Council planning record

Two storey extension to side (Demolition of existing single storey extension)

6, Ruskin Avenue, Middlesbrough, TS5 8PJ

Application Approve with ConditionsReference: 25/0326/FULMiddlesbrough Borough Council

Last published check: 3 Oct 2026, 01:17. Check the council record for more recent changes.

Application location

6, Ruskin Avenue, Middlesbrough, TS5 8PJ

This record has no verified map location.

Application summary

Status
Application Approve with Conditions
Application type
Full Planning
Received
10 Jun 2025
Validated
Not published
Determination deadline
19 Sept 2025
Local authority
Middlesbrough Borough Council

Application overview

Two storey extension to side (Demolition of existing single storey extension)

Proposal details

Reference
25/0326/FUL
Alternative references
PP-14088149
Ward
Kader
Agent
Pyramid Architectural Designs
UPRN
100110133431

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 10 of 10

DocumentPublishedAction
Existing plans & elevations Dwg no. 001Drawing12 Jun 2025View
Proposed plans & elevations Dwg no. 002Drawing12 Jun 2025View
Application form redactedApplication Form12 Jun 2025View
Location planDrawing12 Jun 2025View
Existing site plan Dwg no. 003Drawing24 Jun 2025View
Proposed site plan Dwg no. 004Drawing24 Jun 2025View
Consultee Notification ListConsultation Notification List1 Jul 2025View
Neighbour Notification ListNeighbour Notification List1 Jul 2025View
Proposed Plans & Elevations Rev CRevised Drawing15 Sept 2025View
Decision NoticeDecision18 Sept 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received date

    Published milestoneCouncil source
  2. Registration date

    Published milestoneCouncil source
  3. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Dispatch date

    Published milestoneCouncil source
  6. Decision date

    Published milestoneCouncil source
  7. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve with Conditions
Decision Notice
Planning conditions
  1. Time Limit The development to which this permission relates must be begun not later than the expiration of three years beginning with the date on which this permission is granted. Reason: In order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 (as amended).
  2. Approved Plans The development hereby approved shall be carried out in complete accordance with the plans and specifications detailed below and shall relate to no other plans: a) Location Plan - Date produced 10 June 2025 b) Existing Plans and Elevations - Drawing no. 001 Rev A, received 12 June 2025 c) Proposed Plans and Elevations - Drawing no. 002 Rev C, received 15 September 2025 d) Existing Site Plan - Drawing no. 003 Rev A, received 24 June 2025 e) Proposed Site Plan - Drawing no. 004 Rev A, received 24 June 2025 Reason: For the avoidance of doubt and to ensure that the development is carried out as approved.
  3. Materials - Matching The materials to be used in the construction of the external surfaces (including walls, roof & windows) of the development hereby permitted shall match those used in the existing building or shall be in accordance with details which have first been submitted to and approved in writing by the Local Planning Authority. Thereafter the development shall be carried out in accordance with the approved details. Reason: To ensure the use of appropriate materials in the interests of the visual amenities of the area having regard for Policies DC1, CS4 and CS5 of the Local Plan and section 12 of the NPPF.
  4. Reason for Approval It is considered that the proposal is in accordance with the Policies within the Local Development Framework Core Strategy and Development Policies document in that the scale, design and materials proposed are appropriate to the site location and there will be no demonstrable adverse impact on adjacent residential amenity. The Local Planning Authority has acted positively and proactively in determining this application by assessing the proposal against all material considerations, including LDF Policies and any representations that may have been received and subsequently determining to grant planning permission in accordance with the presumption in favour of sustainable development, as set out in the National Planning Policy Framework.
  5. Environmental Construction Management This informative is aimed at ensuring there are no breaches of environmental legislation on the site throughout the construction phase of the development and contractors and developers should adhere to the following advice. For any further information and advice relating to environmental construction management please contact the authorities Environmental Protection Service. • All demolition, construction works and ancillary operations, including deliveries to and dispatch from the site should be restricted to between the hours: o 08.00 to 18.00 Monday to Friday o 09.00 to 13.00 Saturday o Not at all on Sundays and Bank Holidays. • All work should be carried out in such a manner so as to comply with the general recommendations of British Standards BS 5228-1:2009 + A1:2014 and BS 5228-2:2009 + A1:2014, a code of practice for "Noise and Vibration Control on Construction and Open Sites". • Best practicable means should be employed at all times in order to minimise noise, vibration, dust, odour and light emissions. Information on the control of dust from construction sites can be found using the following link. Construction-Dust-Guidance-Jan-2024.pdf (iaqm.co.uk) • All plant and machinery should be operated, sited and maintained in order to minimise disturbance. All items of machinery powered by internal combustion engines should be properly silenced and/or fitted with effective and well maintained mufflers in accordance with manufacturers instructions. • There should be no bonfires on the site
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.