) Existing & proposed South elevation (Dwg no. 2025/T/03) received 23rd December 2025 Reason: For the avoidance of doubt and to ensure that the development is carried out as approved.
  3. Materials - Approved Details The development hereby approved shall be carried out in complete accordance with the external finishing materials detailed in the approved plans, or in accordance with details to be submitted to and approved in writing by the Local Planning Authority. Thereafter the development shall be carried out in accordance with the approved details. Reason: To ensure the use of appropriate materials in the interests of the visual amenities of the area having regard for Policies DC1, CS4 and CS5 of the Local Plan and section 12 of the NPPF.
  4. Reason for Approval This application is satisfactory in that the design of the proposed development accords with the principles of the National Planning Policy Framework (NPPF) and, where appropriate, the Council has worked with the applicant in a positive and proactive way in line with the NPPF. In addition the development accords with the local policy requirements (Policies CS5 & DC1 of the Council's Local Development Framework). In particular the development is designed so that the appearance is complementary to the existing building and so that there will not be a detrimental impact on the amenity of any adjoining or nearby resident. The development will not prejudice the character and appearance of the area and will not significantly affect any landscaping nor prevent adequate and safe access to the building. The application is therefore considered to be an acceptable form of development, fully in accordance with the relevant policy guidance and there are no material considerations which would indicate that the development should be refused.
  5. Deliveries to Site It should be ensured that, during construction, deliveries to the site do not obstruct the highway. If deliveries are to be made which may cause an obstruction, then early discussion should be had with the Highway Authority on the timing of these deliveries and measures that may be required so as to mitigate the effect of the obstruction to the general public.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.