Council planning record

Replacement of existing external garage door and installation of a white UPVC double-glazed window

45, Turnbull Way, Middlesbrough, TS4 3RS

Application Approve with ConditionsReference: 25/0504/FULMiddlesbrough Borough Council

Last published check: 1 Oct 2026, 21:59. Check the council record for more recent changes.

Application location

45, Turnbull Way, Middlesbrough, TS4 3RS

This record has no verified map location.

Application summary

Status
Application Approve with Conditions
Application type
Full Planning
Received
17 Sept 2025
Validated
Not published
Determination deadline
12 Dec 2025
Local authority
Middlesbrough Borough Council

Application overview

Replacement of existing external garage door and installation of a white UPVC double-glazed window

Proposal details

Reference
25/0504/FUL
Alternative references
PP-14303959
Ward
Marton East
Agent
Reece Simpson
UPRN
10023177225

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 10 of 10

DocumentPublishedAction
Design & access statementSection 32 Notice17 Sept 2025View
Block & location planDrawing17 Sept 2025View
Existing & proposed floor plansDrawing17 Sept 2025View
Existing & proposed elevationsDrawing17 Sept 2025View
Application form redactedApplication Form17 Sept 2025View
Location planDrawing10 Oct 2025View
Consultee Notification ListConsultation Notification List13 Oct 2025View
Neighbour Notification ListNeighbour Notification List13 Oct 2025View
Decision NoticeDecision11 Dec 2025View
Officer ReportReport11 Dec 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Dispatch date

    Published milestoneCouncil source
  7. Decision date

    Published milestoneCouncil source
  8. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve with Conditions
Decision Notice
Planning conditions
  1. Time Limit The development to which this permission relates must be begun not later than the expiration of three years beginning with the date on which this permission is granted. Reason: In order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended).
  2. Approved Plans The development hereby approved shall be carried out in complete accordance with the plans and specifications detailed below and shall relate to no other plans: a) Location Plan received 10th October 2025 b) Existing & proposed floor plans (Drawing No. RLC-01-XX-DR-BS-P-0002) received 17th September 2025 c) Existing & proposed elevations (Drawing No. RLC-01-XX-DR-BS-P-0001) received 17th September 2025 Reason: For the avoidance of doubt and to ensure that the development is carried out as approved.
  3. Materials - Matching The materials to be used in the construction of the external surfaces (including walls, roof & windows) of the development hereby permitted shall match those used in the existing building or shall be in accordance with details which have first been submitted to and approved in writing by the Local Planning Authority. Thereafter the development shall be carried out in accordance with the approved details. Reason: To ensure the use of appropriate materials in the interests of the visual amenities of the area having regard for Policies DC1, CS4 and CS5 of the Local Plan and section 12 of the NPPF.
  4. Reason for Approval This application is satisfactory in that the design of the proposed window accords with the principles of the National Planning Policy Framework (NPPF) and, where appropriate, the Council has worked with the applicant in a positive and proactive way in line with the NPPF. In addition the window accords with the local policy requirements (Policies CS5 & DC1 of the Council's Local Development Framework). In particular the window is designed so that the appearance is complementary to the existing dwellinghouse and so that it will not have a detrimental impact on the amenity of any adjoining or nearby resident. The window will not prejudice the character and appearance of the area and will not significantly affect any landscaping nor prevent adequate and safe access to the dwelling. The application is therefore considered to be an acceptable form of development, fully in accordance with the relevant policy guidance and there are no material considerations which would indicate that the development should be refused.
  5. Building Regulations Compliance with Building Regulations will be required. Before commencing works it is recommended that discussions take place with the Building Control section of this Council. You can contact Building Control on 01642 729375 or by email at buildingcontrol@middlesbrough.gov.uk. Where a building regulations approval is obtained which differs from your planning permission, you should discuss this matter with the Local Planning Authority to determine if the changes require further consent under planning legislation.
  6. Deliveries to Site It should be ensured that, during construction, deliveries to the site do not obstruct the highway. If deliveries are to be made which may cause an obstruction, then early discussion should be had with the Highway Authority on the timing of these deliveries and measures that may be required so as to mitigate the effect of the obstruction to the general public.
  7. Cleaning of Highway The applicant is reminded that it is the responsibility of anybody carrying out building work to ensure that mud, debris or other deleterious material is not deposited from the site onto the highway and, if it is, it shall be cleared by that person. In the case of mud being deposited on the highway wheel washing facilities should be installed at the exit of the development.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.